Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC | ₹20.0 L | L1 | Accepted-AOC Low Rate Quoted |
| 2 | L2₹20.0 LRejected-Finance | ₹20.0 L | L2 | Rejected-Finance High Rate Quoted |
| Sl No | Description | Qty | Unit | Yuvaraj B L2 | P Dhayalan L1 |
|---|---|---|---|---|---|
| 1.00 | Open well excavation complying with relevent clauses of T.N.D.S.S well sinking and with lead up to 10 meters in hard Stiff clay, stiff block cotton soil, hard red earth, shales, murram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil etc., Complete. | 88.43 | m3 | 90 ₹7,958.7 | 88 ₹7,781.84 |
| 2.00 | Open well excavation complying with relevent clauses of T.N.D.S.S well sinking and with lead up to 10 meters in hard Stiff clay, stiff block cotton soil, hard red earth, shales, murram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil etc., Complete. | 88.43 | m3 | 204 ₹18,039.72 | 202 ₹17,862.86 |
| 3.00 | Open well excavation complying with relevent clauses of T.N.D.S.S well sinking and with lead up to 10 meters in Hard granite measured in solid including blasting and stacking etc., Complete.
5m to 6m - 3rd Depth | 63.86 | m3 | 1,465 ₹93,554.9 | 1,463.5 ₹93,459.11 |
| 4.00 | 6m to 8m - 4th Depth | 39.3 | m3 | 3,826 ₹1,50,361.8 | 3,824 ₹1,50,283.2 |
| 5.00 | 8m to 10m - 5th Depth | 39.3 | m3 | 4,782 ₹1,87,932.6 | 4,780 ₹1,87,854 |
| 6.00 | 10m to 12m - 6th Depth | 39.3 | m3 | 5,738 ₹2,25,503.4 | 5,736 ₹2,25,424.8 |
| 7.00 | 12m to 14m - 7th Depth | 39.3 | m3 | 5,738 ₹2,25,503.4 | 5,736 ₹2,25,424.8 |
| 8.00 | 12m to 14m - 7th Depth | 39.3 | m3 | 7,650 ₹1,50,322.5 | 7,648.5 ₹1,50,293.03 |
| 9.00 | 14m to 16m - 8th Depth | 19.65 | m3 | 5,285 ₹14,480.9 | 5,283 ₹14,475.42 |
| 10.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 2.74 | m3 | 91,875 ₹1,47,000 | 91,873 ₹1,46,996.8 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
26 Feb 2026, 5:00 pmClosed
BLOCK DEVELOPMENT OFFICER
BLOCK DEVELOPMENT OFFICE, CHEYYAR
Construction of New Openwell in New colony Puliyarampakkam Panchayat
2026_RDTN_664737_1
OPENWELL AT NEW COLONY
Open Tender
Civil Works
90 days
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
16 Jun 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
Open well excavation complying with relevent clauses of T.N.D.S.S well sinking and with lead up to 10 meters in hard Stiff clay, stiff block cotton soil, hard red earth, shales, murram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil etc., Complete.
Open well excavation complying with relevent clauses of T.N.D.S.S well sinking and with lead up to 10 meters in hard Stiff clay, stiff block cotton soil, hard red earth, shales, murram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil etc., Complete.
Open well excavation complying with relevent clauses of T.N.D.S.S well sinking and with lead up to 10 meters in Hard granite measured in solid including blasting and stacking etc., Complete. 5m to 6m - 3rd Depth
6m to 8m - 4th Depth
8m to 10m - 5th Depth
10m to 12m - 6th Depth
12m to 14m - 7th Depth
12m to 14m - 7th Depth
14m to 16m - 8th Depth
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle - Side Wall
Side Wall
Reinceforced Cement concrete 1 : 1.5 : 3 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Specials
Towards cost and supply of 5HP Motor and secials
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_798272.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid