Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.5 LAccepted-AOC KOLUTHUOPALAYAM NAMAKKAL | NAMAKKAL | NAMAKKAL | TAMIL NADU | ₹17.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹18.8 LRejected-AOC | ₹18.8 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | DURAI CONTRACTOR L1 | Kailasam L2 |
|---|---|---|---|---|---|
| 1.00Strengthening to the Road from VV Road to Nadeshan Thottam KM 0/0 -0/550 [R432/VPR] H/O Akkalampatty | |||||
| 2.00 | Clearing Scrub Jungles and removing them by burrying or burning etc., completed as per Sl. No.2 | 528 | Sqm | 6 ₹3,168 | 7 ₹3,696 |
| 3.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 165 | Cum | 140.45 ₹23,174.25 | 140.45 ₹23,174.25 |
| 4.00 | Collection and Supply of Gritty Gravel with an Average Lead of 1K.M including Cost and conveyance and stacking Charges and Spreading with Power Roller including Compaction etc., complete. | 107.25 | Cum | 341.13 ₹36,586.19 | 341.13 ₹36,586.19 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 255.01 | Cum | 2,417.65 ₹6.2 L | 2,800 ₹7.1 L |
| 6.00 | Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 1,700 | Sqm | 86.31 ₹1.5 L | 86.31 ₹1.5 L |
| 7.00 | Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,700 | Sqm | 20.13 ₹34,221 | 20.13 ₹34,221 |
| 8.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 450 | Sqm | 34.22 ₹15,399 | 50 ₹22,500 |
| 9.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 53.75 | Cum | 11,297.04 ₹6.1 L | 11,297.04 ₹6.1 L |
| 10.00 | Supply and Fixing of H.M Stones etc., | 2 | Nos | 574.65 ₹1,149.30 | 574.65 ₹1,149.30 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹17,750
Closing Date
31 Dec 2025, 4:00 pmClosed
BDO Office, Elachipalayam
BDO BP
Strengthening to the Road from VV Road to Nadeshan Thottam at Akkalampatty in Elachipalayam Block of Namakkal District
2025_RDTN_636069_1
3228/2025/A2 18122025
Open Tender
Civil Works
180 days
Akkalampatti
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,750
Yes
29 Jan 2026
24 Dec 2025
31 Dec 2025
24 Dec 2025
31 Dec 2025
25 Dec 2025
Clearing Scrub Jungles and removing them by burrying or burning etc., completed as per Sl. No.2
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Collection and Supply of Gritty Gravel with an Average Lead of 1K.M including Cost and conveyance and stacking Charges and Spreading with Power Roller including Compaction etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Tack coat over primed WMM surface using 2.5 Kg of bituminous binder for 10 Sq.m. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supply and Fixing of H.M Stones etc.,
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_761193.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Schedule_road.pdf
Tender Documents • 1.22 MB
BOQ_761193.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid