Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC VCC FARM HOUSE GALL NO 3 VIKAS NAGAR NEAR UNIQUE GARDEN MURTHAL ROAD SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | ₹1.6 Cr | L1 | Accepted-AOC accept |
| 2 | L2₹1.6 CrRejected-AOC | ₹1.6 Cr | L2 | Rejected-AOC accept |
| 3 | L3₹1.7 CrRejected-AOC | ₹1.7 Cr | L3 | Rejected-AOC accept |
| 4 | L4₹1.9 CrRejected-AOC H NO 192 SECTOR 8 121006 | FARIDABAD | HARYANA | 121006 | ₹1.9 Cr | L4 | Rejected-AOC accept |
| Sl No | Description | Qty | Unit | Ashi Construction Co L4 | V.P YADAV CONTRACTOR L2 | vedprakashcontractor L3 | VIDYA PROJECT PVT. LTD. L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | CREDIT OF OLD BRICK WORK | 16.38 | cum | 540 -₹8,845.20 | 540 -₹8,845.20 | 540 -₹8,845.20 | 540 -₹8,845.20 |
| 2.00 | Supply and carriage of stone from approved cuarry to site of work including all lead ,lifts complete in all respect. | 119.76 | cum | 2,000 ₹2.4 L | 1,200 ₹1.4 L | 2,160 ₹2.6 L | 2,160 ₹2.6 L |
Tender Value
₹2.2 Cr
EMD Value
₹4.5 L
Closing Date
21 Feb 2026, 6:00 pmClosed
MOHIT VASHISHTA
W.S. Divn. Palwal
Construction of out of norms V.R. Bridge on Gaunchi Main Drain at RD 146660 connecting villages Kairaka to Rajolaka.
2026_HRY_502580_1
20266DE44B4E 904B 4596 8713 3EA3A8967946164IRR
Open Tender
Civil Works
180 days
RAJOULKA KAIRAKA
3 documents required · 3 mandatory
₹15,000
₹4.5 L
Yes
Palwal W.S. Division, Palwal
8 Apr 2026
14 Feb 2026
23 Feb 2026
14 Feb 2026
21 Feb 2026
14 Feb 2026
18 Feb 2026
CREDIT OF OLD BRICK WORK
Supply and carriage of stone from approved cuarry to site of work including all lead ,lifts complete in all respect.
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[15.1.2.2]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 2.2. Mechanical Means Depth 3 m to 6 m [Through Rate]
[16.27]Filling cement bags with sand, sewing and laying in position within 30 metres in water including cost of strings by mechanical/ mannual means. [Through Rate]
[16.44.1]Filling stone or spalls by mechanical/ mannual means.- 1. on level [Through Rate]
[2.B0976] B0976. Empty Cement bags [Rate]
[27.1]Brick masonry work in 1:3 in sub-structure including scaffolding complete excluding pointing and plastering, as per drawing and MoRTandH Specifications 1300 and 2200 [Through Rate]
[27.10.1.1]RCC Grade M25 1.1. Height up to 5m Using concrete Mixer [Through Rate]
[27.10.2.1]RCC Grade M25 2.1. Height 5m to 10m Using concrete Mixer [Through Rate]
[27.15]Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing force. Complete as per drawing and MoRTandH Specifications 2706 & 2200. [Through Rate]
[27.16.2]Back filling behind abutment, wing wall and return wall complete as per drawing and MoRTandH Specification 710.1.4 of IRC: 78 and 2200. 2. Sandy material [Through Rate]
[27.44.2]Drainage Spouts complete as per drawing no. SD/205 and MoRTandH MoRTandH specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges) 2. For fixing in position [Through Rate]
[27.5]Plain/Re-inforced cement concrete in sub-structure complete as per drawing and MoRTandH specifications 1500,1700 and 2200. PCC Grade M15 (with concrete Mixer) Height up to 5m [Through Rate]
[27.51.3]Filler joint 3. Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement up to 20 mm, covered with sealant complete as per drawing and MoRT&H specifications. [Through Rate]
[34.49]Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces [Through Rate]
[34.8.1]Informatory sign board 800x600 rectangular as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 fixed over 4 mm thick aluminium Composite material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 without cost of definition plate firmly fixed to ground in foundation concrete M-25 of size 0.45x0.45x0.75m for vertical post complete as per clause 801 of MORTandH specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting and a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67-2012 1. Using retro reflective Sheeting Class C as per IRC 67 2012 [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_581256.pdf
techsummary_581256.pdf
BOQ Comparative Chart
xlsx
finsummary_581256.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_581256.xls
BOQ • 0.35 MB
AD0150937.pdf
Additional Documents • 0.66 MB
Download all tender documents and submit your bid