Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance Accept |
| 2 | L2₹1.2 CrAccepted-Finance | ₹1.2 Cr | L2 | Accepted-Finance Accept |
| 3 | L3₹1.2 CrAccepted-Finance | ₹1.2 Cr | L3 | Accepted-Finance Accept |
| 4 | L4₹1.2 CrAccepted-Finance 243 293 JAIPUR TIRAHA SHAHPURA JAIPUR RAJASTHAN 303103 | JAIPUR | RAJASTHAN | 303103 | ₹1.2 Cr | L4 | Accepted-Finance Accept |
| 5 | L5₹1.2 CrAccepted-Finance A 7 62 SECTOR 15 ROHINI DELHI 110089 | NORTH WEST | DELHI | 110089 | ₹1.2 Cr | L5 | Accepted-Finance Accept |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
9 Apr 2026, 3:00 pmClosed
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
A/R and M/O to various road PWD division North West Road-1 under Sub division NWR-11 during 2025-26 and 2026-27. (SH Repair of Footpath, Drain and day to day misc work at various roads under Sub Division NWR-11 (Balance work)
2026_PWD_289534_1
127/EE/NWR-1/PWD/2025-26
Open Tender
Civil Works - Roads
540 days
EE, NWR-1, PWD, Mukarba Chowk, Delhi-110033
A/R and M/O to various road PWD division North West Road-1 under Sub division NWR-11 during 2025-26 and 2026-27. (SH Repair of Footpath, Drain and day to day misc work at various roads under Sub Division NWR-11 (Balance work)
11 documents required · 11 mandatory
₹0
₹3.8 L
27 Apr 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Thermo-Mechanically Treated bars of grade Fe-500D or more | - | Kg | 1 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand). | - | Cum | - | - | - |
| 3 | 12 mm cement plaster of mix :
1:4 (1 cement: 4 coarse sand) | - | Sqm | - | - | - |
| 4 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | Kg | 1 | - | - |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work | - | Sqm | - | - | - |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
(a) One or more coats on old work | - | Sqm | 1 | - | - |
| 7 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar | - | Cum | 1 | - | - |
| 8 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | - | Cum | 1 | - | - |
| 9 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). | - | Cum | - | - | - |
| 10 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | - | Metre | - | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.08 MB
BOQ_384544.xls
BOQ • 0.31 MB