| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 LAccepted-Finance | ₹28.4 L | L1 | Accepted-Finance Rates of Bidder are below estimated rates and also 1st lowest among two. |
| 2 | L2₹31.1 LRejected-Finance | ₹31.1 L | L2 | Rejected-Finance Rates of Bidder are Higher estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | AKHILESH KUMAR GANGWAR L2 | M/S SUDHIR CHANDRA CONSTRUCTION AND SUPPLIER L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry soil including lift up to 1.5m. &lead up to 30m.back filling, watering & ramming of excavated earth in to the trenches &disposal of surplus earth as direction by the engineer-in-charge. | 371.63 | M3 | 150 ₹55,744.80 | 100 ₹37,163.20 |
| 2.00 | Providing and Laying C.C. M-15(1:2:4mix) with cement, coarse sand &10mm. to 20mm.Size stone grit.including cost of all material,labour,T&P complete. | 32.3 | M3 | 6,607 ₹2.1 L | 5,500 ₹1.8 L |
| 3.00 | Providing and Laying R.C.C. M-20(1:1.5:3 mix) with cement, coarse sand &10mm. to 20mm.Size stone grit.including cost of all material,labour,T&P complete. | 125.62 | M3 | 6,613 ₹8.3 L | 6,200 ₹7.8 L |
| 4.00 | Providing and Laying R.C.C. M-25 (1:1:2mix) with cement,coarse sand and 10mm. to20mm.size stone grit.including cost of all material,labour and T&P complete. | 75.44 | M3 | 7,790 ₹5.9 L | 7,200 ₹5.4 L |
| 5.00 | Providing M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 31.95 | M3 | 7,450 ₹2.4 L | 4,800 ₹1.5 L |
| 6.00 | Providing steel reinforcement with straightening, Cutting, Bending, Binding and Placing etc with cost of steel and binding wire e.t.c complete Including cost of all material, labour, T & P complete required for proper completion of work. | 8.8 | MT. | 69,150 ₹6.1 L | 71,000 ₹6.2 L |
| 7.00 | Centering and Shuttering in Special type such as Curves, Beams, Bridges and syphons e.t.c. including all material, labour, T & P complete required for proper completion of work. | 308.93 | M2 | 922 ₹2.8 L | 800 ₹2.5 L |
| 8.00 | Providing Ordinary Centering and Shuttering of Plywood or steel For RCC work including all material, labour, T & P complete required for proper completion of work. | 46.85 | M2 | 650 ₹30,450.55 | 650 ₹30,450.55 |
| 9.00 | Providing and fixing of sattelment joint 600 mm wide including Angle 75x75x10, coir soaked in bitumen, 200x200 recess for accomadation the vertical seal & feats for fixing Angle at suitable spacing vertical copper / stainless steel water stop including cost of all material ,labour ,T&P ,all lifts and leads etc complete. | 11.11 | R.M | 822 ₹9,134.06 | 14,500 ₹1.6 L |
| 10.00 | S/Fixing Marble B.M. Plate of Size 150 x 150 x 25 mm including cost of all labour and T&P etc. Complete. | 1 | NOS | 570 ₹570 | 580 ₹580 |
Tender Value
₹31.1 L
EMD Value
₹62,240
Closing Date
27 Apr 2026, 11:00 amClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTIVE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION 9 SAMBHAL
CONSTRUCTION OF D.R.B CUM CANAL SYPHON AT KM 8.350 OF KAILY DY.
2026_UPIDC_1138601_1
01/EE/2026-27
Open Tender
Civil Works - Canal
60 days
KAILY SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹674
Yes
₹62,240
SAMBHAL
14 May 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry soil including lift up to 1.5m. &lead up to 30m.back filling, watering & ramming of excavated earth in to the trenches &disposal of surplus earth as direction by the engineer-in-charge. | 0.8 | M3 | - | - |
| 2 | Providing and Laying C.C. M-15(1:2:4mix) with cement, coarse sand &10mm. to 20mm.Size stone grit.including cost of all material,labour,T&P complete. | - | M3 | - | - |
| 3 | Providing and Laying R.C.C. M-20(1:1.5:3 mix) with cement, coarse sand &10mm. to 20mm.Size stone grit.including cost of all material,labour,T&P complete. | 0.6 | M3 | - | - |
| 4 | Providing and Laying R.C.C. M-25 (1:1:2mix) with cement,coarse sand and 10mm. to20mm.size stone grit.including cost of all material,labour and T&P complete. | 0.2 | M3 | - | - |
| 5 | Providing M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 0.8 | M3 | - | - |
| 6 | Providing steel reinforcement with straightening, Cutting, Bending, Binding and Placing etc with cost of steel and binding wire e.t.c complete Including cost of all material, labour, T & P complete required for proper completion of work. | - | MT. | - | - |
| 7 | Centering and Shuttering in Special type such as Curves, Beams, Bridges and syphons e.t.c. including all material, labour, T & P complete required for proper completion of work. | 0.06 | M2 | - | - |
| 8 | Providing Ordinary Centering and Shuttering of Plywood or steel For RCC work including all material, labour, T & P complete required for proper completion of work. | - | M2 | - | - |
| 9 | Providing and fixing of sattelment joint 600 mm wide including Angle 75x75x10, coir soaked in bitumen, 200x200 recess for accomadation the vertical seal & feats for fixing Angle at suitable spacing vertical copper / stainless steel water stop including cost of all material ,labour ,T&P ,all lifts and leads etc complete. | - | R.M | - | - |
| 10 | S/Fixing Marble B.M. Plate of Size 150 x 150 x 25 mm including cost of all labour and T&P etc. Complete. | - | NOS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.81 MB
Tendernotice_2.pdf
PDF • 3.62 MB
BOQ_2125868.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid