Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.5 LAccepted-Finance | ₹18.5 L | L1 | Accepted-Finance DUE TO BELOW RATE |
| 2 | L2₹18.7 LRejected-Finance | ₹18.7 L | L2 | Rejected-Finance DUE TO ABOVE RATE |
| 3 | L3₹18.7 LRejected-Finance | ₹18.7 L | L3 | Rejected-Finance DUE TO ABOVE RATE |
Tender Value
₹18.5 L
EMD Value
₹1.9 L
Closing Date
27 Jan 2026, 5:00 pmClosed
EO NPP BIJNOR
O/O EO NPP BIJNOR
Construction of Boring of (300x200mm) Size Tube Well By Rc Rig Machine and Development of the Tube well By Air Compressure and O.P Unit in Ramleela Ground
2026_DOLBU_1104351_6
120/ET-NPPB/2025-26
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
90 days
EO NPP BIJNOR
PLEASE PREFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹854
EO NPP BIJNOR
₹1.9 L
31 Jan 2026
7 Jan 2026
28 Jan 2026
7 Jan 2026
27 Jan 2026
7 Jan 2026
Transportation of Rig Machine
Transportation of T&P by truck
Loading & Unloading of T&P 2 2 Jobs
Toeing of Air Compressor T&P tractor
Transportation of compressor T&P by truck
Loading & Unloading of T&P 1 2 Jobs
Toeing of O.P Unit troll by tractor
Trasportation of O.P. Unit T&P
Loading & unloading of T&P
Return Trip of Above T& P Rin M/C Compressur And O.P Unit
Transportation of Tube well assembly
Loading and unloading of T.W. assembly
300mm dia M.S. ERW Housing pipe of 7.1 thickness as per IS-3589
200mm dia M.S. ERW plan pipe of 7.1 mm thickness IS-3589
300x200 mm dia MS Reducer
200 mm dia M.S. ERW slotted pipe of 7.1 mm thickness as per IS-3589
300mm dia M.Socket/rings
200mm dia M.S. Socket/Rings
200mm dia bail plug
200mm dia center Guide
300mm dia M.S. Housing clamp
300mm dia M.S. Tube well
200x100m dia Tube well foundation R.S. joint 2.5mtr
Erection of R.C. Rig machine and camp equipage
Drilling of 675 mm bore from GL to 50m BGL
Drilling of 600 mm bore from 50M to 90M GBL
Drilling of 600 mm bore from 90M to 120M BGL
Drilling of 600 mm bore from 120M to 150M BGL
Drilling of 600 mm bore from 150M to 180M BGL
Dismantling of Rig Machine and T&P after completion of the work.
Water arrangement for construction of T.W.
Provision of temporary fencing baricating at T.W. site for the protection of children, animal and human being by barbered wire during competion of Tube well.
Logging of bore holeby department/Approved electrci
Lowering of 300 mm dia MS housing pipe from GL to 40 m BGL
Lowering of 200 mm dia MS Blind/Slotted from 40M to 90M BGL
Same as above but from 90M to 120M BGL
Same as above but from 120M to 170M BGL
Supply of 1.6mm to 4.8 mm size pea gravel Lalquan quarry
Erection of compressor unit and cap equipage
Dismantling of above after completion of work
Development of Tube well by 600 PSI Capacity air compressor.
Erection of O.P. unit and camp equipage
Dismantling of above after completion of work
Development of tube well by O.P. Unit
Yield and verticality test of Tube well
Chemical and bacterilogical test of water
Rental charges of Rig Machine air compressor and O.P. Unit
Site clearance after completion of T.W. & cutting welding of well cap after development and earth filling in water pits.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.00 MB
BOQ_2037483.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid