| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | A VINOTH L1 | VENKADA BALASUBRAMANIAYN CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls | |||||
| 1.01 | Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs | 14.84 | m2 | 65 ₹964.6 Lowest | 65 ₹964.6 Lowest |
| 1.02 | Dismantling Plain Cement Concrete | 0.84 | m3 | 520 ₹436.8 Lowest | 520 ₹436.8 Lowest |
| 1.03 | Dismantling RCC by manual / by using deploying machineries | 0.43 | m3 | 4,610 ₹1,982.3 Lowest | 4,610 ₹1,982.3 Lowest |
| 1.04 | Dismantling RCC by manual / by using deploying machineries | 0.57 | m3 | 4,610 ₹2,627.7 Lowest | 4,610 ₹2,627.7 Lowest |
| 2.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 2.13 | m3 | 200 ₹426 Lowest | 200 ₹426 Lowest |
| 3.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 0.85 | m3 | 5,000 ₹4,250 Lowest | 5,000 ₹4,250 Lowest |
| 4.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 1.5 | m3 | 5,000 ₹7,500 Lowest | 5,000 ₹7,500 Lowest |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 6-12 mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by manual means | 1.5 | m3 | 6,000 ₹9,000 Lowest | 6,000 ₹9,000 Lowest |
| 6.00 | Supplying and laying of Interlocking Paver Block Stone 60mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers. | 1.22 | m2 | 650 ₹793 Lowest | 650 ₹793 Lowest |
Tender Value
₹4.3 L
EMD Value
₹4,300
Closing Date
18 Sept 2026, 11:00 amClosed
Executive Engineer
PWD Buildings C and M Division Sivagangai
Special Repairs to Revenue Divisional Office at Sivagangai in Sivagangai District.
2026_PWD_700259_1
3 2026 2027 EE B C M D SVG Dated 31.08.2026
Open Tender
Civil Works - Buildings
Lump-sum
90 days
Sivagangai
Refer the Tender Document
7 documents required · 7 mandatory
₹0
₹4,300
18 Sept 2026
2 Sept 2026
18 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls | |||||
| 1.01 | Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs | 1 | m2 | - | - |
| 1.02 | Dismantling Plain Cement Concrete | 1 | m3 | - | - |
| 1.03 | Dismantling RCC by manual / by using deploying machineries | 1 | m3 | - | - |
| 1.04 | Dismantling RCC by manual / by using deploying machineries | 1 | m3 | - | - |
| 2 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 1 | m3 | - | - |
| 3Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | |||||
| 4Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | |||||
| 5Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 6-12 mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by manual means | |||||
| 6 | Supplying and laying of Interlocking Paver Block Stone 60mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers. | 1 | m2 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
TDrdosivagangai.pdf
Tender Documents • 1.01 MB
BOQ_841731.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .