| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 CrAccepted-AOC NO 12 RAMVILAS NAGAR NGO B COLONY TIRUNELVELI 627 007 | TIRUNELVELI | TAMIL NADU | 627007 | ₹19.8 Cr Quoted ₹20.5 Cr | L1 | Accepted-AOC lowest quoted bidder |
| 2 | L2₹21.7 CrRejected-Finance | ₹21.7 Cr | L2 | Rejected-Finance Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical 49 B 139 B TIRUNELVELI BYPASS ROAD SALAI PUDUR KAYATHAR THOOTHUKUDI | TIRUNELVELI | TAMIL NADU | 627001 | - | - | Not Admitted-Fee/PreQual/Technical Others-Worksite Inspection Certificate from the Concerned Divisional Engineer (H) is not uploaded by the contractor. |
| Sl No | Description | Qty | Unit | M/s. Sindu Muruga Constructions Pvt. Ltd., L1 | RR INFRAA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| .10Bridge | |||||
| 1.00 | Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring , strutting, walling and forming protective bunds whichever necessary etc., complete as per relevant standard specifation for DRESSING THE BED UPTO SILL LEVEL. | 15,897.6 | Cum | 400 ₹63.6 L | 500 ₹79.5 L |
| 2.00 | Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank, with all leads and lifts as per SS20B , Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring ,bracing,and their subsequent removal,removal of all logs,stumps and other deleterious matter and obstructions,trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation, for FOUNDATION OF ABUTMENTS & PIERS as per section 300 of MORT&H Specifications (V Revision) (including 600mm from the space of foundation for extra working space as per IS:1200 (Part 1) - 1992 Cl.4.2.5.1). | 49.97 | Cum | 800 ₹39,977.60 | 900 ₹44,974.80 |
| 3.00 | Earth work excavation in rock not requiring blasting (Soft Disintegrated Rock/Soft Rock) and depositing on bank, with all leads and lifts, Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing,and their subsequent removal, removal of all logs,stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION OF ABUTMENTS & PIERS as per Section 300 of MoRT&H Specifications (Fifth Revision) (including 600mm from the space of foundation for extra working space as per IS:1200 (Part 1) - 1992 Cl.4.2.5.1). | 2,242.68 | Cum | 800 ₹17.9 L | 900 ₹20.2 L |
| 4.00 | Compacted Plain Cement Concrete of grade M15 (Nominal mix) using 20mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site including potable water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidential charges such as bailing out water, maintaining protective bunds, cofferdams, shoring, structting etc., complete as per relevant stanadard specification, for LEVELLING COURSE BELOW FOOTINGS OF ABUTMENTS & PIERS as per sections 2100 of MoRT&H Specifications (Fifth Revision). | 65.45 | Cum | 6,500 ₹4.3 L | 7,000 ₹4.6 L |
| 5.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant stanadard specification, for FOOTING UNDER ABUTMENTS AND RETURN WALLS as per section 1500, 1700 & 2100 of MoRT&H Specifications (Fifth Revision). | 325.19 | Cum | 11,000 ₹35.8 L | 12,000 ₹39.0 L |
| 6.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant stanadard specification, for FOOTING UNDER PIER as per section 1500, 1700 & 2100 of MoRT&H Specifications (Fifth Revision). | 495.52 | Cum | 10,800 ₹53.5 L | 11,000 ₹54.5 L |
| 7.00 | Vibrated Reinforced Cement Concrete of grade M15 (Nominal mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, etc., complete as per relevant standard specification for FILLING THE TRENCHES AROUND FOOTINGS as per Section 2100 of MoRT&(H) Specifications (Fifth Revision). | 174.08 | Cum | 6,500 ₹11.3 L | 7,000 ₹12.2 L |
| 8.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for ABUTMENT AND RETURN WALL SUB STRUCTURE - BELOW GROUND LEVEL as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision). | 30.8 | Cum | 10,800 ₹3.3 L | 11,000 ₹3.4 L |
| 9.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for ABUTMENT AND RETURN WALL SUB STRUCTURE - ABOVE GROUND LEVEL as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision). | 253.09 | Cum | 11,250 ₹28.5 L | 12,000 ₹30.4 L |
Tender Value
₹19.8 Cr
EMD Value
₹10.1 L
Closing Date
7 Feb 2026, 11:00 amClosed
SE HNRR TIRUNELVELI
Office of the SE H, NRR, AR line Road, Tirunelveli-2
Construction of High Level Bridge at km 15/2 of Udaiyarpatti - Seevalaperi Road in lieu of existing causeway
2026_HWAY_645752_1
TN.No.26_25_26_Seevalaperi
Open Tender
Civil Works - Bridges
730 days
Tirunelveli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10.1 L
Yes
25 Feb 2026
22 Jan 2026
7 Feb 2026
22 Jan 2026
7 Feb 2026
22 Jan 2026
Bridge
Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring , strutting, walling and forming protective bunds whichever necessary etc., complete as per relevant standard specifation for DRESSING THE BED UPTO SILL LEVEL.
Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank, with all leads and lifts as per SS20B , Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring ,bracing,and their subsequent removal,removal of all logs,stumps and other deleterious matter and obstructions,trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation, for FOUNDATION OF ABUTMENTS & PIERS as per section 300 of MORT&H Specifications (V Revision) (including 600mm from the space of foundation for extra working space as per IS:1200 (Part 1) - 1992 Cl.4.2.5.1).
Earth work excavation in rock not requiring blasting (Soft Disintegrated Rock/Soft Rock) and depositing on bank, with all leads and lifts, Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing,and their subsequent removal, removal of all logs,stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION OF ABUTMENTS & PIERS as per Section 300 of MoRT&H Specifications (Fifth Revision) (including 600mm from the space of foundation for extra working space as per IS:1200 (Part 1) - 1992 Cl.4.2.5.1).
Compacted Plain Cement Concrete of grade M15 (Nominal mix) using 20mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site including potable water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidential charges such as bailing out water, maintaining protective bunds, cofferdams, shoring, structting etc., complete as per relevant stanadard specification, for LEVELLING COURSE BELOW FOOTINGS OF ABUTMENTS & PIERS as per sections 2100 of MoRT&H Specifications (Fifth Revision).
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant stanadard specification, for FOOTING UNDER ABUTMENTS AND RETURN WALLS as per section 1500, 1700 & 2100 of MoRT&H Specifications (Fifth Revision).
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant stanadard specification, for FOOTING UNDER PIER as per section 1500, 1700 & 2100 of MoRT&H Specifications (Fifth Revision).
Vibrated Reinforced Cement Concrete of grade M15 (Nominal mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, etc., complete as per relevant standard specification for FILLING THE TRENCHES AROUND FOOTINGS as per Section 2100 of MoRT&(H) Specifications (Fifth Revision).
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for ABUTMENT AND RETURN WALL SUB STRUCTURE - BELOW GROUND LEVEL as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision).
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for ABUTMENT AND RETURN WALL SUB STRUCTURE - ABOVE GROUND LEVEL as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision).
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for BED BLOCK CUM DIRT WALL OVER ABUTMENTS AND PEDASTAL OVER ABUTMENTS as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision).
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for SINGLE COLOUMN PIER - 1800 mm dia - BELOW GROUND LEVEL as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision).
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for SINGLE COLOUMN PIER - 1800 mm dia - ABOVE GROUND LEVEL as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision).
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for CAPPING BEAM OVER PIER AND PEDASTAL OVER PIER as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision).
Supply and fixing of elastomeric bearing of size 40 x 30 x 6.4 cm including cost and conveyance to work site, labour for fixing the bearing in position and all other incidental charges etc., complete sa per section 2000 of MORT&H Specifications (Revision V) and IRC 83-2018 (Part - II)
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants, including all other incidental charges, etc., complete for T-BEAMS and CROSS BEAMS as per section 1500,1700 & 2300 of MORT&H specification (V Revision).
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants, including all other incidental charges, etc., complete for DECK SLAB, FOOTPATH & KERB as per cl 1500,1700 & 2300 of MORT&H specification (V Revision).
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tools and plants, including all other incidental charges, etc., complete for HANDRAILS & POSTS as per sections 2700-3 of MORT&H specification (V Revision).
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20mm ISS HBG metal as the max. size of coarse aggregate, as including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hirecharge for tools and Plants, including all other incidental charges, etc., complete, for INNER CRASH BARRIER AT EDGE OF FOOTPATH as per section 811, 1700 & 2703.3 of MORT&H specification (V Revision).
Providing and fixing of G.I. Drainage spouts 100mm dia as per GOTN Standard drawing No.2LDF/Misc(Vol.-IV) with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised Iron pipes and flats and fixing them in position, etc.,.complete as per cl 2705 of MORT&H specification (V Revision).
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20mm ISS HBG metal as the max. size of coarse aggregate, as including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hirecharge for tools and Plants, including all other incidental charges, etc., complete, for CRASH BARRIER OVER RETURN WALLS as per section 811, 1700 & 2703.3 of MORT&H specification (V Revision).
Supplying and installation of STRIP SEAL EXPANSION joint system conforming to specifications for Road and Bridge Works published by Ministry of Road Transport and Highways in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly , including cost and conveyance of all materials , cost of testing as per the MOST specifications, including labour ,equipment and incidental charges for fixing the joints complete in all respects, as per section 2600 of MORT&H specification (V Revision)
Compacted Plain Cement Concrete M15 (Nominal mix) using 40mm ISS HBG metal, including cost and conveyance of all materials to site and cost of cement at site,including all lablour charges for mixing Concrete, laying, hire charges for Tools and plants , compacting, curing with all leads for soft water, including all other incidental charges, form work etc., complete, for BASE COURSE BELOW APPROACH SLAB AND FOOTPATH RAMP as per cl 1500, 1700 & 2704 of MORT&H specification (V Revision).)
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20mm ISS HBG metal , including cost and conveyance of all materials to site and cost of cement at site,including all lablour charges for mixing Concrete, laying, hire charges for Tools and plants , compacting, curing with all leads for soft water, including all other incidental charges, form work etc., complete, for FOOTPATH RAMP as per sections 1500, 1700 & 2300 of MORT&H specification (V Revision).
Vibrated Reinforced Cement Concrete M30 (Design mix) using 20mm ISS HBG metal , including cost and conveyance of all materials to site and cost of cement at site,including all lablour charges for mixing Concrete, laying, hire charges for Tools and plants , compacting, curing with all leads for soft water, including all other incidental charges, form work etc., complete, for APPROACH SLAB as per sections 1500, 1700 & 2704 of MORT&H specification (V Revision).
Vibrated Cement Concrete of grade M30 (Design mix) 75mm uniform thick with surface reinforcement conforming to Section 2702.2 of MORTH 5th revision, using ISS HBG graded metal, including cost and conveyance of all materials to work site including cement at site,including all labour charges for mixing concrete, laying, hire charges for Tools and plants, compacting, curing with all leads for potable water, including all other incidental charges formwork, complete for WEARING COAT OVER DECK SLAB AND APPROACH SLAB as per section 2702.2 of MORT&H specification (V Revision)
Providing and Fixing Class 1 PVC seepage pipes of 100 mm dia of required lengths for abutments and wing walls including costs and conveyance of all materials to work site and labour charges for fixing, etc., complete to drain the backfill as per Section 2706 of MoRT&(H) Specifications (Fifth Revision).
Providing FILTER MEDIA behind Abutment and Returnss for 600mm thickness using filter material conforming to clause 309.3.2.B of MORTH well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to worksite including all other incidental charges, etc complete as per Cl.710.1.4 & Appendix 6 of IRC 78- 2014.
Filling behind Abutments and Returns as per Appendix 6 of IRC: 78 -2014 with clean gritty free draining material including cost and draining material having Phi value more than 35° conveyance of material to worksite , laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads for water and all other incidental charges, etc., complete as per cl 710.1.4 & Appendix 6 of IRC 78- 2014.
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete as per sec 1600 of MORT&H specification (V Revision).
Supply and fabrication of Fe-240 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete as per sec 1600 of MORT&H specification (V Revision).
Supply and fixing of High Quality of PVC pipes of 160mm dia.. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths.
Construction of RCC Retaining Wall
Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS.
Vibrated Cement Concrete of Grade M-15, Nominal Mix, 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE BELOW BASE SLAB OF RCC RETAINING WALLS.
Vibrated Reinforced Cement Concrete of grade M25 Design Mix using 20mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for BASE SLAB AND BELOW SILL LEVEL OF RCC RETAINING WALL.
Vibrated Reinforced Cement Concrete of grade M25 Design Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RCC RETAINING WALL - ABOVE SILL LEVEL.
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill in between the RCC RETAINING WALL.
Vibrated Cement Concrete M15 grade Nominal Mix using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for BROKEN PARAPET.
SUPPLY AND FABRICATION OF Fe-500 STEEL required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete as per section 1009.3 & 1600 of MORT&H Specifications(Rev-V)
Construction of PCC Retaining wall
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation for Founadation of PCC Retaining wall.
VCC M15 grade (Nominal Mix 1:2:4) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for Levelling course of PCC Retaining wall.
Vibrated Cement Concrete M20 grade (Nominal Mix 1:1.5:3) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for Foundation of PCC Retaining wall (Below sill level).
Vibrated Cement Concrete M20 grade (Nominal Mix 1:1.5:3) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for Stem of PCC Retaining wall (Above sill level).
Vibrated Cement Concrete M15 grade (Nominal Mix 1:2:4) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for Broken Parapet.
Providing and fixing Seepage pipes of 100mm dia PVC pipes of required length for Retaining Walls including cost and conveyance of all materials to worksite, cost and labour for 900mm dia. Semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the Backfill in the PCC Retaining Wall
Approach road
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soilcompactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearingup the site and disposal of all surplus materials etc., complete as per standard specification for embankment / sub grade - Approach Road - 95% Compaction.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soilcompactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearingup the site and disposal of all surplus materials etc., complete as per standard specification for embankment / sub grade - Approach Road - 97% Compaction.
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications as per MORTH Rev. V Clause No. 111, 112, 202,305.4.3 & 501.
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.(gsb III)
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5. (GSB V)
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mixplant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Basecourse onwell prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.
Providing and laying Prime Coat over WBM / WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction overit, including cost of material, labour charges, rentals for machinery, fuel and allother incidental charges etc., complete as per Clause 502 of MORTH Rev-5.
Providing and laying Tack Coat over WBM/WMM surface (treated with primer)using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over itincluding cost of material, labourcharges, rentals formachinery, fuel and all other incidental charges etc., complete asper Clause 503 of MORTH Rev-5.
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing themin the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required densityetc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tippertrucks, PaverFinisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5.
Providing, laying 50 mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50 -13.20 mm, 0.43 cum of 13.20 - 2.36 mm and 0.08 cum of 2.36 mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required densityetc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30 tonne CMP with bitumen boiler, tippertrucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5.
Providing and laying Bituminous Concrete to 30/40mm thick using0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler,tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, includingfueland all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Diversion road
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soilcompactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearingup the site and disposal of all surplus materials etc., complete as per standard specification for embankment / sub grade - Diversion Road - 95% Compaction.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soilcompactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearingup the site and disposal of all surplus materials etc., complete as per standard specification for embankment / sub grade - Divsrsion Road - 97% Compaction.
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5. (Grading - V)
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mixplant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Basecourse onwell prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.
Providing and laying Prime Coat over WBM / WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction overit, including cost of material, labour charges, rentals for machinery, fuel and allother incidental charges etc., complete as per Clause 502 of MORTH Rev-5.
Providing and laying Tack Coat over WBM/WMM surface (treated with primer)using 2.50 Kg o fBitumen Emulsion (RS1)per 10 sqm for preparatory to another bituminous construction over itincluding cost of material, labourcharges, rentals formachinery, fuel and all other incidental charges etc., complete asper Clause 503 of MORTH Rev-5.
Providing laying and rolling of Close Graded Premix Carpet of compacted 20 mm thickness using 0.0162 cum of 13.20-11.20 mm, 0.1404 cum of 11.2-5.6 mm, 0.0729 cum of 5.60-2.80 mm, 0.0405 cum of2.80 mm and below (TypeB) graded HBG metal using 19 kg of VG30 bitumen for 10 sqm including premixing at CMP, conveyance by tipper lorry, laying by paver finisher and rolling by Vibratory Roller including cost and conveyance of allmaterials, hire charges of all T&P all labour charges, fuel and and allother incidental charges etc., Complete as per specification using CMP as per clause 508 of MORTH Rev-5.
Supply of NP3 Class RCC Pipe conforming to IS 458 / 2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers and as per standard specifications.
Hoisting and fixing of NP3 Class RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers and as per standard specifications.
Dismantling
Dismantling the PCC in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Dismantling the stone masonry in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Dismantling the RCC in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
Calculation of SubTotal, GST and Total carried out by system automatically
Sub Total Amount for above all items
GST 18% for the above SubTotal Amount
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_774030.xls
BOQ • 0.40 MB
PQ_Udaiyarpatti_Seevalaperi.pdf
Tender Documents • 0.70 MB
PB_Udaiyarpatti_Seevalaperi.pdf
Additional Documents • 0.75 MB
Pertchart_Seevalaperi.pdf
Additional Documents • 1.00 MB
Download all tender documents and submit your bid