Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | -20.99% | ₹2.4 Cr | L1 | Admitted-Finance |
Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
11 Aug 2025, 6:00 pmClosed
SE PWD CIRCLE SIKAR
SE PWD CIRCLE SIKAR
RJ-29-10/NP/DTR/2025-26
2025_CEPWD_477420_10
NIT-03/2025-26 SE PWD CIRCLE SIKAR
Open Tender
Civil Works
Percentage
150 days
SIKAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Through online eGRAS Challan SIKAR
₹6.0 L
Yes
14 Aug 2025
8 Jun 2025
12 Aug 2025
8 Jun 2025
11 Aug 2025
8 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 01. Bharija (Bharija Stand) to Bhurdon ka Bas (Towards Jawahar Nagar) Km 0/0 to 4/0 | - | - | - | - |
| - | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means. In area of non-thorny jungle | 1.16 | Hect | 12,513 | ₹14,515.08 |
| - | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 2,536.88 | Cum | 31 | ₹78,643.28 |
| - | Construction Embankment with Material Obtained from Roadway cutting.
Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | 2,536.88 | Cum | 40 | ₹1,01,475.2 |
| - | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202. By Mechanical Means. Bituminous Courses & Granular Courses | 123 | Sqm | 100 | ₹12,300 |
| - | Granular Sub-Base with Close Graded Material (Table:- 400-1)
Plant Mix Method
Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For Grading-I Material | 977 | Cum | 882 | ₹8,61,714 |
| - | Water Bound Macadam Sub-base/base with Stone Screening
WBM Grading 1
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening & binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per MoRTH Specification Clause 404. Using Crusher Broken aggregate By Machanical Means | 258.94 | Cum | 1,016 | ₹2,63,083.04 |
| - | Water Bound Macadam Sub-base/base with Stone Screening
WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate By Machanical Means. | 1,148.25 | Cum | 1,093 | ₹12,55,037.25 |
| - | Prime Coat
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 15,310 | Sqm | 31 | ₹4,74,610 |
| - | Tack Coat
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 15,310 | Sqm | 11 | ₹1,68,410 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 0.02 MB
BOQ.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .