Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.1 L+₹41,093.85 (7.24%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹6.2 L+₹50,310.90 (8.86%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S ANIL CEMENT AGENCY L3 | SANDEEP KUMAR SINGHAL L1 | DEV CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds from Internal and External Portion of Canal Section including all cost of labour, T&P, disposal of uprooted Jhund etc complete in all respect. | 888 | Nos. | 34.5 ₹30,636 | 31.5 ₹27,972 Lowest | 33.95 ₹30,147.6 |
| 2.00 | Scrapping internal section of existing canal i.e bed and slope with silt up to 5cm including all cost of labour, T&P, compaction etc. required for proper completion of work. | 8,744 | Sqm | 4.6 ₹40,222.4 | 4.5 ₹39,348 Lowest | 4.5 ₹39,348 Lowest |
| 3.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 8,825 | Cum | 62 ₹5,47,150 | 56.7 ₹5,00,377.5 Lowest | 61.11 ₹5,39,295.75 |
Tender Value
₹6.3 L
EMD Value
₹12,520
Closing Date
3 Oct 2026, 3:00 pmClosed
Ex. Eng., Meerut Division Ganga Canal, Meerut
Office of the Ex. Eng., Meerut Division Ganga Canal, Meerut
TN 08/EE/2026-27 Silt Clearance Internal Section of Rohta Minor from km. 0.000 to km. 12.315 (Lot-15)
2026_UPIDC_1190485_17
TN 08/EE/2026-27
Open Tender
Civil Works - Canal
Piece-work
15 days
As per Tender Notice
As per Tender Notice
2 documents required · 2 mandatory
₹766
₹12,520
8 Oct 2026
28 Sept 2026
3 Oct 2026
28 Sept 2026
3 Oct 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds from Internal and External Portion of Canal Section including all cost of labour, T&P, disposal of uprooted Jhund etc complete in all respect. | 888 | Nos. | - | - |
| 2 | Scrapping internal section of existing canal i.e bed and slope with silt up to 5cm including all cost of labour, T&P, compaction etc. required for proper completion of work. | 8,744 | Sqm | - | - |
| 3 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 8,825 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.13 MB
Tendernotice_2.pdf
PDF • 0.32 MB
Tendernotice_3.pdf
PDF • 1.01 MB
Tendernotice_4.pdf
PDF • 0.24 MB
BOQ_2244078.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .