Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6.0 L
Closing Date
30 Apr 2026, 5:00 pmClosed
Superintending Engineer
Office of The Superintending Engineer Const. Circle, UPJNU Jhansi
Operation and Maintenance of Jhansi Augmentation Water Supply Scheme 110 mld and Jhansi Babina Water Supply Scheme 45 mld for FY 2026-27 at Jhansi
2026_UPJNM_1136456_1
521/F-03/81 Dated 10-04-2026
Open Tender
Water Supply
Percentage
320 days
Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Executive Engineer Construction Division EM UPJNU
₹6.0 L
Yes
Jhansi
27 May 2026
13 Apr 2026
30 Apr 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-A (Civil work) | - | - | - | - |
| 2 | Skilled Operating Staff for Operation and Watch & Ward of 45 mld and 110 mld WTP | - | - | - | - |
| 3 | Providing of skilled operating staff for opening and controlling sluice valve at CP tank (Head work Matateela ) in three shift at 45 MLD
02 in each shift | - | - | - | - |
| 4 | 1st shift (02 nos in each shift@ Rs 423 each) | - | Days | - | - |
| 5 | 2 nd shift (02 nos in each shift@ Rs 423 each) | - | Days | - | - |
| 6 | 3rd shift (02 nos in each shift@ Rs 423 each) | - | Days | - | - |
| 7 | Providing of Skilled Petroling staff for Raw Water Gravity Main pipe line Matateela head work to Babina wtp - 20.0 km approx (1x3= 3 for 320 days @ Rs 423 each for 8 hours for each shift) | - | Days | 1 | - |
| 8 | Clear Water Gravity Main Babina to Elite Circle Jhansi 27.50 km approx(1x3= 3 for 320 days @ Rs 423 each for 8 hours for each shift) | - | Days | 1 | - |
| 9 | Providing of skilled operating staff for Back wash operating sluice valve,air sluice valve, in three shift at WTP 45 MLD plant (2 Nos in each shift x 3= 6 nos for 320 days) 8 hours for each shift | - | Days | - | - |
| 10 | Providing of skilled operating staff for Back wash operating sluice valve,air sluice valve, in three shift at WTP 110 MLD plant (2 Nos in each shift x 3= 6 nos for 320days) 8 hours for each shift | - | Days | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.35 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_2122208.xls
BOQ • 0.69 MB
Doc.pdf
Tender Documents • 15.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .