Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC PLOT NO 39 HIGH STREET VGN TRINITY GARDEN TAMBARAM WEST CHENNAI 600 045 | CHENNAI | CHENNAI | TAMIL NADU | 600045 | ₹13.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.9 LRejected-Finance | ₹16.9 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 4 | Rejected-Technical NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | Phoenix Engineering L1 | MK DHANALAKSHMI INFRASTRUCTURE PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation soil and depositing on bank with initial lead of 10m 100m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 120.4 | M3 | 150 ₹18,060 | 150 ₹18,060 |
| 2.00 | Providing sand filling in foundation with river sand including cost of sand, filling charges, watering and consolidation etc complete. including cost of labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site. | 9.92 | M3 | 100 ₹992 | 150 ₹1,488 |
| 3.00 | Providing foundation concrete in PCC 1:3:6, using 20 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete.As department enigineer at site | 13.88 | M3 | 4,000 ₹55,520 | 5,000 ₹69,400 |
| 4.00 | Providing and laying R:C:C 1:11/2:3 using 12-20mm HBG metal with out form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 15.9 | M3 | 5,000 ₹79,500 | 5,000 ₹79,500 |
| 5.00 | Providing and laying R:C:C 1:11/2:3 using 12-20mm HBG metal with form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 12 | M3 | 5,000 ₹60,000 | 5,000 ₹60,000 |
| 6.00 | Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 42.32 | M3 | 5,000 ₹2.1 L | 5,000 ₹2.1 L |
| 7.00 | Providing and laying P.C.C 1:2:4 using 12-20mm HBG stone with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 27.82 | M3 | 8,000 ₹2.2 L | 5,000 ₹1.4 L |
| 8.00 | Brick work in C M 1:5 using good quality secound class chamber burnt bricks for basement & Ground floor including cost of all materials labour, lead & lift etc., complete as directed by the department at site. | 2.2 | M3 | 10,000 ₹22,000 | 400 ₹880 |
| 9.00 | Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site . | 263.85 | M2 | 350 ₹92,347.50 | 500 ₹1.3 L |
| 10.00 | Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site. | 1.95 | MT | 40,000 ₹78,120 | 70,000 ₹1.4 L |
Tender Value
₹20.4 L
EMD Value
₹20,400
Closing Date
30 Jan 2026, 2:00 pmClosed
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2026_EB_646625_1
OT-038/25-26 of SE/GCC-I/CNI
Open Tender
Civil Works
120 days
Maraimalai Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,400
Yes
4 Mar 2026
23 Jan 2026
31 Jan 2026
23 Jan 2026
30 Jan 2026
23 Jan 2026
Earth work excavation soil and depositing on bank with initial lead of 10m 100m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Providing sand filling in foundation with river sand including cost of sand, filling charges, watering and consolidation etc complete. including cost of labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site.
Providing foundation concrete in PCC 1:3:6, using 20 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete.As department enigineer at site
Providing and laying R:C:C 1:11/2:3 using 12-20mm HBG metal with out form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying R:C:C 1:11/2:3 using 12-20mm HBG metal with form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying P.C.C 1:2:4 using 12-20mm HBG stone with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Brick work in C M 1:5 using good quality secound class chamber burnt bricks for basement & Ground floor including cost of all materials labour, lead & lift etc., complete as directed by the department at site.
Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site .
Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site.
Supplying and filling with well gravel including cost of gravel transport charges, spreading and consolidation of each 300 mm with power roller, leads, lift, labour etc., complete as directed by the department engineer at site.
supplying and filling for foundation and basement with quary dust including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site.
Supplying and Filling with 20 mm metal including cost of all labour, materials, leads, lift,etc., complete and as directed by the department engineer at site.
Supplying, fabrication of MS angles / channel / ISMB including cost of GI angle, flats as per drawing and specification and galvanising placing in position including cost of angle including cost of all materials, transport, labour, lead etc., complete as directed by the department engineer at site.
Colour washing two coats using shell lime over one coat of white washing including cost of all materials, labour, lead lift etc., complete as per standard specification and as directed by the department engineer at site.
Labour charges for assembling of template in correct position and alligenment for various equipment plinth and grouting the foundation bolt including cost of all material transport , labour,lead, lift etc, complete as directed by the dept. Engineer at site. (The templete will be make own arrangement by the contractor)
Supplying and fixing GI bolt and nuts with minimum 100mm long bend and thread of GI nuts and washer including all materials, labour,lead,lift etc., complete as directed by the department engineer at site. 20mm dia
Supplying and fixing GI bolt and nuts with minimum 100mm long bend and thread of GI nuts and washer including all materials, labour,lead,lift etc., complete as directed by the department engineer at site. 25mm dia
Providing Grout holes for equipment structures including cost of all materials , form work , labour, cost of binding wire etc. comlete as directed by the department engineer at site.
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 40mm dia
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 32mm dia
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 25mm dia
Supplying & fixing gunmetal gate value including cost of materials, labour, lead & lift etc., complete as directed by the department engineer at site. 32mm dia
Supplying & fixing gunmetal gate value including cost of materials, labour, lead & lift etc., complete as directed by the department engineer at site. 25mm dia
Labour charges for Refilling with excavated earth other than sand including cost of labour, lead and lift etc., complete as directed by the department engineer at site.
Dismantling of existing RCC concrete plinth by drilling holes and breaking with compressor idrilling machine including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site.
GST for bidders outside TamilNadu (IGST)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
OT038.pdf
Tender Documents • 0.91 MB
BOQ_775087.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid