| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 CrAccepted-AOC NO 12 RAMVILAS NAGAR NGO B COLONY TIRUNELVELI 627 007 | TIRUNELVELI | TAMIL NADU | 627007 | L1 | Accepted-AOC lowest quoted bidder | |
| 2 | L2₹21.7 Cr+₹1.2 Cr (5.93%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | Not Admitted-Fee/PreQual/Technical 49 B 139 B TIRUNELVELI BYPASS ROAD SALAI PUDUR KAYATHAR THOOTHUKUDI | TIRUNELVELI | TAMIL NADU | 627001 | - | Not Admitted-Fee/PreQual/Technical Others-Worksite Inspection Certificate from the Concerned Divisional Engineer (H) is not uploaded by the contractor. |
| Sl No | Description | Qty | Unit | M/s. Sindu Muruga Constructions Pvt. Ltd., L1 | RR INFRAA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| .10Bridge | |||||
| 1.00 | Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring , strutting, walling and forming protective bunds whichever necessary etc., complete as per relevant standard specifation for DRESSING THE BED UPTO SILL LEVEL. | 15,897.6 | Cum | 400 ₹63,59,040 Lowest | 500 ₹79,48,800 |
| 2.00 | Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank, with all leads and lifts as per SS20B , Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring ,bracing,and their subsequent removal,removal of all logs,stumps and other deleterious matter and obstructions,trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation, for FOUNDATION OF ABUTMENTS & PIERS as per section 300 of MORT&H Specifications (V Revision) (including 600mm from the space of foundation for extra working space as per IS:1200 (Part 1) - 1992 Cl.4.2.5.1). | 49.97 | Cum | 800 ₹39,977.6 Lowest | 900 ₹44,974.8 |
| 3.00 | Earth work excavation in rock not requiring blasting (Soft Disintegrated Rock/Soft Rock) and depositing on bank, with all leads and lifts, Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing,and their subsequent removal, removal of all logs,stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION OF ABUTMENTS & PIERS as per Section 300 of MoRT&H Specifications (Fifth Revision) (including 600mm from the space of foundation for extra working space as per IS:1200 (Part 1) - 1992 Cl.4.2.5.1). | 2,242.68 | Cum | 800 ₹17,94,143.2 Lowest | 900 ₹20,18,411.1 |
| 4.00 | Compacted Plain Cement Concrete of grade M15 (Nominal mix) using 20mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site including potable water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidential charges such as bailing out water, maintaining protective bunds, cofferdams, shoring, structting etc., complete as per relevant stanadard specification, for LEVELLING COURSE BELOW FOOTINGS OF ABUTMENTS & PIERS as per sections 2100 of MoRT&H Specifications (Fifth Revision). | 65.45 | Cum | 6,500 ₹4,25,405.5 Lowest | 7,000 ₹4,58,129 |
| 5.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant stanadard specification, for FOOTING UNDER ABUTMENTS AND RETURN WALLS as per section 1500, 1700 & 2100 of MoRT&H Specifications (Fifth Revision). | 325.19 | Cum | 11,000 ₹35,77,057 Lowest | 12,000 ₹39,02,244 |
| 6.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant stanadard specification, for FOOTING UNDER PIER as per section 1500, 1700 & 2100 of MoRT&H Specifications (Fifth Revision). | 495.52 | Cum | 10,800 ₹53,51,594.4 Lowest | 11,000 ₹54,50,698 |
| 7.00 | Vibrated Reinforced Cement Concrete of grade M15 (Nominal mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, etc., complete as per relevant standard specification for FILLING THE TRENCHES AROUND FOOTINGS as per Section 2100 of MoRT&(H) Specifications (Fifth Revision). | 174.08 | Cum | 6,500 ₹11,31,513.5 Lowest | 7,000 ₹12,18,553 |
| 8.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for ABUTMENT AND RETURN WALL SUB STRUCTURE - BELOW GROUND LEVEL as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision). | 30.8 | Cum | 10,800 ₹3,32,640 Lowest | 11,000 ₹3,38,800 |
| 9.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for ABUTMENT AND RETURN WALL SUB STRUCTURE - ABOVE GROUND LEVEL as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision). | 253.09 | Cum | 11,250 ₹28,47,262.5 Lowest | 12,000 ₹30,37,080 |
Tender Value
₹19.8 Cr
EMD Value
₹10.1 L
Closing Date
7 Feb 2026, 11:00 amClosed
SE HNRR TIRUNELVELI
Office of the SE H, NRR, AR line Road, Tirunelveli-2
Construction of High Level Bridge at km 15/2 of Udaiyarpatti - Seevalaperi Road in lieu of existing causeway
2026_HWAY_645752_1
TN.No.26_25_26_Seevalaperi
Open Tender
Civil Works - Bridges
Item Rate
730 days
Tirunelveli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10.1 L
Yes
25 Feb 2026
22 Jan 2026
7 Feb 2026
22 Jan 2026
7 Feb 2026
22 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Bridge | - | - | - | - |
| 1Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring , strutting, walling and forming protective bunds whichever necessary etc., complete as per relevant standard specifation for DRESSING THE BED UPTO SILL LEVEL. | |||||
| 2Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank, with all leads and lifts as per SS20B , Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring ,bracing,and their subsequent removal,removal of all logs,stumps and other deleterious matter and obstructions,trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation, for FOUNDATION OF ABUTMENTS & PIERS as per section 300 of MORT&H Specifications (V Revision) (including 600mm from the space of foundation for extra working space as per IS:1200 (Part 1) - 1992 Cl.4.2.5.1). | |||||
| 3 | Earth work excavation in rock not requiring blasting (Soft Disintegrated Rock/Soft Rock) and depositing on bank, with all leads and lifts, Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing,and their subsequent removal, removal of all logs,stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION OF ABUTMENTS & PIERS as per Section 300 of MoRT&H Specifications (Fifth Revision) (including 600mm from the space of foundation for extra working space as per IS:1200 (Part 1) - 1992 Cl.4.2.5.1). | 0.6 | Cum | - | - |
| 4 | Compacted Plain Cement Concrete of grade M15 (Nominal mix) using 20mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site including potable water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidential charges such as bailing out water, maintaining protective bunds, cofferdams, shoring, structting etc., complete as per relevant stanadard specification, for LEVELLING COURSE BELOW FOOTINGS OF ABUTMENTS & PIERS as per sections 2100 of MoRT&H Specifications (Fifth Revision). | 0.8 | Cum | - | - |
| 5 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant stanadard specification, for FOOTING UNDER ABUTMENTS AND RETURN WALLS as per section 1500, 1700 & 2100 of MoRT&H Specifications (Fifth Revision). | 0.8 | Cum | - | - |
| 6 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant stanadard specification, for FOOTING UNDER PIER as per section 1500, 1700 & 2100 of MoRT&H Specifications (Fifth Revision). | 0.2 | Cum | - | - |
| 7 | Vibrated Reinforced Cement Concrete of grade M15 (Nominal mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, etc., complete as per relevant standard specification for FILLING THE TRENCHES AROUND FOOTINGS as per Section 2100 of MoRT&(H) Specifications (Fifth Revision). | 0.6 | Cum | - | - |
| 8Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for ABUTMENT AND RETURN WALL SUB STRUCTURE - BELOW GROUND LEVEL as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision). | |||||
| 9Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork,soft water,labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete for ABUTMENT AND RETURN WALL SUB STRUCTURE - ABOVE GROUND LEVEL as per Section 1500, 1700 & 2200 of MoRT&(H) Specifications (Fifth Revision). | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_774030.xls
BOQ • 0.40 MB
PQ_Udaiyarpatti_Seevalaperi.pdf
Tender Documents • 0.70 MB
PB_Udaiyarpatti_Seevalaperi.pdf
Additional Documents • 0.75 MB
Pertchart_Seevalaperi.pdf
Additional Documents • 1.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .