| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.9 LAccepted-AOC A 4 SIDCO INDUSTRIAL ESTATE METTUR DAM 636402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹3.9 L Quoted ₹3.5 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | DEVI FABRICATORS AND ENGINEERING CONTRACTORS L1 |
|---|---|---|---|---|
| 1.00 | Cleaning and removing of sludge of acidic, alkaline and lime slurry formed during neutralization of effluent water in neutralizing pits. | 36 | No. | 6,450 ₹2,32,200 |
| 2.00 | Charges for cutting the punctured/worn out fittings preparing the edges for heating the fittings & pipes, positioning both ends in the jack welding including T&Ps like wood raw file, carpenter saw heating mirror and Hydraulic welding jack, all consumable etc., complete for 63mm, 75mm & 90mm, OD HDPE joints. | 50 | Joints | 525 ₹26,250 |
| 3.00 | Charges for transportation of scaffolding materials and all other required materials from boiler maintenance stores/central stores, leading and lifting the materials to DM Plant and providing temporary platforms wherever required, dismantling temporary platform after completion of work and handing over the materials to boiler maintenance stores. | 10 | Times | 8,800 ₹88,000 |
| 4.00 | Cost of Consumables and T&Ps. | 1 | LS | 1,650 ₹1,650 |
Tender Value
Refer Docs
EMD Value
₹3,200
Closing Date
23 Jan 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM DM Plant Neutralizing pits below ground level size 9.5m 6.5m 3.5m Cleaning and removing of sludges of acidic alkaline and lime slurry etc
2025_EB_517671_1
CE / MTPS-I / SE / M-I / BM /OT.282 / 2024-25
Open Tender
Power/Energy Projects/Products
365 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹3,200
Yes
5 Jan 2026
9 Jan 2025
24 Jan 2025
9 Jan 2025
23 Jan 2025
9 Jan 2025
Amount
Cleaning and removing of sludge of acidic, alkaline and lime slurry formed during neutralization of effluent water in neutralizing pits.
Charges for cutting the punctured/worn out fittings preparing the edges for heating the fittings & pipes, positioning both ends in the jack welding including T&Ps like wood raw file, carpenter saw heating mirror and Hydraulic welding jack, all consumable etc., complete for 63mm, 75mm & 90mm, OD HDPE joints.
Charges for transportation of scaffolding materials and all other required materials from boiler maintenance stores/central stores, leading and lifting the materials to DM Plant and providing temporary platforms wherever required, dismantling temporary platform after completion of work and handing over the materials to boiler maintenance stores.
Cost of Consumables and T&Ps.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid