| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.5 CrAccepted-Technical 39 3A 1 DHARMAPURI MAIN ROAD CHIKKANAMPATTY VILLAGE KADAIYAMPATTY TK SALEM DT 636 309 | SALEM | TAMIL NADU | 636309 | ₹21.5 Cr | L1 | Accepted-Technical Satisfied the prescribed conditions and qualifications |
| 2 | L2₹22.1 CrAccepted-Technical SALEM SALEM TAMIL NADU | ₹22.1 Cr | L2 | Accepted-Technical Satisfied the prescribed conditions and qualifications |
| 3 | L3₹23.0 CrAccepted-Technical 39 1 FIRST CROSS STREET NEDUMARAN NAGAR DHARMAPURI | ₹23.0 Cr | L3 | Accepted-Technical Satisfied the prescribed conditions and qualifications |
| 4 | Accepted-Technical THALAPALLAM PILIYANUR PIKKAMPATTY POST PENNAGARAM TK DHARMAPURI DT | - | - | Accepted-Technical Based on the order of Honourable High Court of Madras for the WMP No. 10394 of 2026 in WP No.7393 of 2026, the petitioner M/s. Arun Construction and Contractors is admitted on condition basis in technical evaluation to view the financial bid. |
Updated dates
Tender Value
₹20.9 Cr
EMD Value
₹10.6 L
Closing Date
12 Feb 2026, 11:00 amClosed
SE H C and M Salem
O/o the Superintending Engineer (Highways), Construction and Maintenance Circle, Salem Steel Plant Main Road, Jagir Ammapalayam, Salem
Widening from Two Lane to Four Lane and Strengthening at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai Road including CD Works (SH-17)
2026_HWAY_645853_1
53 / 2025-2026 / HDO, Dated. 20.01.2026-5
Open Tender
Civil Works - Roads
300 days
Krishnagiri
Refer Tender Document
3 documents required · 3 mandatory
₹0
₹10.6 L
Salem
12 Feb 2026
22 Jan 2026
12 Feb 2026
22 Jan 2026
12 Feb 2026
22 Jan 2026
28 Jan 2026
Picking the existing BT surface upto 50mm thick as directed by the Departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excludung cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc.,complete as per clause 111, 112, 202, 305.4.3 of MORTH - Vth Revision etc.,complete.
1) Widening from Two Lane to Four Lane and Strengthening at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road including CD Works (SH-17)
1.6) Providing Branch road Improvements at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
Earthwork Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all material necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Box cutting portion as per clause 111, 112, 301 to 305, 900 of MORTH Vth Revision
1) Widening from Two Lane to Four Lane and Strengthening at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road including CD Works (SH-17)
1.6) Providing Branch road Improvements at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub-Base (GSB), including premixing the materials with water at Optimum Moisture Content (OMC) in mechanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using paver in Sub-Base course on a well-prepared surface, and compacting with vibratory roller to achieve the desired density, including cost of materials, labour charges, hire and fuel charges for machinery, and all other incidental charges, etc., complete as per Clause 406 of MORTH (Rev-5)- for grading- V Material
1) Widening from Two Lane to Four Lane and Strengthening at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road including CD Works (SH-17)
1.6) Providing Branch road Improvements at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub-Base (GSB), including premixing the materials with water at Optimum Moisture Content (OMC) in mechanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using paver in Sub-Base course on a well-prepared surface, and compacting with vibratory roller to achieve the desired density, including cost of materials, labour charges, hire and fuel charges for machinery, and all other incidental charges, etc., complete as per Clause 406 of MORTH (Rev-5)- for grading- III Material
1) Widening from Two Lane to Four Lane and Strengthening at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road including CD Works (SH-17)
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250 mm thick, including pre-mixing the materials with water at OMC in mechanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/Base course on well-prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Rev-5.
1) Widening from Two Lane to Four Lane and Strengthening at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road including CD Works (SH-17)
1.6) Providing Branch road Improvements at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 502 & 900 of MORTH Rev-5
1) Widening from Two Lane to Four Lane and Strengthening at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road including CD Works (SH-17)
1.6) Providing Branch road Improvements at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per 111, 112, 501, 503 & 900 of MORTH Vth Revision
1) Widening from Two Lane to Four Lane and Strengthening at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road including CD Works (SH-17)
1.6) Providing Branch road Improvements at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
Providing, laying 75 mm consolidated thick Dense Bituminous Macadam using 0.40 cum of 37.50-13.20 mm, 0.35 cum of 13.20-2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG40 grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75 mm with mechanical paver finisher hydrostatic (more than 5 m width) to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH Rev-5. (Grading I)
1) Widening from Two Lane to Four Lane and Strengthening at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road including CD Works (SH-17)
Providing, laying 50 mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20 mm, 0.43 cum of 13.20-2.36 mm and 0.08 cum of 2.36 mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 of Grading II
1.6) Providing Branch road Improvements at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
Providing and laying Bituminous Concrete to 30/40 mm thick using 0.13 cum of 19.00-9.50 mm, 0.17 cum of 9.50-2.36 mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG40 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher hydrostatic (more than 5 m width), Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. (Grading-II)
1) Widening from Two Lane to Four Lane and Strengthening at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road including CD Works (SH-17)
Providing and laying Bituminous Concrete to 30/40 mm thick using 0.13 cum of 19.00-9.50 mm, 0.17 cum of 9.50-2.36 mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. (Grading-II)
1.6) Providing Branch road Improvements at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
Providing compaction of berms using the box cut earth including all hire and fuel charges for power roller for compaction,water sprinkler, including all labour charges for laying spreading, watering etc., complete as directed by the departmental engineers for making up of low berms
1) Widening from Two Lane to Four Lane and Strengthening at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road including CD Works (SH-17)
Dismantling the existing RR Masonry in Cement Mortar in the existing causeway and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.(SOR -PWD-W0015)
1.1) Reconstruction of Box culvert (3.00mx3.00m) at Km 0/8 of Malur - Hosur - Adhiyamankottai road in lieu of existing cut stone slab culvert
Dismantling Exixting RCC and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges.,complete as per clause 202 of MORTH Vth Revision.
1.1) Reconstruction of Box culvert (3.00mx3.00m) at Km 0/8 of Malur - Hosur - Adhiyamankottai road in lieu of existing cut stone slab culvert
Dismantling Plain Cement Concrete and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges.,complete as per clause 202 of MORTH Vth Revision.
1.1) Reconstruction of Box culvert (3.00mx3.00m) at Km 0/8 of Malur - Hosur - Adhiyamankottai road in lieu of existing cut stone slab culvert
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for foundation of culvert and Retaining Wall as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Rev-5.
1.1) Reconstruction of Box culvert (3.00mx3.00m) at Km 0/8 of Malur - Hosur - Adhiyamankottai road in lieu of existing cut stone slab culvert
1.2) Construction of Box culvert (2.00mx2.00m) at Km 1/6 of Malur - Hosur - Adhiyamankottai road
1.3) Construction of Box culvert (2.00mx2.00m) at Km 2/4 of Malur - Hosur - Adhiyamankottai road
1.4) Construction of Box culvert (2.00mx2.00m) at Km 3/4 of Malur - Hosur - Adhiyamankottai road
1.5) Construction of Drain at Km 3/10 of Malur - Hosur - Adhiyamankottai road
Plain Cement Concrete M15 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for foundation of culvert as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Rev-5.
1.1) Reconstruction of Box culvert (3.00mx3.00m) at Km 0/8 of Malur - Hosur - Adhiyamankottai road in lieu of existing cut stone slab culvert
1.2) Construction of Box culvert (2.00mx2.00m) at Km 1/6 of Malur - Hosur - Adhiyamankottai road
1.3) Construction of Box culvert (2.00mx2.00m) at Km 2/4 of Malur - Hosur - Adhiyamankottai road
1.4) Construction of Box culvert (2.00mx2.00m) at Km 3/4 of Malur - Hosur - Adhiyamankottai road
1.5) Construction of Drain at Km 3/10 of Malur - Hosur - Adhiyamankottai road
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and below ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Base Slab, Side Walls, Top Slab, Cover Slab of Box Culvert as per clause 900, 1000, 1500, 1600, 1700, 2100, 2200 & 2300 of MORTH Vth Revision
1.1) Reconstruction of Box culvert (3.00mx3.00m) at Km 0/8 of Malur - Hosur - Adhiyamankottai road in lieu of existing cut stone slab culvert
1.2) Construction of Box culvert (2.00mx2.00m) at Km 1/6 of Malur - Hosur - Adhiyamankottai road
1.3) Construction of Box culvert (2.00mx2.00m) at Km 2/4 of Malur - Hosur - Adhiyamankottai road
1.4) Construction of Box culvert (2.00mx2.00m) at Km 3/4 of Malur - Hosur - Adhiyamankottai road
1.5) Construction of Drain at Km 3/10 of Malur - Hosur - Adhiyamankottai road
Vibrated Cement Concrete M20 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Culvert Wing wall and Parapet as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Rev-5.
1.1) Reconstruction of Box culvert (3.00mx3.00m) at Km 0/8 of Malur - Hosur - Adhiyamankottai road in lieu of existing cut stone slab culvert
1.2) Construction of Box culvert (2.00mx2.00m) at Km 1/6 of Malur - Hosur - Adhiyamankottai road
1.3) Construction of Box culvert (2.00mx2.00m) at Km 2/4 of Malur - Hosur - Adhiyamankottai road
1.4) Construction of Box culvert (2.00mx2.00m) at Km 3/4 of Malur - Hosur - Adhiyamankottai road
Vibrated cement concrete of grade M30 (Design mix) using 20mm and below hard broken granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for WEARING COAT 75mm UNIFORM THICKNESS OVER DECK SLAB
1.1) Reconstruction of Box culvert (3.00mx3.00m) at Km 0/8 of Malur - Hosur - Adhiyamankottai road in lieu of existing cut stone slab culvert
1.2) Construction of Box culvert (2.00mx2.00m) at Km 1/6 of Malur - Hosur - Adhiyamankottai road
1.3) Construction of Box culvert (2.00mx2.00m) at Km 2/4 of Malur - Hosur - Adhiyamankottai road
1.4) Construction of Box culvert (2.00mx2.00m) at Km 3/4 of Malur - Hosur - Adhiyamankottai road
Supply and fabrication of Steel Grade Fe 500/Fe500D/Fe 550/ Fe 550D required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification as per clause 900, 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision
1.1) Reconstruction of Box culvert (3.00mx3.00m) at Km 0/8 of Malur - Hosur - Adhiyamankottai road in lieu of existing cut stone slab culvert
1.2) Construction of Box culvert (2.00mx2.00m) at Km 1/6 of Malur - Hosur - Adhiyamankottai road
1.3) Construction of Box culvert (2.00mx2.00m) at Km 2/4 of Malur - Hosur - Adhiyamankottai road
1.4) Construction of Box culvert (2.00mx2.00m) at Km 3/4 of Malur - Hosur - Adhiyamankottai road
1.5) Construction of Drain at Km 3/10 of Malur - Hosur - Adhiyamankottai road
Filling with Quarry dust including cost and conveyance of material to work site including labour charges for filling, laying, compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers or built - up to the bottom level inclusive all other incidental charges etc., complete as per clause 304 & 2907 of MORTH Vth Revision
1.1) Reconstruction of Box culvert (3.00mx3.00m) at Km 0/8 of Malur - Hosur - Adhiyamankottai road in lieu of existing cut stone slab culvert
1.2) Construction of Box culvert (2.00mx2.00m) at Km 1/6 of Malur - Hosur - Adhiyamankottai road
1.3) Construction of Box culvert (2.00mx2.00m) at Km 2/4 of Malur - Hosur - Adhiyamankottai road
1.4) Construction of Box culvert (2.00mx2.00m) at Km 3/4 of Malur - Hosur - Adhiyamankottai road
Filling with Excav
1.5) Construction of Drain at Km 3/10 of Malur - Hosur - Adhiyamankottai road
Providing and fixing of M.S.grating 300x200 mm size with M.S.Flats of 25x10mm of outer frames, 20x10 mm of inner braces with mild steel grating and fixing them in position
1.5) Construction of Drain at Km 3/10 of Malur - Hosur - Adhiyamankottai road
Providing Barrier Type Kerb for median / island susing vibrated cement concrete of grade M20 (1:1.5:3) using 20 and 12 mm ISS HBG metal from approved quarry, including cost and conveyance of all materials to work site, including hire and fuel charges of all the machineries employed for this work, including all labour charges for mixing, laying, curing, painting, including all other incidental charges etc., complete as per drawing and standard specification.
1.7) Construction of Kerb Type Centre median at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
敤挠浥湥⁴潣据敲整㐠挵塭㔴㔴浣㙘‰楳敺椠据畬楤杮挠獯⁴湡潣癮祥湡散漠污慭整楲污ⱳ攠畱灩敭瑮慭档湩牥⁹湡慬潢牵眠瑩污敬摡湡楬瑦ⱳ氠慯楤杮挠慨杲獥渠捥獥慳祲映牯猠瑡獩慦瑣牯⁹潣灭敬楴湯漠桴潷歲愠楤敲瑣摥戠⁹桴湥楧敮牥椠档牡敧楈桧椠瑮湥楳祴删瑥潲刭晥敬瑣潲猠敨瑥猠慨汬挠湯楳瑳漠業楮畭潣晥楦楣湥⁴景爠晥潲爭晥敬瑣潩獡瀠牥吠扡敬㘠㘮漠剉⁃㜶㈭⸲琠敨爠牥敲汦捥楴敶猠敨瑥湩桳污敢挠癯牥摥甠摮牥㜠礠慥慷牲湡祴椠獳敵潦楦汥数晲牯慭据湡散瑲晩敩潣祰漠桴敲敹牡畯摴潯硥潰畳敲爠灥牯⁴桳污敢漠瑢楡敮獡瀠牥䤠䍒㘠㨷〲㈱⠠獡瀠牥䴠剏䠦匠数楣楦慣楴湯丠㠠⸩ㄊ㠮 牐癯摩湩潒摡䘠牵楮畴敲瑡䬠⼰ⴰ⼴‰景䴠污牵ⴠ䠠獯牵ⴠ䄠桤祩浡湡潫瑴楡爠慯dᔀ焀᐀ጀ〶砠㐠‵敒瑣湡畧慬ひ潆匠杩慨楶杮愠敲䴠牯桴湡〠㤮匰浱吠灹䥘Խȉ倀爀漀瘀椀搀椀渀最 愀渀搀 攀爀攀挀琀椀渀最 漀昀 䐀椀爀攀挀琀椀漀渀 愀渀搀 倀氀愀挀攀 䤀搀攀渀琀椀昀椀挀愀琀椀漀渀 刀攀琀爀漀ⴀ爀攀昀氀攀挀琀漀爀椀猀攀搀 匀椀最渀 洀愀搀攀 漀甀琀 漀昀 䠀椀最栀 䤀渀琀攀渀猀椀琀礀 倀爀椀猀洀愀琀椀挀 䜀爀愀搀攀 匀栀攀攀琀椀渀最 挀漀渀昀椀爀洀椀渀最 琀漀 吀礀瀀攀ⴀ䤀嘀 猀琀愀渀搀愀爀搀猀 漀昀 䤀刀䌀ⴀ㘀㜀㨀 ㈀ ㈀ 愀渀搀 䄀匀吀䴀 䐀 㐀㤀㔀㘀 ጀ〠㤀Ⰰ 猀瀀攀挀椀昀椀挀愀琀椀漀渀 愀渀搀 昀椀砀攀搀 漀瘀攀爀 ㈀洀洀 琀栀椀挀欀䄀氀甀洀椀渀椀甀洀 猀栀攀攀琀 昀椀砀攀搀 漀瘀攀爀 愀 戀愀挀欀 猀甀瀀瀀漀爀琀椀渀最 昀爀愀洀攀 漀昀 ㈀㔀洀洀砀㈀㔀洀洀砀㌀洀洀 䴀椀氀搀 匀琀攀攀氀 愀渀最氀攀 愀渀搀 猀甀瀀瀀漀爀琀攀搀 漀渀 愀 洀椀氀搀 猀琀攀攀氀 愀渀最氀攀 瀀漀猀琀 㜀㔀堀㜀㔀堀㘀洀洀 眀椀琀栀 愀 挀氀攀愀爀 栀攀椀最栀琀 漀昀 渀漀琀 氀攀猀猀 琀栀愀渀 ㈀⸀ 洀 昀爀漀洀 琀栀攀 最爀漀甀渀搀 氀攀瘀攀氀 琀漀 琀栀攀 戀漀琀琀漀洀 漀昀 琀栀攀 猀椀最渀 戀漀愀爀搀 愀渀搀 ⸀㘀 洀 戀攀氀漀眀 最爀漀甀渀搀 氀攀瘀攀氀⸀ 吀栀攀 猀椀最渀 瀀漀猀琀 猀栀漀甀氀搀 戀攀 瀀愀椀渀琀攀搀 愀猀 瀀攀爀 䤀刀䌀 㘀㜀ⴀ㈀ ㈀ 愀渀搀 昀椀爀洀氀礀 昀椀砀攀搀 琀漀 琀栀攀 最爀漀甀渀搀 戀礀 洀攀愀渀猀 漀昀 瀀爀漀瀀攀爀氀礀 搀攀猀椀最渀攀搀 昀漀甀渀搀愀琀椀漀渀 眀椀琀栀 䴀㔀 最爀愀搀攀 挀攀洀攀渀琀 挀漀渀挀爀攀琀攀 㐀㔀挀洀堀㐀㔀挀洀堀㘀 挀洀 猀椀稀攀 椀渀挀氀甀搀椀渀最 挀漀猀琀 愀渀搀 挀漀渀瘀攀礀愀渀挀攀 漀昀 愀氀氀 洀愀琀攀爀椀愀氀猀Ⰰ 攀焀甀椀瀀洀攀渀琀Ⰰ 䴀愀挀栀椀渀攀爀礀 愀渀搀 氀愀戀漀甀爀 眀椀琀栀 愀氀氀 氀攀愀搀猀 愀渀搀 氀椀昀琀猀Ⰰ 氀漀愀搀椀渀最 挀栀愀爀最攀猀 渀攀挀攀猀猀愀爀礀 昀漀爀 猀愀琀椀猀昀愀挀琀漀爀礀 挀漀洀瀀氀攀琀椀漀渀 漀昀 琀栀攀 眀漀爀欀 愀猀 搀椀爀攀挀琀攀搀 戀礀 琀栀攀 攀渀最椀渀攀攀爀 椀渀 挀栀愀爀最攀⸀ 䠀椀最栀 椀渀琀攀渀猀椀琀礀 刀攀琀爀漀 刀攀昀氀攀挀琀爀漀 猀栀攀攀琀 猀栀愀氀氀 挀漀渀猀椀猀琀 漀昀 洀椀渀椀洀甀洀 挀漀攀昀昀椀挀椀攀渀琀 漀昀 刀攀琀爀漀ⴀ爀攀昀氀攀挀琀椀漀渀 愀猀 瀀攀爀 吀愀戀氀攀 㘀⸀㘀 漀昀 䤀刀䌀 㘀㜀ⴀ㈀ ㈀⸀ 吀栀攀 爀攀琀爀漀ⴀ 爀攀昀氀攀挀琀椀瘀攀 猀栀攀攀琀椀渀最 猀栀愀氀氀 戀攀 挀漀瘀攀爀攀搀 甀渀搀攀爀 㜀 礀攀愀爀 眀愀爀爀愀渀琀礀 椀猀猀甀攀搀 昀漀爀 昀椀攀氀搀 瀀攀爀昀漀爀洀愀渀挀攀 愀渀搀 愀 挀攀爀琀椀昀椀攀搀 挀漀瀀礀 漀昀 琀栀爀攀攀 礀攀愀爀猀 漀甀琀搀漀漀爀 攀砀瀀漀猀甀爀攀 爀攀瀀漀爀琀 猀栀愀氀氀 戀攀 漀戀琀愀椀渀攀搀 愀猀 瀀攀爀 䤀刀䌀 㘀㜀㨀㈀ ㈀⸀ ⠀愀猀 瀀攀爀 䴀伀刀吀☀䠀 匀瀀攀挀椀昀椀挀愀琀椀漀渀 一漀⸀㠀 ⤀⸀㠀⤀ 倀爀漀瘀椀搀椀渀最 刀漀愀搀 䘀甀爀渀椀琀甀爀攀猀 愀琀 䬀洀 ⼀ ⴀ㐀⼀ 漀昀 䴀愀氀甀爀 ⴀ 䠀漀猀甀爀 ⴀ 䄀搀栀椀礀愀洀愀渀欀漀琀琀愀椀 爀漀愀搀ᔀ嘀᐀☀ࠄ牐癯摩湩楦楸杮漠楒楧敍楤湡䴠牡敫潤扵敬猠摩摥洠摡景瀠汯捹牡潢慮整映牯椠灭捡⁴敲楳瑳湡散愠摮朠潯敷瑡敨扡汩瑩倠汯捹牡潢慮整甠敳潦潭摬湩桴敭楤湡洠牡敫桳污慨敶愠洠湩浩浵䤠潺浩慰瑣猠牴湥瑧慶畬景㘠〰䨠洯愠⁴潲浯琠浥数慲畴敲桔浩慰瑣猠牴湥瑧景琠敨瀠汯⁹慣扲湯瑡桳畯摬渠瑯搠捥敲獡潴氠獥桴湡㜠┰漠瑩湩瑩慩慶畬湯戠楥杮猠扵敪瑣摥琠噕眠慥桴牥湩獡瀠牥䄠呓⁍⁇㔱‵潦〱〰栠畯獲漠硥潰畳敲琠′敹牡景渠瑡牵污眠慥桴牥湩吠敨戠摯⁹景琠敨洠摥慩慭歲牥猠慨汬戠湩琠敨映牯景愠獩獯散敬牴灡穥楯慤瑳畲瑣牵景氠湥瑧㔱挠敨杩瑨愠摮眠摩桴漠〱砠ㄠ‰浣桔敭楤湡洠牡敫桳污慨敶映畬牯獥散瑮礠汥潬⁷敲牴敲汦捥楴敶猠敨瑥湩潣普物業杮琠祔数堠⁉灳捥晩捩瑡潩獮愠数十䵔䐠㐠㔹⸶䄠敲景爠晥敬瑣癩桳敥楴杮猠潨汵潮⁴敢氠獥桴湡㜠‰浣⸲䔠杤景爠瑥潲爠晥敬瑣癩桳污敢挠湯散污摥甠楳杮愠朠楲汬洯獥⽨楳業慬敭档湡獩潴瀠敲敶瑮瘠湡慤楬浳愠摮猠敨瑥湩楰晬牥条吠敨氠杯景琠敨洠湡晵捡畴敲桳污敢攠扭獯敳湡慰湩整湩挠湯牴獡楴杮挠汯畯湯戠瑯楳敤漠敭楤湡洠牡敫潦楤瑳湩瑣椠敤瑮晩捩瑡潩(ߡȉ倀爀漀瘀椀搀椀渀最 愀渀搀 昀椀砀椀渀最 漀昀 䐀椀最椀琀愀氀氀礀 倀爀椀渀琀攀搀 刀攀琀爀漀 刀攀昀氀攀挀琀漀爀椀稀攀搀 伀瘀攀爀栀攀愀搀 䜀愀渀琀爀礀 䤀渀昀漀爀洀愀琀漀爀礀 猀椀最渀 䈀漀愀爀搀 洀愀搀攀 漀昀 挀甀戀攀 挀漀爀渀攀爀 䴀椀挀爀漀 倀爀椀猀洀愀琀椀挀 最爀愀搀攀 猀栀攀攀琀椀渀最 挀漀渀昀漀爀洀椀渀最 琀漀 吀礀瀀攀 堀䤀 猀琀愀渀搀愀爀搀猀 漀昀 䤀刀䌀㘀㜀 ⴀ ㈀ ㈀ 愀渀搀 䄀匀吀䴀䐀㐀㤀㔀㘀 ጀ† 㤀Ⰰ 猀瀀攀挀椀昀椀挀愀琀椀漀渀 愀渀搀 昀椀砀攀搀 漀瘀攀爀 ㈀洀洀 琀栀椀挀欀 愀氀甀洀椀渀甀洀 猀栀攀攀琀 昀椀砀攀搀 漀渀 戀愀挀欀 猀甀瀀瀀漀爀琀椀渀最 昀爀愀洀攀 洀椀氀搀 猀琀攀攀氀 䰀 愀渀最氀攀 漀昀 猀椀稀攀 㔀 洀洀 砀 㔀 洀洀 砀 㘀洀洀⸀ 吀栀攀 嘀攀爀琀椀挀愀氀 猀甀瀀瀀漀爀琀 瀀漀猀琀 昀漀爀 琀栀攀 椀渀猀琀愀氀氀愀琀椀漀渀 漀昀 漀瘀攀爀栀攀愀搀 猀椀最渀 䜀愀渀琀爀礀 猀栀愀氀氀 戀攀 洀愀搀攀 漀昀 ㌀ 一䈀 ⠀一漀洀椀渀愀氀 䈀漀爀攀⤀ 䴀匀 倀椀瀀攀 眀椀琀栀 ㈀洀洀 琀栀椀挀欀 眀椀琀栀 愀 最爀漀甀渀搀 挀氀攀愀爀愀渀挀攀 漀昀 㘀 洀攀琀攀爀猀 愀氀漀渀最 眀椀琀栀 㠀 一䈀 ⠀一漀洀椀渀愀氀 䈀漀爀攀⤀ 䴀匀 倀椀瀀攀 眀椀琀栀 㐀洀洀 琀栀椀挀欀 愀渀搀 㐀 一䈀 ⠀一漀洀椀渀愀氀 䈀漀爀攀⤀ 䴀匀 倀椀瀀攀 眀椀琀栀 ㌀⸀㈀ 洀洀 琀栀椀挀欀 猀甀瀀瀀漀爀琀 瀀漀猀琀猀⸀ 䴀匀 䈀愀猀攀 瀀氀愀琀攀 漀昀 猀椀稀攀 ㈀ 洀洀 砀 ㈀ 洀洀 砀 ㈀㔀洀洀 愀渀搀 䴀匀 吀漀瀀 瀀氀愀琀攀 漀昀 猀椀稀攀 㤀 洀洀 砀 㘀㔀 洀洀 砀 㘀洀洀 琀漀 戀攀 甀猀攀搀 琀漀 栀漀氀搀 琀栀攀 猀椀最渀 戀漀愀爀搀 愀琀 琀栀攀 琀漀瀀 愀渀搀 戀漀琀琀漀洀 爀攀猀瀀攀挀琀椀瘀攀氀礀⸀ 䴀匀 匀琀椀昀昀攀渀攀爀 瀀氀愀琀攀猀 㠀洀洀 琀栀椀挀欀 漀昀 猀椀稀攀猀 㐀㈀ 砀㐀㈀ Ⰰ 㘀㠀㈀砀㐀㈀ Ⰰ ㈀㠀㠀砀㈀㠀㠀Ⰰ ㈀㠀㠀砀㤀㈀㜀 ☀ 㐀㐀砀㌀ 愀爀攀 琀漀 戀攀 甀猀攀搀⸀ 䄀渀挀栀漀爀 戀漀氀琀猀 漀昀 搀椀洀攀渀猀椀漀渀 ㈀㔀洀洀 搀椀愀 愀渀搀 洀洀 氀攀渀最琀栀 愀爀攀 琀漀 戀攀 甀猀攀搀 愀猀 昀椀砀琀甀爀攀猀⸀ 吀栀攀 愀瀀瀀爀漀瘀攀搀 搀椀爀攀挀琀椀漀渀 椀渀昀漀爀洀愀琀椀漀渀 猀栀漀甀氀搀 戀攀 搀椀最椀琀愀氀氀礀 瀀爀椀渀琀攀搀 愀渀搀 猀栀漀甀氀搀 栀愀瘀攀 㜀 ─ 漀昀 琀栀攀 挀漀ⴀ攀昀昀椀挀椀攀渀琀 漀昀 刀攀琀爀漀ⴀ爀攀昀氀攀挀琀椀漀渀 瘀愀氀甀攀猀 愀最愀椀渀猀琀 琀栀攀 瘀愀氀甀攀猀 愀猀 洀攀渀琀椀漀渀攀搀 椀渀 吀愀戀氀攀 㘀⸀㤀 漀昀 䤀刀䌀㘀㜀 ጀ†㈀ ㈀⸀ 吀栀攀 䰀愀琀攀砀 瀀爀椀渀琀攀爀 甀猀攀搀 昀漀爀 搀椀最椀琀愀氀 瀀爀椀渀琀椀渀最 猀栀漀甀氀搀 甀猀攀 椀渀欀猀 眀椀琀栀 氀漀眀 嘀伀䌀 攀洀椀猀猀椀漀渀猀 愀渀搀 栀愀瘀攀 最爀攀攀渀 最甀愀爀搀Ⰰ 攀挀漀 氀漀最漀 挀攀爀琀椀昀椀挀愀琀攀猀 愀猀 瀀攀爀 唀䰀 ㈀㠀 猀琀愀渀搀愀爀搀猀⸀ 吀栀攀 爀攀琀爀漀ⴀ爀攀昀氀攀挀琀椀瘀攀 猀栀攀攀琀椀渀最 猀栀愀氀氀 戀攀 挀漀瘀攀爀攀搀 甀渀搀攀爀 礀攀愀爀猀 眀愀爀爀愀渀琀礀 椀猀猀甀攀搀 昀漀爀 昀椀攀氀搀 瀀攀爀昀漀爀洀愀渀挀攀 愀渀搀 愀 挀攀爀琀椀昀椀攀搀 挀漀瀀礀 漀昀 琀栀爀攀攀 礀攀愀爀猀 伀甀琀搀漀漀爀 攀砀瀀漀猀甀爀攀 爀攀瀀漀爀琀 猀栀愀氀氀 戀攀 漀戀琀愀椀渀攀搀 愀猀 瀀攀爀 䤀刀䌀 㘀㜀ⴀ㈀ ㈀ ⠀䄀猀 瀀攀爀 䴀漀刀吀☀䠀 猀瀀攀挀椀昀椀挀愀琀椀漀渀 一漀⸀㠀 ⤀⸀䌀愀渀琀椀氀攀瘀攀爀 猀椀最渀 猀栀愀氀氀 戀攀 椀渀猀琀愀氀氀攀搀 愀琀 琀栀攀 猀椀琀攀 愀猀 瀀攀爀 琀栀攀 愀瀀瀀爀漀瘀攀搀 猀琀爀甀挀琀甀爀愀氀 愀渀搀 昀漀甀渀搀愀琀椀漀渀 搀爀愀眀椀渀最 瀀爀漀瘀椀搀攀搀 椀渀 琀栀攀 琀攀渀搀攀爀 搀漀挀甀洀攀渀琀 愀渀搀 椀渀挀氀甀搀椀渀最 挀漀猀琀 愀渀搀 挀漀渀瘀攀礀愀渀挀攀 漀昀 愀氀氀 洀愀琀攀爀椀愀氀猀Ⰰ 攀焀甀椀瀀洀攀渀琀Ⰰ 洀愀挀栀椀渀攀爀椀攀猀 琀漀 眀漀爀欀猀椀琀攀Ⰰ 椀渀挀氀甀搀椀渀最 愀氀氀 氀愀戀漀甀爀 挀栀愀爀最攀猀 昀漀爀 昀椀砀椀渀最 琀栀攀 最愀渀琀爀礀
1.7) Construction of Kerb Type Centre median at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
in position with all leads and lifts, loading charges and necessary for satisfactory completion of the work as directed by the engineer-in-charge etc., complete. of size 12.00 m X 1.8 meƐȈ匀灵汰楹杮愠摮椠獮慴汬瑡潩景搠汥湩慥潴獲⠠潲摡眠祡椠摮捩瑡牯ⱳ栠穡牡慭歲牥湡扯敪瑣洠牡敫獲Ⱙ㠠ⴰ〱‰浣栠杩扡癯牧畯摮氠癥汥慰湩整瑡愠瑬牥慮楴敶祬戠慬正愠摮眠楨整椠㔱挠楷敤猠牴灩ⱳ映瑩整楷桴㠠‰⁸〱‰浭爠捥慴杮汵牡漠㔷洠楤楣捲汵牡爠晥敬瑣牯獩摥瀠湡汥瑡琠敨琠灯畢楲摥漠牰獥敳湩潴琠敨朠潲湵湡潣普牯業杮琠剉ⵃ㤷攠捴Ⱞ挠浯汰瑥愨数潍呒䠦猠数楣楦慣楴湯丠㠠㘰)ᔀ一᐀搀
1.8) Providing Road Furnitures at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
1.8) Providing Road Furnitures at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
One Number
One Number
One Number
One Number
1.8) Providing Road Furnitures at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
One Square Meter
1.8) Providing Road Furnitures at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
1.8) Providing Road Furnitures at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
1.8) Providing Road Furnitures at Km 0/0-4/0 of Malur - Hosur - Adhiyamankottai road
Calculation of SubTotal, GST and Total Amount carried out by system automatically
Basic cost of value put to tender as per estimate
Add GST at 18%
Total Value put to Tender
Negotiated Percentage
Final Negotiated Value
Add GST at 18% of Final Negotiated Value
Total Value of Contract Including 18% of GST
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
PQMHA_5.pdf
Tender Documents • 0.64 MB
BidMHA_5.pdf
Additional Documents • 0.60 MB
BOQ_774161.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid