Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
11 May 2026, 4:00 pmClosed
Executive Engineer
RnB Division Qazigund
Stage Contract for Sub- Division Vessu
2026_PWDJK_308738_2
NIT_03//RnB/QZD/26-27/520-35 Dtd 25-04-2026
Open Tender
Civil Works
Percentage
365 days
Qazigund
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer RnB Division Qazigund
₹10,000
12 May 2026
27 Apr 2026
12 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, all leads and lifts as directed by engineer incharge -All kinds of soil | 1 | SQM | 21.15 | ₹21.15 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, ( All kinds of Soil) | 1 | CUM | 225.19 | ₹225.19 |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1 | CUM | 164.21 | ₹164.21 |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc .upto required depth ) and for shafts, wells, cesspits including dressing of sides and ramming of bottoms , including getting out excavated earth and disposal of surplus excavated earth as directed, ( All kinds of Soil) | 1 | CUM | 420.22 | ₹420.22 |
| 5 | Disposal of excavated earth by Mechanical Transport including loading, unloading etc all complete. | - | - | - | - |
| 6 | 1 KM | 1 | CUM | 141.09 | ₹141.09 |
| 7 | 2KM | 1 | CUM | 161.58 | ₹161.58 |
| 8 | 3 KM | 1 | CUM | 181.75 | ₹181.75 |
| 9 | 4KM | 1 | CUM | 201.19 | ₹201.19 |
| 10 | 5KM | 1 | CUM | 219.99 | ₹219.99 |
stage.html
html • 0.02 MB
finance_1000177.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_1000177.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .