Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance | L1 | Accepted-Finance Lower rate | |
| 2 | L2₹4.9 L+₹19,027.73 (4.00%)Accepted-Finance 5 8TH STREET THIRUVOTTIYUR TIRUVALLUR TAMIL NADU 600019 INDIA | THIRUVALLUR | TAMIL NADU | 600019 | L2 | Accepted-Finance Higher rate |
| Sl No | Description | Qty | Unit | NITISH ENGINEERING L1 | KR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Material Cost (Contractor Scope) Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.) MS angle 75 x 75 x 8mm thick | 0.47 | MT | 65,034 ₹30,565.98 Lowest | 67,610 ₹31,776.7 |
| 2.00 | Material Cost (Contractor Scope) Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.) MS Plate 20mm thick | 0.73 | MT | 72,639 ₹53,026.47 Lowest | 75,516 ₹55,126.68 |
| 3.00 | Material Cost (Contractor Scope) Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.) GI pipe ø50mm for hand rail | 180 | Mtr | 624 ₹1,12,320 Lowest | 649 ₹1,16,820 |
| 4.00 | Material Cost (Contractor Scope) Note: If the Iron and Steel material is available at store from the execution work the material portion is deducted in contractor scope.) HT Studs with one nut 20 x 240mm unbrako (or) TVS (or) equivalent | 212 | Nos. | 200 ₹42,400 Lowest | 208 ₹44,096 |
| 5.00 | Labour Cost:Charges for Leading, Lifting of Iron and steel materials including Transportation, T&P consumables | 2.12 | MT | 5,339 ₹11,318.68 Lowest | 5,550 ₹11,766 |
| 6.00 | Labour Cost:Charges for General Fabrication and Erection of Steel structural material at ground level. | 2.12 | MT | 57,543 ₹1,21,991.16 Lowest | 59,822 ₹1,26,822.64 |
| 7.00 | Labour Cost:Painting of Newly erected structures with one coat of protective coating of self priming Epoxy primer and two coats of Epoxy paint using different shades after thorough scrapping with emery sheet with manual labour and as per the direction and satisfaction of the Engineer in charge, the rate including the cost of Paint, T& P labour, lead, lift, etc., complete | 202 | m² | 515 ₹1,04,030 Lowest | 536 ₹1,08,272 |
Tender Value
Refer Docs
EMD Value
₹5,100
Closing Date
12 Aug 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chief Engineer
The Chief Engineer, North Chennai Thermal Power Station - I, Chennai - 120
NCTPS I Operation Circle CA Dn CWPH Providing new hand rails supports in fore bay entrance of CWPH including cost of Material and Consumables and hire charges for T and Ps
2025_EB_586702_1
CE/NCTPS-I/SE/OPN/40/2025-26
Open Tender
Power/Energy Projects/Products
Works
60 days
NCTPS - I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,100
Yes
23 Oct 2025
29 Jul 2025
13 Aug 2025
29 Jul 2025
12 Aug 2025
29 Jul 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .