Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC 29 PUCCA HOUSE MAIN ROAD MAHAGAMA GODDA 814154 JHARKHAND INDIA | GODDA | JHARKHAND | 814154 | ₹2.6 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹2.8 LRejected-Finance 0 VILLAGE BARKHERA BASANTPUR DAYANATHPUR KANTH MORADABAD UTTAR PRADESH 244001 UDYAM UP 59 0004726 | MORADABAD | UTTAR PRADESH | 244001 | ₹2.8 L | L2 | Rejected-Finance Rejected being L2 |
| 3 | L3₹3.0 LRejected-Finance 54 PUCCA HOUSE PIRPAINTI ROAD GODDA JHARKHAND INDIA | GODDA | JHARKHAND | 814133 | ₹3.0 L | L3 | Rejected-Finance Rejected being L3 |
| Sl No | Description | Qty | Unit | M/S G.K ENTERPRISES L2 | M/S JUGA WELDING WORKS L1 | M/s M K Engineering Works L3 |
|---|---|---|---|---|---|---|
| 1.00 | Repairing of Brake Assembly | 6 | shifts | 4,000 ₹24,000 | 3,755 ₹22,530 | 4,950 ₹29,700 |
| 2.00 | Repairing of Hoist Cylinder Tube as per OEM standard | 1 | no. | 38,500 ₹38,500 | 37,350 ₹37,350 | 39,600 ₹39,600 |
| 3.00 | Repairing of Telescoping Piston Rod | 1 | no. | 42,950 ₹42,950 | 41,800 ₹41,800 | 43,500 ₹43,500 |
| 4.00 | Fitting of standard size Bushing at both end | 1 | no. | 27,950 ₹27,950 | 26,900 ₹26,900 | 29,500 ₹29,500 |
| 5.00 | Other works like dismantling, assembling | 1 | no. | 13,500 ₹13,500 | 12,450 ₹12,450 | 14,900 ₹14,900 |
| 6.00 | Repairing of Rear Suspension Tube as per OEM standard | 1 | no. | 20,500 ₹20,500 | 18,950 ₹18,950 | 21,900 ₹21,900 |
| 7.00 | Repairing of Suspension Piston Rod | 1 | no. | 22,500 ₹22,500 | 21,250 ₹21,250 | 24,200 ₹24,200 |
| 8.00 | Fitting of standard size Bushing at both end | 1 | no. | 22,700 ₹22,700 | 21,300 ₹21,300 | 24,250 ₹24,250 |
| 9.00 | Other works like dismantling, assembling | 1 | no. | 12,500 ₹12,500 | 10,350 ₹10,350 | 14,250 ₹14,250 |
| 10.00 | Material Cost | 1 | no. | 13,585 ₹13,585 | 11,000 ₹11,000 | 14,520 ₹14,520 |
Tender Value
₹2.6 L
EMD Value
₹3,300
Closing Date
29 Dec 2025, 9:00 amClosed
Area Engineer(Excv)
Rajmahal Area, Dhankunda, PO-Bara Simra, Dis-Godda
REPAIRING OF 01 ONE NO FAILED HOIST CYLINDER ASSEMBLY AND ITS BRACKET AND 01 ONE NO FAILED REAR SUSPENSION ASSEMBLY OF CAT 100TE DUMPER NO PT91 OF RAJMAHAL PROJECT
2025_ECL_349676_1
ECL/RJML/AE(EXCV)/ 25-26/E-TEN/066 dated 23.11.2025
Open Tender
Excavation Department Work
20 days
Rajmahal Area, Dhankunda, PO-Bara Simra, Dis-Godda
As per NIT
2 documents required · 2 mandatory
₹3,300
26 Apr 2026
20 Dec 2025
30 Dec 2025
20 Dec 2025
29 Dec 2025
20 Dec 2025
20 Dec 2025 - 26 Dec 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: AE(EXCV), Rajmahal Area
Name of Work: REPAIRING OF 01 (ONE) NO.FAILED HOIST CYLINDER ASSEMBLY & ITS BRACKET AND 01 (ONE) NO.FAILED REAR SUSPENSION ASSEMBLY OF CAT 100TE.DUMPER NO.PT-91 OF RAJMAHAL PROJECT
Contract No: ECL/RJML/AE(EXCV)/25-26/E-Ten/066 Date: 23/11/2025
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate BASIC RATE of Material In Figures To be entered by the Bidder Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P BASIC RATE of Labour charge In Figures To be entered by the Bidder Rs. P Total Rate (6+7) Rs. P Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Repairing of Brake Assembly 6 shifts 10 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
2 Repairing of Hoist Cylinder Tube as per OEM standard 1 no. 11 Excess(+) Full Conversion INR
3 Repairing of Telescoping Piston Rod 1 no. 12 Excess(+) Full Conversion INR
4 Fitting of standard size Bushing at both end 1 no. 13 Excess(+) Full Conversion INR
5 Other works like dismantling, assembling 1 no. 14 Excess(+) Full Conversion INR
6 Repairing of Rear Suspension Tube as per OEM standard 1 no. 15 Excess(+) Full Conversion INR
7 Repairing of Suspension Piston Rod 1 no. 16 Excess(+) Full Conversion INR
8 Fitting of standard size Bushing at both end 1 no. 17 Excess(+) Full Conversion INR
9 Other works like dismantling, assembling 1 no. 12 Excess(+) Full Conversion INR
10 Material Cost 1 no. 11 Excess(+) Full Conversion INR
11 GST @18% on all above item6 1 No 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_362421.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid