| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹36.4 LAccepted-AOC 1ST 2ND FLOOR PLOT NO 13 C 13 3 RAMA ROAD SIDE INDUSTRIAL AREA NAJAFGARH ROAD DELHI 110015 INDIA | WEST | DELHI | 110015 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹38.5 L+₹2.1 L (5.66%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹44.4 L+₹8.0 L (22.1%)Rejected-Finance | L-3 | Rejected-Finance L-3 | |
| 4 | L-4₹48.9 L+₹12.5 L (34.3%)Rejected-Finance 146 CP COLONY 7 NO CHOURAHA KALPANA NAGAR MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | L-4 | Rejected-Finance L-4 |
Tender Value
₹72.6 L
EMD Value
₹1.5 L
Closing Date
30 Jul 2024, 4:00 pmClosed
SM (E-E)
ATS COMPLEX, AIRPORTS AUTHORITY OF INDIA, AURANGABAD AIRPORT
Provision of ALCMS system for GLF at Aurangabad Airport including AICMC for 5 years
2024_AAI_200766_1
AAI/AU/Engg(E)/e NIT 01/2024 25
Open Tender
Electrical Works
Item Rate
120 days
AURANGABAD AIRPORT
As per NIT and Tender documents
11 documents required · 11 mandatory
₹1,180
₹1.5 L
8 Feb 2025
10 Jul 2024
31 Jul 2024
10 Jul 2024
30 Jul 2024
10 Jul 2024
10 Jul 2024 - 17 Jul 2024
Amount
Design, supply, installation, testing & commissioning of Airfield Lighting Control & Monitoring System (ALCMS), Type 'L 890 BB' to the requirements of FAA Advisory Circular No. AC 150/5345 - 56B (Current edition) and additional circuits/ mechanisms/ interfaces for control & monitoring of constant current regulators (CCRs) & fixed circuits such as Landing - H, Wind cones, Apron High Mast flood lights, Beacon lights etc., as mentioned in Annexure-1, to make them compatible with ALCMS, Data & Power Cabling, Earthing etc., including spare PLC and In/Out modules, all hardware and software, licenses & other items as required for successful operation of the system in line with the scope of work, details of equipments, equipments specification, performance criteria etc., complete as required. Two vault processor should be provided both running in parallel for redundancy in operation etc as required complete as per site requirement and tender specifications.
Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required in the existing RCC/HUME/metal pipe/ masonry duct 63 mm dia (OD-63 mm & ID-51 mm nominal)
Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. on wall surface/cable tray, etc. with necessary Clamps at required intervals complete as required. 63 mm dia (OD-63 mm & ID-51 mm nominal) (clamped with 1 mm thick saddle)
Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc.direct in ground (75 cm below ground level) including excavation and refilling the trench but excluding sand cushioning and protective covering etc., complete as required. 63 mm dia (OD-63 mm & ID-51 mm nominal)
Supply and laying of Single mode 12 core, armoured Optic Fibre Cable (OFC) (ISI marked) conforming to ITU-T G.652 and IEC- 60794 with up to date amendments, etc., complete as required. through existing RCC/HUME/metal pipe/HDPE/ masonry duct.
Supplying of 12C x 2.5 Sq. mm copper control cable 1.1 KV grade PVC insulated & sheathed with bare annealed copper conductor as per IS:694:1990 with upto date amendments and make as per approved make list as required.
Laying and fixing of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size on wall surface/cable tray as required. Upto 35 sq. mm (clamped with 1mm thick saddle)
SH-II :- AICMC of ALCMS All inclusive comprehensive maintenance of complete ALCMS & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective equipment manufacturers and instructions of engineer- incharge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. First Year (after Completion of one year DLP)
Second Year (after Completion of one year DLP)
Third Year (after Completion of one year DLP)
Fourth Year (after Completion of one year DLP)
Fifth Year (after Completion of one year DLP)
NASU SYSTEMS
SAURABH ENTERPRISES
Manish Electricals
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .