Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 0 HISAR HISAR HARYANA 125004 UDYAM HR 06 0052049 | HISAR | HARYANA | 125004 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 17B GOBINDA GHOSHAL LANE KOLKATA 700025 | KOLKATA | WEST BENGAL | 700025 | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.8 L
EMD Value
₹5,600
Closing Date
18 Sept 2026, 12:00 pmClosed
EE C BR_VIII
172/5, R.B. AVE KOL-29
RESTORATION OF PAVER BLOCK AND IPS FOOTPATHS NEAR 94/L,102G KANKULIA RD, 39,18B LAKE VIEW RD ETC IN WD 090 DISTURBED BY CESC AND NATURAL WEAR AND TEAR
2026_KMC_1040709_1
KMC/EEC/VIII/090/01/26-27/D
Open Tender
CIVIL WORKS
Percentage
75 days
IN WARD NO 90
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,600
21 Sept 2026
8 Sept 2026
21 Sept 2026
8 Sept 2026
18 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) | 41.31 | M3 | 89.9 | ₹3,713.77 |
| 2 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 40.11 | SQM | 361 | ₹14,479.71 |
| 3 | Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. | 60.16 | SQM | 40 | ₹2,406.4 |
| 4 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 6. Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 140.28 | SQM | 50 | ₹7,014 |
| 5 | 35mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry [email protected] cement per Sqm. Rounding off corners, chequering as required including taking necessary protective measure complete in Gr.floor/footpath. | 240.5 | SQM | 244 | ₹58,682.49 |
| 6 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 173.05 | SQM | 24 | ₹4,153.2 |
| 7 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (b) For Medium Sand | 8.65 | M3 | 1,275.29 | ₹11,031.26 |
| 8 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 12.03 | M3 | 5,498 | ₹66,140.94 |
| 9 | TAKING OUT AND RELAYING OF EXISTING INTERLOCKING PAVER BLOCKS IN FOOT PATH OR PASSAGE ETC. OVER 20-40 MM THICK MEDIUM YELLOW SAND BED WITH TRUE TO LINE, LEVELLING, PROPER COMPACTION WITH VIBRATER ETC. WITH JOINTING WITH KERB/EDGE TO BE MADE WITH CEMENT CONCRETE (1:2:4) ETC. AS PER THE DIRECTION OF THE ENGINEER IN CHARGE. INCLUDING COST OF TAKING OUT AND USING 20% NEW SAND AND ALL MATERIALS, LABOUR ETC. COMPLETE. | 399.01 | SQM | 108 | ₹43,093.08 |
| 10 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 90 | MTR | 8.17 | ₹735.3 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
TF.pdf
Tender Documents • 1.09 MB
BOQ_2555892.xls
BOQ • 0.35 MB
civil_oid_compressed.pdf
Additional Documents • 1.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .