Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹90.3 LAccepted-AOC 17 NETHAJI ROAD MADURAI 625001 | MADURAI | TAMIL NADU | 625001 | 1 | Accepted-AOC Accept | |
| 2 | 2₹92.5 L+₹2.2 L (2.48%)Rejected-AOC PUDUKKOTTAI PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | 613301 | 2 | Rejected-AOC Reject |
Tender Value
₹1.1 L
EMD Value
₹94,000
Closing Date
3 May 2023, 3:00 pmClosed
Project Director
1st floor, DRDA, Theni
Strengthening of road from Amachiyapuram to Marikundu vilakku via Vaikkalpatti Km 0/0-3/350(R31)
2023_RDTN_307802_1
DIPR/2018/Tender/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹94,000
19 Jun 2023
27 Apr 2023
3 May 2023
27 Apr 2023
3 May 2023
27 Apr 2023
Amount
Clearing Scrub Jungle with uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all labour charges etc., complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Applying TACK COAT over BT surface at 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compacti
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Painting two coats on Concrete Surfaces Painting two coats including prime coat after filling the surface with synthetic enamel paint in all shades on new plastered/concrete surfaces as per drawing and technical specification clause 1701 of MORD.
Supplying and Fixing of Guard stone etc
Supplying and Fixing of KM stone etc 1.65x0.45x0.15
Supplying and Fixing of HM stone etc 0.75 x 0.23x0.10
Retro- Reflectarised Traffic Signs ( With definition board ) Type IV
60cm Equilatral Triangle Sign Board
80cm x 60cm Rectangular Board
Towords the charges for GI Name board
Providing CC Wearing Coat ( Sub Estimate - 1 ) @ Ch . 450m
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2M in light black cotton soil, hard stiff clay, stiff black cotton, hard red earth, shales, Muram, gravel stoney earth and etc., as per SS 20B.(TNBP SS No. 23 & 24)
Cement Concrete 1:4:8 (One cement four sand and Eight hard brocken stone) using 40MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Cement Concrete 1:2:4 (One cement four sand and Eight hard brocken stone) using 20MM. gauge hand brocken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed.
Construction of Un-Reinforced ,dowel jointed at expansion and Construction joint only,plain cement concrete pavement thickness as per design,over a prepared sub base,with 43 grade cement or any other type as per clause 1501.2.2 M30 (Grade),Coarse an
Supply and Fixing of Bitumen Pad
Providing CC Wearing Coat ( Sub Estimate - 2 ) @ Ch . 1570m
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Construction of Un-Reinforced ,dowel jointed at expansion and Construction joint only,plain cement concrete pavement thickness as per design,over a prepared sub base,with 43 grade cement or any other type as per clause 1501.2.2 M30 (Grade),Coarse an
Supply and Fixing of Bitumen Pad
Providing CC Wearing Coat ( Sub Estimate - 3 ) @ Ch . 3100m
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Construction of Un-Reinforced ,dowel jointed at expansion and Construction joint only,plain cement concrete pavement thickness as per design,over a prepared sub base,with 43 grade cement or any other type as per clause 1501.2.2 M30 (Grade),Coarse an
Supply and Fixing of Bitumen Pad
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
P Pandiaraj
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .