Loading…
Loading…
Tender Value
₹33.8 L
EMD Value
₹3.4 L
Closing Date
29 Sept 2026, 12:00 pm2d left
sebsrcirclepwdbsr
sebsrcirclepwdbsr
Reconstruction of minor Bridge at Dasara Dabur Tikri Link road Km 2 in District Bulandshahar
2026_CEMRT_1188673_3
8878/96M(3)-BSR Circle/26 Dt. 05.09.2026
Open Tender
Civil Works - Bridges
Lump-sum
90 days
Khurja
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹3.4 L
Yes
22 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Sr No. 2.13 Ref No.202 including all Taxes & excluding GST | 25 | Rmt. | 580 | ₹14,500 |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 including all Taxes & excluding GST | 370 | Cum | 110 | ₹40,700 |
| 3 | Filling in Foundation Trenches as per Drawing & Technical Specification Sr No. 11.2 Ref No.300 & 1200 including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge. including all Taxes & excluding GST | 42 | Cum | 640 | ₹26,880 |
| 4 | Providing concrete for Plain cement concrete (M-10) in open foundation complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 11.4 Ref No.800 & 1200 in leveling coarse including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge. including all Taxes & excluding GST | 16 | Cum | 7,050 | ₹1,12,800 |
| 5 | Providing concrete for Reinforced cement concrete (M-20) in open foundation complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 11.4 Ref No.800 & 1200 including necessary centering and shuttering etc.complete including supply of all material, labour, T&P all taxes,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge including all Taxes & excluding GST | 50 | Cum | 7,580 | ₹3,79,000 |
| 6 | Providing concrete for Reinforced cement concrete (M-20) in sub structure complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 12.5 Ref No.800 including necessary centering and shuttering etc.complete including supply of all material, labour, T&P all taxes,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge including all Taxes & excluding GST | 38 | Cum | 7,980 | ₹3,03,240 |
| 7 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 Sr. No. 13.2 Ref. No. 1000 including all Taxes & excluding GST | 8.9 | MT | 70,950 | ₹6,31,455 |
| 8 | Providing concrete for Reinforced cement concrete (M-20) in super structure complete as per drawing and technical specifications Clauses 802,1205.4&1205.5 Sr. No. 13.1 Ref. No. 800 including necessary centering and shuttering etc.complete including supply of all material, labour, T&P all taxes,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge including all Taxes & excluding GST | 24 | Cum | 8,680 | ₹2,08,320 |
| 9 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 Sr. No. 13.2 Ref. No. 1000 including supply of and all material, labour, T&P all taxes, labour cessetc. as per direction by the Engineer In-charge including all Taxes & excluding GST | 2.4 | MT | 72,430 | ₹1,73,832 |
| 10 | Providing & Fixing of Weep Hole in abutment wall & retaining wall completed as per drawing & specification.including supply of all material, labour, T&P all taxes, labour cess etc. required for proper completion of work as per direction by the Engineer In-charge . including all Taxes & excluding GST | 70 | Nos | 380 | ₹26,600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
T.pdf
Tender Documents • 1.75 MB
BOQ_2239310.xls
BOQ • 1.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .