Loading…
Loading…
Tender Value
₹1.8 L
EMD Value
₹3,614
Closing Date
6 Jun 2026, 6:00 pmDue tomorrow
University Engineer (In charge)
Golden jubilee building, Burdwan
Construction of a Cycle stand for Geography Dept. B.U
2026_BU_1025452_1
BU/ENGG/01/2026-27
Open Tender
CIVIL WORKS
30 days
PURBA BARDHAMAN
Please refer Tender documents.
3 documents required · 3 mandatory
₹250
Finance Officer, The University of Burdwan
₹3,614
26 May 2026
26 May 2026
9 Jun 2026
26 May 2026
6 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Construction of a Cycle stand for Geography Dept. Golapbag B.U | ||||||
| 1.01 | Surface Dressing of the ground in any kind of soil
including removing vegetation inequalities not
exceeding 15 cm depth and disposal of the rubbish
within a lead upto 75 m as directed. | 40 | SqM | 10 | ₹400 | BI01010001010000000000000515BI0100001113 |
| 2 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. | 1.5 | CuM | 5,416.04 | ₹8,124.06 | BI01010001010000000000000515BI0100001114 |
| 3 | Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (upto roof of ground floor) --In ground floor | 5 | SqM | 328 | ₹1,640 | BI01010001010000000000000515BI0100001115 |
| 4 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups,binders etc. including supply of rods, initial straightening and removal of loose rust cutting to requisite length, hooking and bending to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction.-- G.Fl | 0.04 | M.T | 54,547.65 | ₹2,181.91 | BI01010001010000000000000515BI0100001116 |
| 5 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 8 | SqM | 656.93 | ₹5,255.44 | BI01010001010000000000000515BI0100001117 |
| 5.01 | Brick work with 1st. class bricks in cement morter (6:1) In foundation and plinth | 2 | CuM | 4,775 | ₹9,550 | BI01010001010000000000000515BI0100001118 |
| 6 | Plaster to wall ceilling with sand cement morter (6:1) 20mm thick plaster | 5 | SqM | 152 | ₹760 | BI01010001010000000000000515BI0100001119 |
| 7 | Neat cement punning about 1.5mm thick . | 5 | SqM | 34 | ₹170 | BI01010001010000000000000515BI0100001120 |
| 8 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. | 3 | CuM | 166 | ₹498 | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
tenderform.pdf
Tender Documents • 0.12 MB
BOQ_2519845.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid