| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Finance H NO 36 F SIMOLDA WADA REVORA BARDEZ GOA | SOUTH GOA | GOA | 403712 | -1.00% | ₹6.8 L | L1 | Admitted-Finance |
Tender Value
₹6.8 L
EMD Value
₹13,644
Closing Date
20 May 2026, 1:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Civil Div XVIII Aquem Margao Goa
Rennovation of control room of 33/11 KV Kadamaba sub station Vasco
2026_ED_28954_1
TN-01(26-27)/ED/XVIII/103 dated 30/04/2026
Open Tender
Civil Works
Percentage
60 days
33/11 KV Kadamba sub stationVasco
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹13,644
15 Jun 2026
30 Apr 2026
21 May 2026
30 Apr 2026
20 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. | 32.5 | sq.m | 330 | ₹10,725 |
| 2 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 3.25 | cu.m | 1,122 | ₹3,646.5 |
| 3 | Demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. | 3.87 | cu.m | 1,136 | ₹4,396.32 |
| 4Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 4.01 | All kinds of soil | 29.25 | cu.m | 291 | ₹8,511.75 |
| 5 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 6.5 | cu.m | 2,211 | ₹14,371.5 |
| 6Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 6.01 | All works upto plinth level | 3.25 | cu.m | 6,192 | ₹20,124 |
| 7Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 7.01 | Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth | 31.89 | sq.m | 412 | ₹13,138.68 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.59 MB
Tendernotice_2.pdf
PDF • 0.62 MB
BOQ_29382.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .