| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC | ₹14.8 L | L1 | Accepted-AOC Quoted less than Tender Value |
| 2 | L2₹14.8 LRejected-AOC | ₹14.8 L | L2 | Rejected-AOC Quoted more than Tender Value |
| 3 | L3₹16.2 LRejected-AOC S A | ₹16.2 L | L3 | Rejected-AOC Quoted more than Tender Value |
| Sl No | Description | Qty | Unit | S A Srinivasan L3 | BEEMJI ENTERPRISE L2 | K.Sethupathi L1 |
|---|---|---|---|---|---|---|
| 1.00Vellore District Strenthening the Road from Kottaiyur to Vallandaramam Pallakollai Road Via Erikodi in Vasanthandai Panchayat in Anaicut Block Union General Fund 2025 -2026 Package no 19 | ||||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete | 432 | sqm | 20 ₹8,640 | 10 ₹4,320 | 4.75 ₹2,052 |
| 3.00 | Picking and Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 337.5 | sqm | 50 ₹16,875 | 200 ₹67,500 | 19.95 ₹6,733.13 |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 16.2 | cum | 450 ₹7,290 | 150 ₹2,430 | 320.15 ₹5,186.43 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete | 126.57 | cum | 2,700 ₹3.4 L | 2,000 ₹2.5 L | 2,519.41 ₹3.2 L |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete | 1,012.5 | sqm | 90 ₹91,125 | 70 ₹70,875 | 80.6 ₹81,607.50 |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete | 1,012.5 | sqm | 44 ₹44,550 | 15 ₹15,187.50 | 18.65 ₹18,883.13 |
| 8.00 | Providing and laying 50mm Compacted thick Bituminous macadam using 26.50-11.2mmgradedmetaland 0.10cum of13.20-2.36mm grade metal with34.04kgs ofVG30 /VG40 and 2.96Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMPsite, heating th bitumen and aggregate to requiredtemperature andmixing them in required temperature in centra hot mix plant 20-30 toncapacity, conveying themix by tipper trucks to paver site, spreading for etc Complete | 50.62 | cum | 9,158.13 ₹4.6 L | 10,000 ₹5.1 L | 8,700.22 ₹4.4 L |
| 9.00 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 25.32 | cum | 11,700 ₹3.0 L | 9,950 ₹2.5 L | 10,990.3 ₹2.8 L |
| 10.00HARD BED - Sub Estimate | ||||||
Tender Value
Refer Docs
EMD Value
₹31,500
Closing Date
27 Feb 2026, 3:00 pmClosed
The Block Development Office Anaicut
The Block Development Office Anaicut
Vellore District Strenthening the Road from Kottaiyur to Vallandaramam Pallakollai Road Via Erikodi in Vasanthandai Panchayat in Anaicut Block Union General Fund 2025 -2026 Package no 19
2026_RDTN_663436_1
A2/2589/2024
Open Tender
Civil Works
180 days
The Block Development Office Anaicut
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹31,500
17 Mar 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
Vellore District Strenthening the Road from Kottaiyur to Vallandaramam Pallakollai Road Via Erikodi in Vasanthandai Panchayat in Anaicut Block Union General Fund 2025 -2026 Package no 19
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking and Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying 50mm Compacted thick Bituminous macadam using 26.50-11.2mmgradedmetaland 0.10cum of13.20-2.36mm grade metal with34.04kgs ofVG30 /VG40 and 2.96Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMPsite, heating th bitumen and aggregate to requiredtemperature andmixing them in required temperature in centra hot mix plant 20-30 toncapacity, conveying themix by tipper trucks to paver site, spreading for etc Complete
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
HARD BED - Sub Estimate
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc complete
Construction of un-reinforced dowel jointed at expansion and Construction joint only plain Cement Concrete pavement thickness as per design over a prepared sub bade with 43grade cement or any other as per Clause 1501.2.2 M30 (Grade) Coarse for etc Complete
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_796494.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.92 MB
Tendernotice_2.pdf
PDF • 0.38 MB
BOQ_796494.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid