Loading…
Loading…
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
14 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
SR DEN NE
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnoverof V/N or 'V' whichever is less; where V= Advertised value of the tenderin crores of Rupees; N= Number of years prescribed for completion ofwork for which bids have been invited. The average annual contractualturnover shall be calculated as an average of "total contractualpayments" in the previous three financial years, as per the auditedbalance sheet. However, in case balance sheet of the previous year isyet to be prepared/ audited, the audited balance sheet of the fourthprevious year shall be considered for calculating average annualcontractual turnover. In this reference, fourth previous year shall beconsidered only if bidder(s) give their consent in Annexure VIB as"previous year is yet to be prepared/ audited". The tenderers shallsubmit requisite information as per Annexure-VIB, along with copies ofAudited Balance Sheets duly certified by the CharteredAccountant/Certificate from Chartered Accountant duly supported byAudited Balance Sheet. Criteria with explanation & Format are attachedas a link
10. Eligibility Criteria: 10.1 Technical Eligibility Criteria: (a) The tenderermust have successfully completed or substantially completed any one ofthe following categories of work(s) during last 07 (seven) years, endinglast day of month previous to the one in which tender is invited:(i) Threesimilar works each costing not less than the amount equal to 30% ofadvertised value of the tender, or (ii) Two similar works each costing notless than the amount equal to 40% of advertised value of the tender, or(iii) One similar work costing not less than the amount equal to 60% ofadvertised value of the tender. (b) (1) In case of tenders for compositeworks (e.g. works involving more than one distinct component, such asCivil Engineering works, S&T works, Electrical works, OHE works etc. andin the case of major bridges - substructure, superstructure etc.),tenderer must have successfully completed or substantially completedany one of the following categories of work(s) during last 07 (seven)years, ending last day of month previous to the one in which tender isinvited:(i) Three similar works each costing not less than the amountequal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% ofadvertised value of each component of tender, or (iii) One similar workeach costing not less than the amount equal to 60% of advertised valueof each component of tender. Note for b(1): Separate completed worksof minimum required values shall also be considered for fulfillment oftechnical eligibility criteria for different components. (b)(2)In such cases,what constitutes a component in a composite work shall be clearly predefined with estimated tender cost of it, as part of the tender documentswithout any ambiguity. (b) (3) To evaluate the technical eligibility oftenderer, only components of work as stipulated in tender documents forevaluation of technical eligibility, shall be considered. The scope of workcovered in other remaining components shall be either executed bytenderer himself if he has work experience as mentioned in clause 7 ofthe Standard General Conditions of Contractor through subcontractorfulfilling the requirements as per clause 7 of the Standard GeneralConditions of Contract or jointly i.e., partly himself and remainingthrough subcontractor, with prior approval of Chief Engineer in writing.However, if required in tender documents by way of Special Conditions, aformal agreement duly notarised, legally enforceable in the court of law,shall be executed by the main contractor with the subcontractor for thecomponent(s) of work proposed to be executed by the subcontractor(s),and shall be submitted along with the offer for considering subletting ofthat scope of work towards fulfilment of technical eligibility. Suchsubcontractor must fulfill technical eligibility criteria as follows:Thesubcontractor shall have successfully completed at least one worksimilar to work proposed for subcontract, costing not less than 35%value of work to be subletted, in last 5 years, ending last day of monthprevious to the one in which tender is invited through a works contract.Note: for subletting of work costing up to Rs 50 lakh, no previous workexperience of subcontractor shall be asked for by the Railway.
In case after award of contract or during execution of work it becomesnecessary for contractor to change subcontractor, the same shall bedone with subcontractor(s) fulfilling the requirements as per clause 7 ofthe Standard General Conditions of Contract, with prior approval of ChiefEngineer in writing. Note for Item 10.1: Work experience certificate fromprivate individual shall not be considered. However, in addition to workexperience certificates issued by any Govt. Organisation, workexperience certificate issued by Public listed company having averageannual turnover of Rs 500 crore and above in last 3 financial yearsexcluding the current financial year, listed on National Stock Exchange orBombay Stock Exchange, incorporated/registered at least 5 years prior tothe date of closing of tender, shall also be considered provided the workexperience certificate has been issued by a person authorized by thePublic listed company to issue such certificates. In case tenderer submitswork experience certificate issued by public listed company, the tenderershall also submit along with work experience certificate, the relevantcopy of work order, bill of quantities, bill wise details of paymentreceived duly certified by Chartered Accountant, TDS certificates for allpayments received and copy of final/last bill paid by company in supportof above work experience certificate.
Defination of Similar Work :- Any type of civil work viz. building andstructure work, pipelines, underground and overhead tanks, foundationtreatment works in any Railway embankment/cutting, any earthwork,cover over platform, bore wells, level crossing works including liftingbarriers, cement concrete apron works, etc.
16 conditions · 4 needing a document upload
In terms of Rly Board's letter No 2313/CE-I/CT/O/10/PVC/Pt-1 dtd27.01.2015 the Price Variation Clause of GCC shall not apply forthis tender.
As per official Gazette Notification from "The Institute ofChartered Accountants of India( ICAI) (Set up by an Act ofParliament) dated 02/08/2019,Unique Document IdentificationNumber (UDIN) has been made mandatory from 1st July, 2019for all Audit/Assurance/Attest function.(Official GazetteNotification attached below).'ICAI has conceptualised andimplemented an innovative concept called Unique DocumentIdentification Number (UDIN). ICAI at its 379th Council Meetingheld on 17th - 18th December, 2018 made generation of UDINmandatory for every signature of Full time Practising CharteredAccountants in phased manner for the following services: 1) AllCertificates with effect from 1st February, 2019 2) GST andIncome Tax Audit with effect from 1st April, 2019 3) All Auditand Assurance Functions with effect from 1st July, 2019Therefore, UDIN is being made mandatory for all Audit andAssurance Functions like Documents and Reports certified /issued by full time Practising Chartered Accountants from 1stJuly, 2019'.Any document verified by CA but not having UDINNo. (Wherever applicable) shall not be considered.
Please enter the percentage of local content in the materialbeing offered. Please enter 0 for fully imported items, and 100for fully indigenous items. The definition and calculation of localcontent shall be in accordance with the Make in India policy asincorporated in the tender conditions.
The work shall be maintained after completion for a period of06[Six]Months or one monsoon whichever is later by thecontractor and he shall make good any defects, imperfectionshrinkages or faults which may appear at his own cost.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Any firm recognized by Department of Industrial Policy andPromotion (DIPP) as 'Startups' shall be only exempted frompayment of Bid Security. Labor Cooperative Societies shallsubmit only 50% of above Bid Security.
Tenderers are abiding by the General Conditions of Contract(GCC) April-2022 & any statutory modification thereof and alsoabide to carry out the work accordingly.
Tenderers are requested to visit the web sitehttps//www.ireps.gov.in frequently till the closing date and timefor any update.
Tenderer should have to upload only exact & specific, clear andreadable documents, irrelevant documents should not beuploaded, and documents uploaded once should not berepeated
1). Annual Sectional Contract for Zone "G" under ADEN/DD Sub - Division for DD- AKR , DD-ANG section (DD, DDCC, KSHT, SGND, BWD, VPR,RNJD, SRL, AKR stations - 09 nos.) for the period of one year. 2). Annual Sectional Contract for Zone "H" under Annual Sectional Contract for Zone "A" under ADEN / ANG Sub - Division for ANG - MMR section(ANG, NNB, VL, VBR, RRI, PDGN, BAP, CIT, PB, KNGN, KPG, YL, ANK, SNSI stations - 14 nos.)for the period of one year. 3). Annual Sectional Contract for Zone "I" under ADEN / Beed Sub - Division for ANG - Beed section (NYDO, NLNI, SPWI, NDNR, KDAA, NAHT, WTWI, HTLA, AMNE, JTNU, VNWI, RMOA, RJIN, BEED, Ghatsawali, Mauj, Wadawani stations - 17 nos.) for the period of one year.
DRM-W-PA-E-TND-2026-NE-17~CR
DRM-W-PA-E-TND-2026-NE-17
Open
Works - General
9 Months
Pune, Maharashtra
₹0
₹10.6 L
19 Sept 2026
19 Sept 2026
30 Sept 2026
13 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | Above/ 23795956.52 Below/P | ||
| — | Sum | — | — | ||
| — | — | — | 1,42,77,573.91 | ||
| through different painting of item Zone G under ADEN VPR,RNJD, SRL, AKR | :- All works distempering and of Chapter no.13 for KSHT, SGND, BWD, | Chapter of DSR-2023 no. 13.37 to 13.69, / DD Sub -Division for stations - 09 nos.) | White washing, colour 13.80 to 13.85, 13.87 DD-ANG section (DD, period of one year. | ||
| — | Sum | — | — | ||
| — | — | — | 95,18,382.61 | ||
| colour washing, 13.87 to 13.116 of DD-ANG section period of one year.i.e | :- White washing, 13.71,13.80 to13.85, -Division for DD-AKR, - 09 nos.) for the | distempering and Chapter no. 13 of DSR (DD, DDCC, KSHT, 2026-2027 | of item no. 13.37 Zone G under ADEN VPR,RNJD, SRL, AKR |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GeneralConditionsofContract.GCC.pdf
ATTACHMENT
Annexure-I.TenderForm.pdf
ATTACHMENT
SplconditionZone_11.pdf
ATTACHMENT
ZonenoPVC1zone3.pdf
ATTACHMENT
PCEcir208Zone1.pdf
ATTACHMENT
PCEcircular2071.pdf
ATTACHMENT
AnnexureVIB2025zone2.pdf
ATTACHMENT
ACS-1to11updated.pdf
ATTACHMENT
ACS 12
ATTACHMENT
GCCACS-123389822Dated12.08.2026_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .