| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.8 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹65.4 Cr+₹8.6 Cr (15.1%)Admitted-Finance 16 EDEN GARDEN CHUNA BHATTI KOLAR ROAD BHOPAL | BHOPAL | MADHYA PRADESH | L2 | Admitted-Finance | |
| 3 | L3₹65.6 Cr+₹8.8 Cr (15.5%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹68.5 Cr+₹11.7 Cr (20.7%)Admitted-Finance 404 405 GOMATI APT 4TH FLOOR LAW COLLEGE SQ WHC RD DHARAMPETH NAGPUR | NAGPUR | MAHARASHTRA | 440001 | L4 | Admitted-Finance | |
| 5 | L5₹70.0 Cr+₹13.2 Cr (23.2%)Admitted-Finance R 25 RESHIMBAGH UMRED ROAD NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | 440003 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | saraswati construction co L7 | RPS INFRAPROJECTS PVT LTD L8 | J P Enterprises L9 | GOUR ROAD TAR COAT PRIVATE LIMITED L12 | Messers D C Gurbaxani L6 | Dristti Structural Engineering Pvt. Ltd. L1 | Rudranee Infastructure Ltd. L11 | ABHI ENGINEERING CORPORATION PVT LTD L4 | R. K. Chavan Infrstructure Pvt. Ltd. L10 | AK SHIVHARE INFRASTRUCTURE PVT LTD L2 | Khalatkar Construction Infra Private Limited L5 | Sunny Constructions L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick masonry in lime or cement mortar and stacking the materials as directed with all leads, lifts etc. ( As directed by Engineer-In-charge ) | 48.3 | Per Cubic Meter | 250 ₹12,075 | 300 ₹14,490 | 200 ₹9,660 | 300 ₹14,490 | 355 ₹17,146.5 | 65.07 ₹3,142.88 Lowest | 234 ₹11,302.2 | 200 ₹9,660 | 288.39 ₹13,929.24 | 290 ₹14,007 | 305 ₹14,731.5 | 256 ₹12,364.8 |
| 2.00 | Dismantling stone masonry in lime or cement mortar including stacking the materials as directed with all leads, lifts etc. ( As directed by Engineer-In-charge ) | 5 | Per Cubic Meter | 250 ₹1,250 | 300 ₹1,500 | 300 ₹1,500 | 350 ₹1,750 | 355 ₹1,775 | 108.54 ₹542.7 Lowest | 293 ₹1,465 | 250 ₹1,250 | 327.68 ₹1,638.4 | 290 ₹1,450 | 346 ₹1,730 | 291 ₹1,455 |
| 3.00 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. ( As directed by Engineer - In- charge ) | 40 | Per Cubic Meter | 600 ₹24,000 | 400 ₹16,000 | 800 ₹32,000 | 350 ₹14,000 | 890 ₹35,600 | 542.61 ₹21,704.4 | 837 ₹33,480 | 750 ₹30,000 | 801.79 ₹32,071.6 | 342 ₹13,680 Lowest | 847 ₹33,880 | 711 ₹28,440 |
| 4.00 | Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. As directed and stacking them within the specified lead as directed etc. complete. ( As directed by Engineer -In - charge ) | 500 | Per Cubic Meter | 1,250 ₹6,25,000 | 500 ₹2,50,000 | 1,000 ₹5,00,000 | 350 ₹1,75,000 | 1,340 ₹6,70,000 | 759.51 ₹3,79,755 | 1,055 ₹5,27,500 | 1,000 ₹5,00,000 | 1,250 ₹6,25,000 | 342 ₹1,71,000 Lowest | 1,321 ₹6,60,500 | 1,110 ₹5,55,000 |
| 5.10 | Cutting down trees including trunks and branches with girths stacking the materials neatly with all lifts and lead of 1000 m as directed and earth filling in the depression / pit if any.
a) Above 30 cm 60 cm girth | 15 | Per Number | 400 ₹6,000 | 1,000 ₹15,000 | 500 ₹7,500 | 100 ₹1,500 Lowest | 890 ₹13,350 | 542.61 ₹8,139.15 | 352 ₹5,280 | 300 ₹4,500 | 437.5 ₹6,562.5 | 193 ₹2,895 | 462 ₹6,930 | 388 ₹5,820 |
| 5.20 | b) Above 60 cm 90 cm girth | 15 | Per Number | 700 ₹10,500 | 1,500 ₹22,500 | 550 ₹8,250 | 100 ₹1,500 Lowest | 890 ₹13,350 | 868.14 ₹13,022.1 | 703 ₹10,545 | 450 ₹6,750 | 719.64 ₹10,794.6 | 348 ₹5,220 | 760 ₹11,400 | 638 ₹9,570 |
| 5.30 | c) Above 90 cm 180 cm girth | 15 | Per Number | 1,200 ₹18,000 | 4,000 ₹60,000 | 600 ₹9,000 | 100 ₹1,500 Lowest | 1,785 ₹26,775 | 1,627.65 ₹24,414.75 | 1,407 ₹21,105 | 1,000 ₹15,000 | 1,491.07 ₹22,366.05 | 671 ₹10,065 | 1,575 ₹23,625 | 1,323 ₹19,845 |
| 5.40 | d) Above 180 cm 270 cm girth | 15 | Per Number | 2,500 ₹37,500 | 7,500 ₹1,12,500 | 650 ₹9,750 | 100 ₹1,500 Lowest | 2,670 ₹40,050 | 2,170.26 ₹32,553.9 | 2,462 ₹36,930 | 2,500 ₹37,500 | 2,556.25 ₹38,343.75 | 1,267 ₹19,005 | 2,701 ₹40,515 | 2,269 ₹34,035 |
| 6.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a disposal outside the working area at the appropriate location for this purpose including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 12,000 | Per Square Meter | 11 ₹1,32,000 | 5 ₹60,000 | 29 ₹3,48,000 | 12 ₹1,44,000 | 9 ₹1,08,000 | 2.25 ₹27,000 Lowest | 6 ₹72,000 | 6 ₹72,000 | 10.71 ₹1,28,520 | 3 ₹36,000 | 9 ₹1,08,000 | 15 ₹1,80,000 |
| 7.00 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. Complete ( As directed by Engineer-In-charge ) | 27,000 | Per Square Meter | 25 ₹6,75,000 | 50 ₹13,50,000 | 35 ₹9,45,000 | 12.5 ₹3,37,500 | 44 ₹11,88,000 | 54.36 ₹14,67,720 | 30 ₹8,10,000 | 35 ₹9,45,000 | 38.39 ₹10,36,530 | 5 ₹1,35,000 Lowest | 41 ₹11,07,000 | 40 ₹10,80,000 |
Tender Value
₹90.4 Cr
Closing Date
18 May 2021, 5:00 pmClosed
EXECUTIVE ENGINEER
Public Works Department Bunglow No.39.1 Civil Lines Nagpur.440 001
Construction of Cement Concrete Road White Topping With Footpath Cycle Track and Improvement to drainage From Rahate Colony To Khapri ROB Km 2.200 To 8.200 Old NH 44 Nagpur in the State Of Maharashtra.
2021_MoRTH_624828_1
NIT-26/2020-21/1
Open Tender
Civil Works
Item Rate
450 days
Khapri Nagpur
Construction of Cement Concrete Road White Topping With Footpath Cycle Track and Improvement to drainage From Rahate Colony To Khapri ROB Km 2.200 To 8.200 Old NH 44 Nagpur in the State Of Maharashtra.
5 documents required · 5 mandatory
₹30,000
GM MoRTH
Exempted
Office of the Secretary National Highway Public Wo
9 Jul 2021
30 Mar 2021
19 May 2021
30 Mar 2021
18 May 2021
9 Apr 2021
5 Apr 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick masonry in lime or cement mortar and stacking the materials as directed with all leads, lifts etc. ( As directed by Engineer-In-charge ) | 48.3 | Per Cubic Meter | - | - |
| 2 | Dismantling stone masonry in lime or cement mortar including stacking the materials as directed with all leads, lifts etc. ( As directed by Engineer-In-charge ) | 5 | Per Cubic Meter | - | - |
| 3 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. ( As directed by Engineer - In- charge ) | 40 | Per Cubic Meter | - | - |
| 4 | Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. As directed and stacking them within the specified lead as directed etc. complete. ( As directed by Engineer -In - charge ) | 500 | Per Cubic Meter | - | - |
| 5.1 | Cutting down trees including trunks and branches with girths stacking the materials neatly with all lifts and lead of 1000 m as directed and earth filling in the depression / pit if any.
a) Above 30 cm 60 cm girth | 15 | Per Number | - | - |
| 5.2 | b) Above 60 cm 90 cm girth | 15 | Per Number | - | - |
| 5.3 | c) Above 90 cm 180 cm girth | 15 | Per Number | - | - |
| 5.4 | d) Above 180 cm 270 cm girth | 15 | Per Number | - | - |
| 6 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a disposal outside the working area at the appropriate location for this purpose including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 12,000 | Per Square Meter | - | - |
| 7 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. Complete ( As directed by Engineer-In-charge ) | 27,000 | Per Square Meter | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.14 MB
SBDPARTIIWardhaRoadFinal.pdf
Tender Documents • 1.56 MB
SBDPARTIwardharoadFinal.pdf
Tender Documents • 1.44 MB
BOQ_657289.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .