Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
15 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
24 conditions · 13 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-F 1, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
As per IRSGCC 2022 (including correction slips and amendments) as on date of publishing of tender
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N=Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Bid Capacity: The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI of GCC April 2022.
Credentials if submitted in foreign currency shall be converted into Indian currency i.e., Indian Rupee as under: The conversion rate of US Dollars into Rupees shall be the daily representative exchange rates published by the Reserve Bank of India or entity authorized by RBI to do so for the relevant date or immediately previous date for which rates have been published. Where, relevant date shall be as on the last day of month previous to the one in which tender is invited. In case of any other currency, the same shall first be converted to US Dollars as on the last day of month previous to the one in which tender is invited, and the amount so derived in US Dollars shall be converted into Rupees at the aforesaid rate. The conversion rate of such currencies shall be the daily representative exchange rates published by the International Monetary Fund for the relevant date or immediately previous date for which rates have been published. [Explanation for Para 10 of the Tender Form (Second Sheet) including Para 10.1 to 10.5 - Eligibility Criteria: 1. Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. 2. In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of credentials. 3. If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials 4. In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work.
If a bidder has successfully completed a work as subcontractor and the work experience certificate has been issued for such work to the subcontractor by a Govt. Organization or public listed company as defined in Note for Item 10.1 Para 10 of the Tender Form (Second Sheet), the same shall be considered for the purpose of fulfillment of credentials. 6. In case a work is considered similar in nature for fulfillment of technical credentials, the overall cost including the PVC amount (if paid) of that completed work or substantially completed work, shall be considered and no separate evaluation for each component of that work shall be made to decide eligibility. 7. In case of newly formed partnership firm, the credentials of individual partners from previous propriety firm(s) or dissolved previous partnership firm(s) or split previous partnership firm(s), shall be considered only to the extent of their share in previous entity on the date of dissolution / split and their share in newly formed partnership firm. For example, a partner A had 30% share in previous entity and his share in present partnership firm is 20%. In the present tender under consideration, t 8. he credentials of partner A will be considered to the extent of 0.3*0.2*value of the work done in the previous entity. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc. 9. In case of existing partnership firm, if any one or more partners quit the partnership firm, the credentials of remaining partnership firm shall be re-worked out i.e., the quitting partner(s) shall take away his credentials to the extent of his share on the date of quitting the partnership firm(e.g. in a partnership firm of partners A, B & C having share 30%, 30% & 40% respectively and credentials of Rs 10 crore; in case partner C quits the firm, the credentials of this partnership firm shall remain as Rs 6 crore). For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc. 10. In case of existing partnership firm if any new partner(s) joins the firm without any modification in the name and PAN/TAN no. of the firm, the credentials of partnership firm shall get enhanced to the extent of credentials of newly added partner(s) on the same principles as mentioned in item 6 above. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deeds, dissolution/splitting deeds and proof of surrender of PAN No.(s) in case of dissolution of partnership firm etc. 11. Any partner in a partnership firm cannot use or claim his credentials in any other firm without leaving the partnership firm i.e., In a partnership firm of A&B partners, A or B partner cannot use credentials of partnership firm of A&B partners in any other partnership firm or propriety firm without leaving partnership firm of A&B partners.
In case a partner in a partnership firm is replaced due to succession as per succession law, the proportion of credentials of the previous partner will be passed on to the successor13. If the percentage share among partners of a partnership firm is changed, but the partners remain the same, the credentials of the firm before such modification in the share will continue to be considered for the firm as it is without any change in their value. Further, in case a partner of partnership firm retires without taking away any credentials from the firm, the credentials of partnership firm shall remain the same as it is without any change in their value. 14. In a partnership firm "AB" of A&B partners, in case A also works as propriety firm "P" or partner in some other partnership firm "AX", credentials of A in propriety firm "P" or in other partnership firm "AX" earned after the date of becoming a partner of the firm AB shall not be added in partnership firm AB. 15. In case a tenderer is LLP, the credentials of tenderer shall be worked out on above lines similar to a partnership firm. 16. In case company A is merged with company B, then company B would get the credentials of company A also.
17 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
For the tender value above Rs.20.0 crores, the tenderers should submit Bid capacity statement in the prescribed proforma (As per GCC) duly verified by Chartered Accountant. In case, the tenderer/s failed to upload Bid Capacity Proforma along with offer, their /his offer shall be considered as incomplete and will be rejected summarily
Tender value is including escalation of (-)10% (minus ten percent) on CPWD DSR rates. Tenderer should note this before quoting the rates.
The original Bank Guarantee (in lieu of Bid Security) should be delivered in person to the official nominated (i.e OS/Tenders/GS/SC Division) as indicated in the tender document Before closing date for submission of bids. (i.e. excluding the last date of submission of Bids).
All the instructions furnished in the Technical Compliance / Commercial Compliance / Custom / Undertakings / General instructions are only indicative and not exhaustive. The tenderer shall read the GCC / Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender documents and strictly adhere to the instructions and directions given therein.
1) OHE modifications in connection with ROB at HSP-OPL station (LC-12), 2) OHE modifications in connection with ROB at OPL-JMKT station (LC-18), 3) OHE modifications in connection with ROB at JMKT-BGSF station (LC-23), 4) OHE modifications in connection with ROB at BGSF-PTPK station (LC-27) & 5) OHE modifications for Sanathnagar Trip Maintenance/ Advance Inspection Center for Inspection and Maintenance activity of Electric Locos - Electrical TRD Arrangements.
C-E-GSU-TRD-10-2026-27~SCR
C-E-GSU-TRD-10-2026-27
Open
Works - General
12 Months
Hyderabad, Telangana
₹0
₹4.2 L
22 Aug 2026
22 Aug 2026
1 Sept 2026
817 items across 15 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 53,49,974.1 | ||
| Track | Kilometre | — | — | ||
| — | 20.00 | — | — | ||
| 1(a)Preparation of Designs and drawings for OHE | — | — | — | 4,01,320 | |
| — | 1.00 | — | — | ||
| 1(c)Preparation of Station working Rules DIAGRAM and WORKING Instructions | — | — | — | 11,869 | |
| — | 48.00 | — | — | ||
| Foot | Square | — | — | ||
| 1(d)Supply & installation of traction working rule diagram boards | — | — | — | 61,008 | |
| — | 20.00 | — | — | ||
| 1(g)Preparation of Designs of structure erected drawing(SED) | — | — | — | 13,360 | |
| — | 12.00 | — | — | ||
| 3(a)Erection of Traction masts and main masts of Switching stations and LT supply Transformer station. | — | — | — | 41,580 | |
| — | 6.00 | — | — | ||
| 3(b)" Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc" | — | — | — | 91,602 | |
| — | 16.00 | — | — | ||
| 3(e) Supply of Guy rod assembly. | — | — | — | 1,49,296 | |
| — | 16.00 | — | — | ||
| 3(e)Erection of Guy rod assembly. | — | — | — | 17,920 | |
| — | 53.00 | — | — | ||
| 4(a)(i)Supply without Insulator and Single bracket assembly for conventional OHE. | — | — | — | 6,42,042 | |
| — | 48.00 | — | — | ||
| 4(a)(i) Erection of Single bracket assembly for conventional OHE. | — | — | — | 51,840 | |
| — | 2.00 | — | — | ||
| 4(a)(ii)"Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE" | — | — | — | 3,238 | |
| — | 3.00 | — | — | ||
| 4(a) (iii)"Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE" | — | — | — | 5,577 | |
| — | 1.00 | — | — | ||
| — | Kilometre | — | — | ||
| 7(a)Erection Stringing of along feeder (either All Aluminum 25 kV Feeder (single spider) or copper feeder wire | — | — | — | 12,004 | |
| — | 250.00 | — | — | ||
| 7[c]Erection of Large Span Wire(130 Sq.mm) | — | — | — | 51,750 | |
| — | 3.00 | — | — | ||
| 8(a) (v)Supply of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE. | — | — | — | 2,11,749 | |
| — | 3.00 | — | — | ||
| 8(a) (v)Erection of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE. | — | — | — | 12,000 | |
| — | 1.00 | — | — | ||
| 8(a) (xii)Marking of "Y" - Measurement at BWA locations. | — | — | — | 185 | |
| — | 8.00 | — | — | ||
| 8(b) (ii)Supply without Insulator and material for terminations of Conventional OHE conductor. | — | — | — | 65,608 | |
| — | 8.00 | — | — | ||
| 8(b) (ii)Erection without Insulator and material for terminations of Conventional OHE conductor. | — | — | — | 8,960 | |
| — | 2.00 | — | — | ||
| 8(b) (iii)Supply (Without Insulator) and Materials for Termination of Along Feeder(Aluminium/Copper) | — | — | — | 10,384 | |
| — | 2.00 | — | — | ||
| 8(b) (iii)Erection (Without Insulator) and Materials for Termination of Along Feeder(Aluminium/Copper) | — | — | — | 2,000 | |
| — | 13.00 | — | — | ||
| 9(a)Supply without Insulators and anti creep with galvanised steel wire for conventional OHE. | — | — | — | 2,86,000 | |
| — | 13.00 | — | — | ||
| 9(a)Erection without Insulators and anti creep with galvanised steel wire for conventional OHE. | — | — | — | 43,836 | |
| — | 16.00 | — | — | ||
| 11(a) (i)Supply with out insulator and 25 kV solid core cut-in insulator. | — | — | — | 29,744 | |
| — | 16.00 | — | — | ||
| 11(a) (i)Erection with out insulator and 25 kV solid core cut-in insulator. | — | — | — | 11,376 | |
| — | 12.00 | — | — | ||
| 11(a) (ii)Supply without insulator and 25 kV solid core suspension insulator. | — | — | — | 24,264 | |
| — | 12.00 | — | — | ||
| 11(a) (ii)Erection without insulator and 25 kV solid core suspension insulator. | — | — | — | 5,928 | |
| — | 4.00 | — | — | ||
| 11(b)Supply without insulator and 25 kV Post Insulators. | — | — | — | 3,400 | |
| — | 4.00 | — | — | ||
| 11(b)Erection without insulator and 25 kV Post Insulators. | — | — | — | 1,344 | |
| — | 15.00 | — | — | ||
| 15(a)Supply 50 Sqmm of copper jumpers.(C-Jummper, F- jumpper, Anti theft jummper) | — | — | — | 11,340 | |
| — | 15.00 | — | — | ||
| 15(a)Erection of 50 Sqmm of copper jumpers.(C-Jummper, F- jumpper, Anti theft jummper) | — | — | — | 5,340 | |
| — | 8.00 | — | — | ||
| 15(b)"Supply 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper)" | — | — | — | 17,008 | |
| — | 8.00 | — | — | ||
| 15(b) Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper)" | — | — | — | 5,440 | |
| — | 1.00 | — | — | ||
| 15(e)Supply Aluminium Jumper | — | — | — | 3,654 | |
| — | 1.00 | — | — | ||
| 15(e)Erection of Aluminium Jumper | — | — | — | 342 | |
| — | 102.00 | — | — | ||
| 16(a)Erection of structure bonds | — | — | — | 84,966 | |
| — | 102.00 | — | — | ||
| 16(a)Erection of structure bonds | — | — | — | 31,008 | |
| — | 76.00 | — | — | ||
| 16(b)Erection of longitudinal bond. | — | — | — | 45,904 | |
| — | 76.00 | — | — | ||
| 16(b)Erection of longitudinal bond. | — | — | — | 20,824 | |
| — | 130.00 | — | — | ||
| 16(c) Supply transverse and special bonds. | — | — | — | 1,23,630 | |
| — | 130.00 | — | — | ||
| 16(c) Erection of transverse and special bonds. | — | — | — | 42,380 | |
| — | 614.00 | — | — | ||
| 16(aa)Drilling of holes on rails | — | — | — | 65,698 | |
| — | 16.00 | — | — | ||
| 17(a)"Supply single Earth electrode at COP/FOB/PTFE/Steel Girder etc.." | — | — | — | 56,176 | |
| — | 16.00 | — | — | ||
| 17(a)"Erection of single Earth electrode at COP/FOB/PTFE/Steel Girder etc.." | — | — | — | 21,552 | |
| — | 2.00 | — | — | ||
| 17 (c) "Supply Single Earth Electrode TSS/SP/SSP/AT" | — | — | — | 8,284 | |
| — | 14.00 | — | — | ||
| 17 (c) "Erection of Single Earth Electrode TSS/SP/SSP/AT" | — | — | — | 26,670 | |
| — | 6.00 | — | — | ||
| 17(d)Supply Copper strips for equipment earthing. | — | — | — | 5,754 | |
| — | 6.00 | — | — | ||
| 17(d)Erection of Copper strips for equipment earthing. | — | — | — | 510 | |
| — | 60.00 | — | — | ||
| 17(j)"Supply 8 SWG G.I wire for earthing" | — | — | — | 1,980 | |
| — | 60.00 | — | — | ||
| 17(j)"Erection of 8 SWG G.I wire for earthing" | — | — | — | 1,500 | |
| — | 20.00 | — | — | ||
| 26(a)(ii)Supply COPPER bus bar 18mm. | — | — | — | 45,000 | |
| — | 20.00 | — | — | ||
| 26(a)(ii)Erection of COPPER bus bar 18mm. | — | — | — | 2,920 | |
| — | 4.00 | — | — | ||
| 26(c)(i)"Supply Solid Copper BusbarConnector - 18 mm Bus | — | — | — | 4,924 | |
| — | 4.00 | — | — | ||
| 26(c)(i)Erection of Solid Copper BusbarConnector - 18 mm Bus Terminal (6310-1) | — | — | — | 188 | |
| — | 2.00 | — | — | ||
| 26(c)(ii)"Supply of Solid Copper Busbar Connector - 18 mm Bus Splice (6320) " | — | — | — | 2,832 | |
| — | 2.00 | — | — | ||
| 26(c)(ii)Erection of Solid Copper Busbar Connector - 18 mm Bus Splice (6320) " | — | — | — | 94 | |
| — | 2.00 | — | — | ||
| 27(a)"Erection of 25 kV/240 V, 5/10/25/50 KVA Auxiliary Transformer " | — | — | — | 14,468 | |
| — | 2.00 | — | — | ||
| 28Supply (without Insulators) 25 kV Drop out fuse switch.for all oil/dry type L.T.Supply transformerss of all capacities | — | — | — | 20,438 | |
| — | 2.00 | — | — | ||
| 28 Erection of 25 kV Drop out fuse switch.for all oil/dry type L.T.Supply transformerss of all capacities | — | — | — | 1,126 | |
| — | 2.00 | — | — | ||
| 30(b)(ii) "Supply Anti-climbing device for Auxiliary Transformer" | — | — | — | 3,590 | |
| — | 2.00 | — | — | ||
| 30(b)(ii) Erection of Anti-climbing device for Auxiliary Transformer" | — | — | — | 766 | |
| — | 84.00 | — | — | ||
| 31(a)Transfer of Overhead Equipment from one Mast or Support to another, including removal of Cantilever Assembly from old Mast or Support | — | — | — | 1,57,080 | |
| — | 26.00 | — | — | ||
| 31(a)Transfer of Overhead Equipment from one Mast or Support to another, including removal of Cantilever Assembly from old Mast or Support | — | — | — | 60,216 | |
| Track | Kilometre | — | — | ||
| — | 0.40 | — | — | ||
| 31 (c) Dismantling of Overhead Equipment | — | — | — | 5,582.8 | |
| — | 14.00 | — | — | ||
| 31(e)Splicing and Extension of Anchored OHE | — | — | — | 35,812 | |
| — | 72.00 | — | — | ||
| Span | Each | — | — | ||
| 31(g)"Slewing and Putting back of OHE in original position" | — | — | — | 1,64,592 | |
| — | 2.00 | — | — | ||
| 31(j)(ii)Dismantling of Cut-in Insulator | — | — | — | 1,178 | |
| — | 12.00 | — | — | ||
| 31(k)(i)Dismantlement of OHE Mast or structure by cutting | — | — | — | 36,744 | |
| — | 16.00 | — | — | ||
| 31(l)(i)Retrieval of traction masts, main masts, of Switching Station, TTC uprights etc. | — | — | — | 1,84,320 | |
| — | 10.00 | — | — | ||
| 31(n)Dismantlement of guy rod | — | — | — | 5,240 | |
| — | 6.00 | — | — | ||
| 31(o)Releasing of Multiple Cantilever Crossarm cantilever assemblies where single cantilever assembly is leftover | — | — | — | 3,144 | |
| — | 1.00 | — | — | ||
| 31(q)Splicing and Extension of Feeder conductor | — | — | — | 2,986 | |
| — | 12.00 | — | — | ||
| 31(r)Dismantling of Cantilever assemblies including insulators. | — | — | — | 5,760 | |
| — | 7.00 | — | — | ||
| 31(s)Dismantling of Fabricated Steel or Small Parts Steel (SPS) | — | — | — | 4,963 | |
| — | 3.00 | — | — | ||
| 31(t)(i)Dismantling of a regulating equipment (Three pulley type) with counter weight assembly for conventional OHE. | — | — | — | 7,626 | |
| — | 13.00 | — | — | ||
| 31(t)(iii)Dismantling of anti creep with galv. Steel wire.or Cadmium Catenary wire | — | — | — | 19,240 | |
| — | 28.00 | — | — | ||
| 31(t)(iv)Dismantling of all types of copper jumpers | — | — | — | 3,920 | |
| — | 6.00 | — | — | ||
| 31(t)(v)"Dismantling of Termination for Conventional type Overhead Equipment" | — | — | — | 3,090 | |
| — | 60.00 | — | — | ||
| Span | Each | — | — | ||
| 5531(t)(ix)"Re-adjustment of OHE Spans, including droppers " | — | — | — | 2,62,560 | |
| — | 20.00 | — | — | ||
| 31(t)(x)"Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond" | — | — | — | 2,900 | |
| — | 16.00 | — | — | ||
| 32/3(a)Erection of Traction masts and main masts of Switching stations and LT Transformer station under power block.. | — | — | — | 55,440 | |
| — | 2.00 | — | — | ||
| 5832/3(b)" Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc under power block." | — | — | — | 30,534 | |
| — | 10.00 | — | — | ||
| 32/3(e)Erection of Guy rod assembly under power block.. | — | — | — | 11,200 | |
| — | 48.00 | — | — | ||
| 32/4(a)(i) without Insulator and Erection of Single bracket assembly for conventional OHE under power block. | — | — | — | 51,840 | |
| — | 2.00 | — | — | ||
| 32/4(a)(ii)"Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE under power block" | — | — | — | 3,238 | |
| — | 3.00 | — | — | ||
| 32/4(a) (iii)"Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE under power block" | — | — | — | 5,577 | |
| — | 1.00 | — | — | ||
| — | Kilometre | — | — | ||
| 32/7(a)Erection Stringing of along feeder (either All Aluminum 25 kV Feeder (single spider) or copper feeder wire under power block | — | — | — | 12,004 | |
| — | 250.00 | — | — | ||
| 32/7[c]Erection of Large Span Wire(130 Sq.mm) under power block | — | — | — | 51,750 | |
| — | 3.00 | — | — | ||
| 32/8(a) (v)Erection of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE. under power block | — | — | — | 12,000 | |
| — | 6.00 | — | — | ||
| 32/8(b)(i) without Insulator and erection of material for termination of Single conductor of Overhead equipment or terminating wire under power block | — | — | — | 5,736 | |
| — | 2.00 | — | — | ||
| 32/8(b) (ii) without Insulator and erection of material for terminations of Conventional OHE conductor under power block | — | — | — | 2,240 | |
| — | 2.00 | — | — | ||
| 32/8(b) (iii) (Without Insulator) and Erection of Materials for Termination of Along Feeder(Aluminium/Copper) under power block | — | — | — | 2,000 | |
| — | 13.00 | — | — | ||
| 32/9(a) without Insulators and erection of anti creep with galvanised steel wire for conventional OHE under power block | — | — | — | 43,836 | |
| — | 16.00 | — | — | ||
| 32/11(a) (i) with out insulator and erection of 25 kV solid core cut-in insulator under power block | — | — | — | 11,376 | |
| — | 12.00 | — | — | ||
| 32/11(a) (ii) without insulator and erection of 25 kV solid core suspension insulator under power block | — | — | — | 5,928 | |
| — | 4.00 | — | — | ||
| 32/11(b) without insulator and erection of 25 kV Post Insulators under power block | — | — | — | 1,344 | |
| — | 15.00 | — | — | ||
| 32/15(a)Erection of 50 Sqmm of copper jumpers.(C-Jummper, F- jumpper, Anti theft jummper) under power block | — | — | — | 5,340 | |
| — | 8.00 | — | — | ||
| 32/15(b)"Erection of 160 or 105 sq.mm under power block Copper Jumper (Isolator Jumper, G-Jumper)" | — | — | — | 5,440 | |
| — | 1.00 | — | — | ||
| 32/15(e)Erection of Aluminium Jumper under power block | — | — | — | 342 | |
| — | 20.00 | — | — | ||
| 32/26(a)(ii)Erection of COPPER bus bar 18mm under power block | — | — | — | 2,920 | |
| — | 4.00 | — | — | ||
| 32/26(c)(i)"Erection of Solid Copper Busbar under power block Connector - 18 mm Bus Terminal (6310-1) " | — | — | — | 188 | |
| — | 2.00 | — | — | ||
| 32/26(c)(ii)"Erection of Solid Copper Busbar under power block Connector - 18 mm Bus Splice (6320) " | — | — | — | 94 | |
| — | 2.00 | — | — | ||
| 32/27(a)Erection of 25 kV/240 V, 5/10/25/50 KVA Auxiliary Transformer under power block | — | — | — | 14,468 | |
| — | 2.00 | — | — | ||
| 32/28Supply (without Insulators) and Erection of 25 kV Drop out fuse switch.for all oil/dry type L.T.Supply transformerss of all capacities | — | — | — | 1,126 | |
| — | 54.00 | — | — | ||
| 32/31(a)Transfer of Overhead Equipment from one Mast or Support to another, including removal of Cantilever Assembly from old Mast or Support under power block | — | — | — | 1,00,980 | |
| — | 26.00 | — | — | ||
| 32/31(b)Provision of an additional bracket assembly / assemblies on a mast or support. under power block | — | — | — | 60,216 | |
| Track | Kilometre | — | — | ||
| — | 0.40 | — | — | ||
| 32/31 (c) Dismantling of Overhead Equipment under power block | — | — | — | 5,582.8 | |
| — | 14.00 | — | — | ||
| 32/31(e)Splicing and Extension of Anchored OHE under power block | — | — | — | 35,812 | |
| — | 30.00 | — | — | ||
| Span | Each | — | — | ||
| 32/31(g)Slewing and Putting back of OHE in original position under power block | — | — | — | 68,580 | |
| — | 2.00 | — | — | ||
| 32/31(j)(ii)Dismantling of Cut-in Insulator under power block | — | — | — | 1,178 | |
| — | 12.00 | — | — | ||
| 32/31(k)(i)Dismantlement of OHE Mast or structure by cutting under power block | — | — | — | 36,744 | |
| — | 12.00 | — | — | ||
| 32/31(k)(ii)Dismantlement of upright of TTC's/portals by cutting under power block | — | — | — | 52,512 | |
| — | 7.00 | — | — | ||
| 32/31(l)(i)Retrieval of traction masts, main masts, of Switching Station, TTC uprights etc. under power block | — | — | — | 80,640 | |
| — | 10.00 | — | — | ||
| 32/31(n)Dismantlement of guy rod under power block | — | — | — | 5,240 | |
| — | 6.00 | — | — | ||
| 32/31(o)Releasing of Multiple Cantilever Crossarm cantilever assemblies where single cantilever assembly is leftover under power block | — | — | — | 3,144 | |
| — | 3.00 | — | — | ||
| 32/31(p)Dismantling of Droparms/Booms/Temporary masts under power block | — | — | — | 16,077 | |
| — | 1.00 | — | — | ||
| 32/31(q)Splicing and Extension of Feeder conductor under power block | — | — | — | 2,986 | |
| — | 12.00 | — | — | ||
| 32/31(r)Dismantling of Cantilever assemblies including insulators under power block | — | — | — | 5,760 | |
| — | 8.50 | — | — | ||
| 32/31(s)Dismantling of Fabricated Steel or Small Parts Steel (SPS) under power block | — | — | — | 6,026.5 | |
| — | 3.00 | — | — | ||
| 32/31(t)(i)Dismantling of a regulating equipment (Three pulley type) with counter weight assembly for conventional OHE under power block | — | — | — | 7,626 | |
| — | 4.00 | — | — | ||
| 32/31(t)(iii)Dismantling of anti creep with galv. Steel wire.or Cadmium Catenary wire under power block | — | — | — | 5,920 | |
| — | 28.00 | — | — | ||
| 32/31(t)(iv)Dismantling of all types of copper jumpers under power block | — | — | — | 3,920 | |
| — | 6.00 | — | — | ||
| 32/31(t)(v)Dismantling of Termination for Conventional type Overhead Equipment under power block | — | — | — | 3,090 | |
| — | 48.00 | — | — | ||
| Span | Each | — | — | ||
| 32/31(t)(ix)Re-adjustment of OHE Spans, including droppers under power block | — | — | — | 2,10,048 | |
| — | 10.00 | — | — | ||
| 34 (j)"Providing and Laying Pitching with Stone Boulders " | — | — | — | 66,590 | |
| — | 20.00 | — | — | ||
| 36(a)Unloading of all type of Steel Structures. | — | — | — | 2,800 | |
| — | 20.00 | — | — | ||
| 36(b)Loading of all type of Steel Structures. | — | — | — | 4,800 | |
| — | 1.00 | — | — | ||
| 37(a)Unloading of all type of Copper & Aluminum conductors. | — | — | — | 120 | |
| — | 1.00 | — | — | ||
| 37(b)Loading of all type of Copper & Aluminum conductors. | — | — | — | 120 | |
| — | 200.00 | — | — | ||
| 38"Transportation of OHE structures / Materials / Equipments" | — | — | — | 23,200 | |
| — | 50.00 | — | — | ||
| 40(a)"Supply of Number Plate (Enamel Type)" | — | — | — | 25,800 | |
| — | 50.00 | — | — | ||
| 40(a) Erection of Number Plate (Enamel Type) | — | — | — | 5,000 | |
| — | 3.00 | — | — | ||
| 40(b)Supply Number Plate (Retro Reflective Type) | — | — | — | 3,147 | |
| — | 3.00 | — | — | ||
| 40(b)Erection of Number Plate (Retro Reflective Type) | — | — | — | 447 | |
| — | 8.00 | — | — | ||
| 41(a)"Supply Retro-Reflective type DJ ON (CLOSE)/DJ OFF (OPEN)/ 500 m/250 m/Train-18/MEMU Neutral Section Boards" | — | — | — | 14,920 | |
| — | 8.00 | — | — | ||
| 41(a) Erection of Retro-Reflective type DJON (CLOSE)/DJ OFF (OPEN)/ 500 m/250 m/Train-18/MEMU Neutral Section Boards" | — | — | — | 1,432 | |
| — | 24.00 | — | — | ||
| 41(b)"Supply Enamel type Public Caution board" | — | — | — | 51,984 | |
| — | 24.00 | — | — | ||
| 41(b)"Erection of Enamel type Public Caution board" | — | — | — | 4,296 | |
| — | 10.00 | — | — | ||
| 41(c)"Supply Enamel type Staff Caution board " | — | — | — | 13,840 | |
| — | 10.00 | — | — | ||
| 41(c)" Erection of Enamel type Staff Caution board " | — | — | — | 1,790 | |
| — | 6.00 | — | — | ||
| 41(d)Supply Retro-Reflective Type Electric Engine Stop Board/Caution Unwired Turnout Board | — | — | — | 20,460 | |
| — | 6.00 | — | — | ||
| 41(d) Erection of Retro-Reflective Type Electric Engine Stop Board/Caution Unwired Turnout Board | — | — | — | 1,074 | |
| — | 8.00 | — | — | ||
| 41(e)"Supply Retro-Reflective Type Power Block Working Limit Board " | — | — | — | 10,272 | |
| — | 8.00 | — | — | ||
| 41(e) " Erection of Retro-Reflective Type Power Block Working Limit Board " | — | — | — | 1,432 | |
| — | 8.00 | — | — | ||
| 41(f)"Supply Enamel type Caution Clearance to OHE nearby Restricted Board" | — | — | — | 6,584 | |
| — | 8.00 | — | — | ||
| — | — | — | 20,496 | ||
| — | 8.00 | — | — | ||
| 41(g)"Erection of Retro-Reflective type Danger Board for Height Gauge " | — | — | — | 1,432 | |
| — | 4.00 | — | — | ||
| 41(h)"Supply Vitreous Enamelled 25 kV Danger Board with skull & bones for Overline Structure (OLS) and Auxiliary Transformer" | — | — | — | 1,408 | |
| — | 4.00 | — | — | ||
| 41(h)"Erection of Vitreous Enamelled 25 kV Danger Board with skull & bones for Overline Structure (OLS) and Auxiliary Transformer" | — | — | — | 716 | |
| — | 1.00 | — | — | ||
| 41(i)"Supply Enamel Protected Area Board" | — | — | — | 1,475 | |
| — | 1.00 | — | — | ||
| 41(i)" Erection of Enamel Protected Area Board" | — | — | — | 179 | |
| — | 4.00 | — | — | ||
| 41(j)"Supply Retro-Reflective Sigma Board" | — | — | — | 2,760 | |
| — | 4.00 | — | — | ||
| 41(j)" Erection of Retro-Reflective Sigma Board" | — | — | — | 716 | |
| — | 1.00 | — | — | ||
| 41(l)"Supply f set of Isolator operation OPEN/CLOSE boards" | — | — | — | 1,540 | |
| — | 1.00 | — | — | ||
| 41(l)"erection of set of Isolator operation OPEN/CLOSE boards" | — | — | — | 179 | |
| — | 31.00 | — | — | ||
| 42Supply Shock Treatment charts Tri - lingual English, Hindi and telugu (Laminated) | — | — | — | 88,722 | |
| — | 31.00 | — | — | ||
| 42 Erection of Shock Treatment charts Tri - lingual English, Hindi and telugu (Laminated) | — | — | — | 6,324 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111.pdf ACS 11
ATTACHMENT
FTenderDocumentSNFTripShedROB.pdf
ATTACHMENT
LISTOFSTANDARDDRAWINGSANDSPECIFICATIONS.pdf
ATTACHMENT
ACSsupto10_1.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
Similarnaturelatest.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].