Tender Value
₹31.0 L
EMD Value
₹61,900
Closing Date
9 Oct 2026, 11:00 am
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (M & P)
Above/Below/Par
TECHNICAL
12 conditions · 1 needing a document upload
Tenderer must have to submit valid Electrical Contractor licenseasperIndian Electricity Rules for the respective category ofworks issuedbyGovernment Electrical License Board on orbefore the closing dateoftender. Copy of the electricalcontractor license should besubmittedalong with the tenderoffer, otherwise, the tender will besummarilyrejected
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
51 conditions · 5 needing a document upload
Whether the cost of earnest money deposited
Migration to GST regime - Special Tender Conditions: The rates should clearly indicate the rate of applicable duties and taxes included in the prices quoted by them. Any variation in tax structure/ rate due to introduction of GST, shall be dealt with under Statutory Variation Clause. It should be ensure that bidders/tenderers are GST compliant and quoted tax structure/rates are as per GST Law.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Contractor should submit the GSTIN number and same should be mentioned in the bills along with a copy of GSTIN registration certificate while submitting the bills to accounts for audit and payment, As GST is scheduled to implemented wef 01.07.2017. Without GSTN, no bill will be accepted w.e.f. 01.07.2017
From 01.07.2017 GST has been implemented but the detail guideline is still not clear. Hence, new tax structure on materials and labour will be applicable to both Railway & contractor after getting proper notification
Payment of Earnest Money deposit (EMD) , in respect of e- tendering,should be accepted through net banking or online payment gateway only
Provision of electrical supply to 13 Hot Axle Box Detector (HABD) Systems under Lumding Division.
EL-LM-26-27-29~NFR
EL-LM-26-27-29
Open
Works - General
90 Days
Hojai, Assam
₹0
₹61,900
16 Sept 2026
16 Sept 2026
25 Sept 2026
200 items across 13 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 32,772.44 | ||
| — | 50.00 | — | — | ||
| Laying, fitting, fixing and commissioning of LT/HT XLPE insulated, armoured power cables with aluminium conductors of different sizes, suitable for the required voltage grade, including proper dressing, clamping and securing of cables partly along poles/structures and partly in ground cable trenches as per site requirement. The work shall include excavation of trenches, sand bedding, protective covering with bricks/tiles, refilling and compaction, ensuring proper route marking and safety precautions as per relevant IS standards (IS:1255/IS:7098 or latest). It also includes loading, unloading, safe transportation and carrying of cables to site by contractor's own arrangement as directed by the Engineer-in-Charge. Termination and jointing shall be carried out using approved kits with proper crimping, sealing and ferruling to ensure reliable performance. Necessary testing such as insulation resistance, continuity and phase identification shall be done before commissioning, and the entire work shall be executed as per relevant IS specifications and instructions of the Engineer-in-Charge at site. | — | — | — | 2,185.5 | |
| — | 50.00 | — | — | ||
| Excavation of cable trench 1.0 m x 0.5 m below the GL with laying of armored cableand refilling the same by supply of Brick, Sand and Soil after digging the earth asper direction of Engineer at site & connection of armored Cable by supply and fixingof crimping lugs etc. The entire excavation of cable is to doneas per drawing no.PCEE/ELG/DRG/2024/2, dt. 04.10.2024 | — | — | — | 6,503.5 | |
| — | 50.00 | — | — | ||
| Supply, fixing, laying & clamping of 40 mm dia HDPE pipe working pressure 6 kgf per sq.cm for partly underground & partly through open air for protection of UG cable . The work shall include supply of all necessary accessories such as HDPE sockets, bends, couplers, tees, reducers, end caps, clamps, nuts, bolts, washers and supporting arrangements as required at site. The pipe shall be laid above ground or mounted on RCC wall/structure as per site requirement. The pipe shall be properly aligned, cut to required length and joined using appropriate jointing method (compression fitting / butt fusion / electrofusion as applicable) to ensure leak-proof and rigid joints. Proper MS/GI clamps with suitable spacing, anchor fasteners, and supporting brackets shall be provided for fixing the pipe on wall or structure. All cutting, jointing, fitting, alignment and fixing works shall be carried out carefully to avoid damage to the pipe. The entire work shall be executed as per the direction of Engineer-in-Charge | — | — | — | 2,109.5 | |
| — | 10.00 | — | — | ||
| — | 2.00 | — | — | ||
| — | 1.00 | — | — | ||
| — | 1.00 | — | — | ||
| Supply, fixing, testing and commissioning of 2 Way SPN DB Conforming to IS 8623-1 & 3,IEC 61439-1 & 3, IK 08 single door, in CRCA Sheet steel, RAL 9003,Powder Coated Board IP43 with i) 16 amp, 100mA sensitivity DP RCBO, AC type Conforming to IEC 61009-1, IS 12640-2, EN 61009-1, Short circuit Breaking Capacity - 10kA=1 no. The SPN MCB DB whole arrangement should be properly concealed on wall and earthing properly as per direction of engineer in charge at site. | — | — | — | 7,895 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
EL-LM-26-27-29.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .