Loading…
Loading…
Tender Value
₹8.7 Cr
EMD Value
₹17.4 L
Closing Date
16 Jul 2026, 6:00 pm
Addl. Chief Engineer PWD Zone - I Jodhpur
Addl. Chief Engineer PWD Zone - I Jodhpur
Widening and Strengthening Work of SH- 62 Nayagaon to Kot Diver (NH- 48) Road Km 0/0 to 7/0
2026_CEPWD_570314_16
NIT No 05 of 2026-27 ACE PWD Zone I Jodhpur
Open Tender
Civil Works - Roads
270 days
Pali
As per Tender documents
7 documents required · 7 mandatory
₹5,000
As per Tender documents
₹17.4 L
Yes
28 Jun 2026
28 Jun 2026
17 Jul 2026
28 Jun 2026
16 Jul 2026
28 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | 3.98 | Hac | 10,374 | ₹41,288.52 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202.By Mechanical Means:Bituminous Courses & Granular Courses | 444.15 | Cum | 69 | ₹30,646.35 |
| 3 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 5,322.64 | Cum | 20 | ₹1,06,452.8 |
| 4 | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 Note :- Deduct if excavated earth as per item No. 3.5 (ii) is used and pushed for filling in embankment. | 5,322.64 | Cum | 28 | ₹1,49,033.92 |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 17,321.55 | Cum | 25 | ₹4,33,038.75 |
| 6 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 17,321.55 | Cum | 44 | ₹7,62,148.2 |
| 7 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For Grading-II Material | 4,491.46 | Cum | 751 | ₹33,73,086.46 |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. By Mechanical Means with a lead of 1 Km. | 6,897.61 | Cum | 1,044 | ₹72,01,104.84 |
| 9 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 38,044 | Sqm | 28 | ₹10,65,232 |
| 10 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 38,044 | Sqm | 8.75 | ₹3,32,885 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.23 MB
Tendernotice_2.pdf
PDF • 3.77 MB
Tendernotice_3.pdf
PDF • 8.63 MB
BOQ_1017100.xls
BOQ • 0.37 MB
2Agreement01Jan2023_Pali_19.pdf
Tender Documents • 8.54 MB
Technical_BALI_Nayagaon.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid