Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance | ₹3.5 L | L1 | Accepted-Finance Low |
| 2 | L2₹3.7 L+₹19,767 (5.60%)Rejected-Finance | ₹3.7 L+₹19,767 (5.60%) | L2 | Rejected-Finance High |
| Sl No | Description | Qty | Unit | Krishnakumar L2 | KKS CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring and strutting and balling out water wherever necessary refilling the sides of foundation with excavated earth in layers of not more complete complying with standard specification | 324 | m3 | 270 ₹87,480 | 263 ₹85,212 Lowest |
| 2.00 | Plain Cement concrete 1:4:8 mix(one cement ,four sand and eight aggregate) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, consolidating and curing etc., complete as per standard specification. | 0.5 | m3 | 5,590 ₹2,795 | 5,586 ₹2,793 Lowest |
| 3.00 | P.C.C. 1:3:6 cement concrete (one cement three sand and six hard broken stone) using 20mm guage hard broken granite stone jelly for flooring including consolidating as per standard specification curing, etc., complete and rendering the top rough to take floor finish. The rate is to include necessary as directed by the departmental officers. | 5 | m3 | 6,300 ₹31,500 | 6,291 ₹31,455 Lowest |
| 4.00 | Re-filling the excavation earth filing including cost and conveyance of all materials to site and all labour charges etc complete as per standard specification. | 321 | m3 | 50 ₹16,050 | 45 ₹14,445 Lowest |
| 5.00 | Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00M in height including cost and conveyance of all materials to site and all labour charges etc complete | 10.5 | m2 | 590 ₹6,195 | 575 ₹6,037.5 Lowest |
| 6.00 | Supply and fabrication of steel for R.C.C work using R.T.S & M.S rod including cost and conveyance of all materials to site all labour charges etc complete as per standard specification. | 40 | Kg | 100 ₹4,000 | 92 ₹3,680 Lowest |
| 7.00 | Reinforced cement concrete 1:1 1/2 :3mix (for M20 grade concrete) using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete. | 0.5 | m3 | 8,200 ₹4,100 | 8,175 ₹4,087.5 Lowest |
| 8.00 | Plastering with cement mortar 1:5 mix (One cement and five sand) to 12mm thick including curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 11 | m2 | 300 ₹3,300 | 290 ₹3,190 Lowest |
| 9.00 | Painting two coats with Emulsion Paint over plastered wall surface including cost and conveyance of all materials to site and all labour charges etc complete. | 11 | m2 | 280 ₹3,080 | 271 ₹2,981 Lowest |
| 10.10 | Supply and fixing of PVC 6ksc& GI"B' class pipe from approved company and including cost and conveyance of materials and all etc complete complying with std specifications 80mm GI 'B' Class pipe | 30 | m | 770 ₹23,100 | 750 ₹22,500 Lowest |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
2 Dec 2025, 3:00 pmClosed
Executive Officer, Madathukulam Town Panchayat
Executive Officer, Madathukulam Town Panchayat
Extension of Pipe line with Syntex tank 2000 litre bed from Sump to KAK Chamber at ward no.13 , Sengalaniputhur, Madathukulam Town Panchayat
2025_DTP_626493_1
536/25
Open Tender
Civil Works
Works
180 days
Madathukulam Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,000
16 May 2026
26 Nov 2025
3 Dec 2025
26 Nov 2025
2 Dec 2025
26 Nov 2025
Earth work excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring and strutting and balling out water wherever necessary refilling the sides of foundation with excavated earth in layers of not more complete complying with standard specification
Plain Cement concrete 1:4:8 mix(one cement ,four sand and eight aggregate) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, consolidating and curing etc., complete as per standard specification.
Re-filling the excavation earth filing including cost and conveyance of all materials to site and all labour charges etc complete as per standard specification.
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00M in height including cost and conveyance of all materials to site and all labour charges etc complete
Reinforced cement concrete 1:1 1/2 :3mix (for M20 grade concrete) using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Supply and fixing of PVC 6ksc& GI"B' class pipe from approved company and including cost and conveyance of materials and all etc complete complying with std specifications 80mm GI 'B' Class pipe
90mm pvc 6ksc pipe
80mm GI 'B' Class pipe
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_749113.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .