Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹6.4 L+₹58,608.42 (10.1%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹7.6 L
EMD Value
₹15,260
Closing Date
9 Sept 2026, 4:00 pmClosed
EXEN CRD SMC
EXEN CRD SMC
Construction of Truss for Community Kitchen near Imam Bara Hakeem Mohalla Bhagwanpora Lal Bazar.
2026_HAUDD_323454_1
ENIT/65/CRD/SMC/DT.03-09-2026
Open Tender
Civil Works
Percentage
25 days
CITY ROADS SMC
REFER TENDER DOCS
2 documents required · 2 mandatory
₹300
MUNICIPAL ACCOUNT
₹15,260
24 Sept 2026
4 Sept 2026
10 Sept 2026
4 Sept 2026
9 Sept 2026
4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 20 | No. | 20 | ₹400 |
| 2Dismantling of wood work in frames, trusses, purlins, rafters and CGI roofing upto 10 mtrrs. Span and 50 mtrs. Height including stacking of the serviceable material within 50mtrs. Lead by manual means complete. | |||||
| 2.1 | Carpenter. | 4 | No. | 1,030 | ₹4,120 |
| 2.3 | Labour. | 8 | No. | 730 | ₹5,840 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated material and carriage and disposal of surplus excavated material as directed beyond SMC limits by mechanical transport including all its costs and carriages complete. | 1.35 | Cum | 479.3 | ₹647.06 |
| 4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 40 mm nominal size) complete. | |||||
| 4.1 | Pedestal for coloumn. | 1.35 | Cum | 6,591.25 | ₹8,898.19 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:4 ( 1 cement : 4 coarse sand) rasing of Existing brick pillars etc. complete. | 1.8 | Cum | 7,877.4 | ₹14,179.32 |
| 6 | Extra for brick work in square or rectangular pillars. | 1.8 | Cum | 756.1 | ₹1,360.98 |
| 7 | Steel work in built up tabular (round, square or rectangular hollow tubes etc.) trusses etc. including, cutting, hoisting, fixing in position and applying readymix primer two or more coats of approved steel primer, including welding and bolted with special shaped washers complete in all respects with all leads, lifts, loading, unloading, head load (if any) costs and carriages complete. | 4,554 | Kgs | 138.2 | ₹6,29,362.8 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_1088506.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .