| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57,502.65Accepted-AOC | ₹57,502.65 | L1 | Accepted-AOC L1 |
| 2 | L2₹61,026.77+₹3,524.12 (6.13%)Rejected-Finance | ₹61,026.77+₹3,524.12 (6.13%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹77,952.69+₹20,450.04 (35.6%)Rejected-Finance C KOTHANGUDI | ₹77,952.69+₹20,450.04 (35.6%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹78,520.10+₹21,017.45 (36.6%)Rejected-Finance | ₹78,520.10+₹21,017.45 (36.6%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹83,898.24+₹26,395.59 (45.9%)Rejected-Finance | ₹83,898.24+₹26,395.59 (45.9%) | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | K.Velmurugan L1 | Prabhubalaji.S L8 | M.Arumugam L5 | SUMATHI L2 | T.Selvam L6 | Velavan L7 | Vanniyanathan L4 | Balachandar L9 | R.Janakiraman L10 | GAJENDIRAN L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantaling Reinforced Cement concrete approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. | 21.39 | Cum | 550 ₹11,764.5 | 3,100 ₹66,309 | 3,000 ₹64,170 | 2,850 ₹60,961.5 | 2,900 ₹62,031 | 1,650 ₹35,293.5 | 2,766.19 ₹59,168.8 | 2,435 ₹52,084.65 | 380 ₹8,128.2 Lowest | 400 ₹8,556 |
| 2.00 | Dismantling the damaged Brickwork with cement mortar above 3m height clear away from site, complete | 36.69 | Cum | 530 ₹19,445.7 | 150 ₹5,503.5 | 140 ₹5,136.6 | 140 ₹5,136.6 | 150 ₹5,503.5 | 590 ₹21,647.1 | 101 ₹3,705.69 Lowest | 300 ₹11,007 | 302 ₹11,080.38 | 250 ₹9,172.5 |
| 3.00 | Dismantaling Plain Cement concrete from approved quarry including cost and conveyance of all materials to worksite, including labour for mixing laying the concrete with good water and compacting the conorete including labour and all other incidental charges etc., complete. | 15.23 | Cum | 680 ₹10,356.4 | 300 ₹4,569 | 280 ₹4,264.4 | 270 ₹4,112.1 | 300 ₹4,569 | 1,150 ₹17,514.5 | 181.78 ₹2,768.51 Lowest | 500 ₹7,615 | 4,494 ₹68,443.62 | 3,387 ₹51,584.01 |
| 4.00 | Dismantaling Clearing away and carefully Stacking useful and reuse of any Materials for the Door and window reuse in the site | 18.9 | Sqm | 590 ₹11,151 | 164 ₹3,099.6 | 95 ₹1,795.5 | 100 ₹1,890 | 160 ₹3,024 | 85 ₹1,606.5 Lowest | 312.14 ₹5,899.45 | 160 ₹3,024 | 164 ₹3,099.6 | 150 ₹2,835 |
| 5.00 | D/F Old Materials Steel ,Door&Windows | 1 | LS | 1,000 ₹1,000 | 6,000 ₹6,000 | 100 ₹100 Lowest | 1,000 ₹1,000 | 2,000 ₹2,000 | 10,000 ₹10,000 | 5,000 ₹5,000 | 25,000 ₹25,000 | 5,000 ₹5,000 | 1,000 ₹1,000 |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 9,309 ₹9,309 | 13,227 ₹13,227 | 13,548 ₹13,548 | 12,798 ₹12,798 | 13,163 ₹13,163 | 11,891 ₹11,891 | 11,978 ₹11,978 | 8,772 ₹8,772 Lowest | 15,435 ₹15,435 | 12,807 ₹12,807 |
Tender Value
₹1.2 L
EMD Value
₹1,200
Closing Date
12 Aug 2026, 3:00 pmClosed
Block Development officer BP
Panchayat Union Keerapalayam
Dismantling School Building three Class Room at PUMS in Vazhakollai Panchayat
2026_RDTN_688056_3
A2/682/2026-GF -2026-2027
Open Tender
Civil Works - Others
Item Rate
7 days
Panchayat Union Keerapalayam
Refer Tender Document
7 documents required · 7 mandatory
₹0
₹1,200
Panchayat Union Keerapalayam
8 Sept 2026
23 Jul 2026
12 Aug 2026
23 Jul 2026
12 Aug 2026
23 Jul 2026
23 Jul 2026 - 23 Jul 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantaling Reinforced Cement concrete approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. | 21.39 | Cum | - | - |
| 2 | Dismantling the damaged Brickwork with cement mortar above 3m height clear away from site, complete | 36.69 | Cum | - | - |
| 3 | Dismantaling Plain Cement concrete from approved quarry including cost and conveyance of all materials to worksite, including labour for mixing laying the concrete with good water and compacting the conorete including labour and all other incidental charges etc., complete. | 15.23 | Cum | - | - |
| 4 | Dismantaling Clearing away and carefully Stacking useful and reuse of any Materials for the Door and window reuse in the site | 18.9 | Sqm | - | - |
| 5 | D/F Old Materials Steel ,Door&Windows | 1 | LS | - | - |
| 6 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount (in Rupees) | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_827095.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_827095.xls
BOQ • 0.25 MB
TECHNICALBID.pdf
Tender Documents • 0.98 MB
DATECHANGE.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .