Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
28 May 2021, 1:00 pmClosed
SE ETC I MORADABAD
220 KV S/S CAMPUS MAJHOLA MORADABAD
LOADING / CARRIAGE, UNLOADING AND REPLACEMENT OF GASKET 40 MVA TRANSFORMER FROM 132 KV SUB-STATION JATTARI (UNDER ETD-I ALIGARH) TO 220 KV SUB-STATION SAMBHAL UNDER ETD-SAMBHAL
2021_UPTCL_571899_2
E-T-142/ ETCM/2020-2021
Open Tender
Electrical Works
Fixed-rate
90 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE ETC MORADABAD
₹6,000
3 Jun 2021
29 Apr 2021
28 May 2021
29 Apr 2021
28 May 2021
29 Apr 2021
Amount
The following works are to be carried out at 220KV S/S, Sambhal under ETD- Sambhal.
Partly dismantling of 40 MVA T/F for carriage of main tank at 132 KV S/S Jattari.
Shifting/ Dragging of oil filled 40 MVA Transformer from existing place to near loading place at 132 KV Sub-Station Jattari Distance up to 20 Mtr.
Loading of 40 MVA T/F main tank along with accessories, making the wooden sleeper plate from jacking the T/F tank up to trailer height placing the rail under T/F tank and shifted up on trailer, removed the rail under T/F tank and proper tightening the main tank with trailer bed with the help of steel rope and turn buckle.
Packing of HV/LV/N Bushing of Transformer.
Carriage of 40 MVA T/F tank from 132 KV Sub-Station Jattari to 220 KV Sub-Station Sambhal along with all accessories by Pvt. Truck / Trailer. Distance about 200 Km.
Unloading of main tank of 40 MVA Transformer loaded on Trailer jacking the tank for packing the rail under the T/F tank and shifting it of wooden to plate form, Removing the rail under the T/F tank on wooden sleeper, lowering the tank towards ground by slowly and removing the wooden sleeper under the tank and unloading of various Transformer accessories of above 40 MVA T/F like oil filled drums, bushing conservator tank, cooling fan etc. from Track/ Trailer at site at 220 KV S/S Sambhal.
Replacement of gasket of radiator / Bushing / pipe line only open part. except Top Cover of Transformer by providing and fixing of new gasket as per existing size made of rubberized cork sheet Kotika / Turborze brand grade.
Cleaning of core and winding by hot Transformer oil and removal of slug from bottom.
Overhauling of diverter switch after removing of oil from its chamber filling the fresh centrifuged Transformer oil and its circulation as per norm of Transformer.
R.K.ENGINEERING SERVICES
A.K.S. POWER SOLUTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .