Loading…
Loading…
Tender Value
₹15.0 L
EMD Value
₹18,000
Closing Date
13 Jul 2026, 5:00 pm5d left
Executive Engineer Works Department ZP Ratnagiri
Dr.Babasaheb Ambedkar Bhavan Ground Floor Executive Engineer Works Department Ratnagiri ZP Ratnagiri.
Strengthening Asphalting and Protective wall Of Isavali Revatewadi main road to Ganpati Viserjan road. Tal Lanja For the year 2025 26
2026_RATNA_1312049_3
RZP/WD-Ratnagiri/E-Ten Un EMP ENGR-05/2026-27
Open Tender
Civil Works - Roads
180 days
Lanja
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹18,000
29 Jun 2026
29 Jun 2026
15 Jul 2026
29 Jun 2026
13 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No 1) Excavation for roadway in earth soil of all sorts, sand gravel or murrum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m.and spreading for embankment or stacking as directed. S. S. R. Item No.2.13+10% | 93.7 | Cmt. | 130.9 | ₹12,265.33 |
| 2 | Excavation for foundation in hard rock by chiselling and wedging or line drilling including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete.
a) Upto 1.50m lift Normal Rate
b) 1.50m to 3.00m lift, Add 10%
c) 3.00m to 4.50m lift, Add 20%
d) 4.50m to 6.0m lift, Add 30% | 13.95 | Cmt. | 1,560.9 | ₹21,774.56 |
| 3 | Item No 3) Supplying 60 mm lat stone metal at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken).S. S. R. Item No.50.56+10% | 196.42 | Cmt. | 1,274.64 | ₹2,50,364.79 |
| 4 | Item No 4) Supplying soft murrum at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken).S. S. R. Item No.50.57+10% | 1 | Cmt. | - | - |
| 5 | Item No 5) Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge .S.S.R.Item No. 50.58 +10% | 196.42 | Cmt. | 93.5 | ₹18,365.27 |
| 6 | Item No 6) Supplying hard murum/soft murrum gravel or kankar for side width complete. S. S. R. Item No. 2.29b | 68.11 | Cmt. | 86.9 | ₹5,918.76 |
| 7 | Item No 7 )Compacting for 60mm Laterite stone Metal Layers with Power Roller including | 1,584 | Cmt. | 17.6 | ₹27,878.4 |
| 8 | Item No 9) Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 100% crusher broken metal with conical crusher plant heating and spraying the bitumen of specified grade @ 1.75 kg/sqm, spreading 12mm.size chips compacting with static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) Item No. 3.37b | 1,584 | Smt. | 272.38 | ₹4,31,449.92 |
| 9 | Item No 11) Providing 20mm Thick Primix bituminous carpet including, supplying all materials preparing and celaning the base, heating bitumen applying tack coat at specified rate, Mixing hot bitumen and chips, laying the carpet layer and compacting etc DS | 1,584 | Smt. | 196.4 | ₹3,11,097.6 |
| 10 | Item No 12) Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) SSR item no 4.01 | 1,584 | Smt. | 88.78 | ₹1,40,627.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
Tendernotice_2.pdf
PDF • 0.19 MB
B1isavali.pdf
Tender Documents • 2.04 MB
BOQ_2250305.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid