Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.5 LAccepted-Finance VILL KHARLA P O DHARARA TEHSIL TIKKAR SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 171001 | ₹3.5 L | L-1 | Accepted-Finance 1 |
| 2 | L-2₹3.6 LRejected-Finance | ₹3.6 L | L-2 | Rejected-Finance 2 |
Tender Value
₹3.5 L
EMD Value
₹7,040
Closing Date
2 Apr 2026, 6:00 pmClosed
Executive Engineer
HPPWD Rohru
Restoration of Snow rain damage on various road under Tikkar Sub Division Khadrala Section SH Hiring of JCb for removal of snow slips dressing of road burms filling depression clearance of drain and culvert
2026_PWD_132459_7
28821-28920 dated 19-3-26
Open Tender
Civil Works - Roads
120 days
Rohru
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
₹7,040
9 Jun 2026
25 Mar 2026
3 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Hiring of JCB (Excactor cum loader)front end loader 0.50cum/ hour including POL charges shifting charge and other ancillay equipments as required at site of work for removal of slips in all hegiths and all kinds of soils such as kankar moorum shingle boulders decomposed or soft variety of soil such a spade work pick work jumer work soft rock hard rock including their intermediate classification of soil including mechnacial transportion of necessary .The disposal of this undervecable materials has to be done in the acquired width of the road to avoid the damage to the properties of the people or in case any damage took place the contractor shall be liable for its .All salvaged materils such as qurried stone shall belong to the department and manikumum useful quantity of stones from removal of slips shall be to be neatly stacked along road side on road berms minium 30.00 cubice metre of earth work shall be done by the machine in one hours other wise number of hours shall be reduced accordingly.The work shall have to be carried out as per ministry of transport and as per instruction of the Engineer in charge including all leads and lifts. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.87 MB
SBD7.pdf
Tender Documents • 2.62 MB
BOQ_195883.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid