Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.9 LAccepted-AOC | ₹1.9 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹2.0 LRejected-AOC | ₹2.0 L | L-2 | Rejected-AOC L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-All the works costing upto Rs. 1.00 Cr. are reserved for Co-Operative Labour and const. Societies. |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
13 Jan 2026, 11:00 amClosed
Amit Rathi
DIV Bahadurgarh
Repair of damaged manholes, construction of slabs and providing and fixing of SFRC Manhole covers at various locations in Sector- 2, Bahadurgarh and all other works contingent thereto
2026_HBC_495001_1
202608F34988 B4B3 4377 AF1E E8CA432A4C67266HSV
Open Tender
Civil Works
30 days
Bahadurgarh
2 documents required · 2 mandatory
₹250
₹4,000
Yes
9 Feb 2026
6 Jan 2026
13 Jan 2026
6 Jan 2026
13 Jan 2026
6 Jan 2026
11.13.1// Cement Plaster 1:3 (1 cement: 3 coarse sand ) finished with a floating coat of neat cement. 1. 12 mm cement Plaster
11.9.1// 15 mm cement plaster on rough side of single or half brick wall of mix: 1. 1:4 (1 cement: 4 coarse sand)
21.93.2// Providing and fixing SFRC manhole covers and frames marked with IS : 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carrige loading unloading stacking handling rehandling etc. complete in all respect to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy duty set (EHD-20) 560MM clear.
6.14.1// Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finshing, reinforcement- all work up to plinth level: 1. 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III):3.
6.30.3// Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs,landings, balconies and access platform.
6.33.3// Steel reinforcement for R.C.C work, where not included in the complete rate of RCC, including strengthing, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hanger and annealed steel wire etc. compelete in all respect belwo plinth level not: reinforcement shall be measured in length including hooks, if any sperately for different diameters has actually used in work, excluding overlaps. wastage, overlaps, cupplings, welded joints, spacers bars, chairs, stays, hangers and annealed steel wire over other methods of binding & placing shall not be measured and cost of this items shall be deemed to be included in the rates for reinforcement. 3. Cold.
7.21.1// Bricks work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in : 1. Cement mortar 1:4 (1 cement: 4 coarse sand).
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
AD0147451.pdf
Additional Documents • 0.73 MB
BOQ_573461.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid