Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.3 L
EMD Value
₹4,580
Closing Date
14 Sept 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EX.Engineer irrrigation ompora budgam
EX.Engineer irrrigation ompora budgam
Construction of protection wall on Sonmai canal by laying of cement concrete wall on left side D/S steel bridge. Amount of work. Rs. 2.29 lacs (Including deptt supply)
2020_IFC_103433_3
enit29of092020
Open Tender
Civil Works
Item Wise
10 days
Budgam
Please refer Tender documents.
5 documents required · 5 mandatory
₹300
Yes
ExecutiveEngg ID ompora
₹4,580
Yes
15 Sept 2020
4 Sept 2020
15 Sept 2020
4 Sept 2020
14 Sept 2020
4 Sept 2020
270 days
Amount
Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10sqm on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed In: All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level.a)1:5:10 (1 cement : 5 coarse sand: 10 graded stone agg.40mm nominal size ) crushed.
b)1:3:6 (1 cement : 3 coarse sand: 6 graded stone agg.40mm nominal size ) crushed.
Centring & shuttering including structting propping etc and removal of form for:-a) Retaining walls, return walls,walls (any thickness) IncI attached pilasters buttresses, plinth and string courses fillets etc.
Carriage of Materials upto site of work by Mechanical transport including cost of loading unloading and stacking. a) 40mm agg. From Budgam Av 15 Km
b) 20mm agg from --do--
c)sand from Marva; av. 20km
d) cement from division store av. 15km
M/S AB AHAD NAJAR
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .