Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 CrAccepted-AOC 815 MUGHALCHAK ALINAGAR MUGHALSARAI CHANDAULI UTTAR PRADESH 232101 | CHANDAULI | UTTAR PRADESH | 232101 | ₹6.6 Cr Quoted ₹6.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹7.3 Cr+₹87.2 L (13.5%)Rejected-AOC | ₹7.3 Cr+₹87.2 L (13.5%) | L2 | Rejected-AOC L2 |
| 3 | L3₹7.4 Cr+₹92.5 L (14.3%)Rejected-AOC | ₹7.4 Cr+₹92.5 L (14.3%) | L3 | Rejected-AOC L3 |
| 4 | L4₹7.5 Cr+₹1.1 Cr (16.4%)Rejected-AOC | ₹7.5 Cr+₹1.1 Cr (16.4%) | L4 | Rejected-AOC L4 |
Tender Value
₹8.4 Cr
EMD Value
₹8.4 L
Closing Date
10 Apr 2023, 5:00 pmClosed
Superintending Engineer (KHR and Vashi)
Executive Engineer (KHRII), CIDCO Ltd., Ground Floor, CIDCO Nodal Office, Sector 4, Kharghar, Navi Mumbai. Tel. No. 9869756321.
Balance integrated development work of sector 19 at kharghar, Navi Mumbai
2023_CIDCO_884183_1
CANO02/CIDCO/EE(KHR-II)/22-23
Open Tender
Civil Works
Percentage
548 days
CIDCO LTD.
Please refer Tender documents.
5 documents required · 5 mandatory
₹21,240
₹8.4 L
Yes
15 Apr 2024
14 Mar 2023
12 Apr 2023
14 Mar 2023
10 Apr 2023
14 Mar 2023
eProcurement System Government of Maharashtra Created By: Ishan Munjewar Created Date/Time: 09-May-2023 03:29 PM Tender Title: Balance integrated development work of sector 19 at kharghar, Navi Mumbai Tender ID: 2023_CIDCO_884183_1
Tender Inviting Authority: SUPERINTENDING ENGINEER (KHR & VASHI), CIDCO LTD.
Name of Work : Balance integrated development work of Sector – 39 at Kharghar, Navi Mumbai.
Contract No: C.A.NO.02/CIDCO/EE(KHR-II)/2022-23
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 J M Mhatre Infra Pvt Ltd(GSTN-27AACCJ2959E1ZJ) 82608958.180 -10.590 73860669.509 Seven Crore Thirty Eight Lakh Sixty Thousand Six Hundred and Sixty Nine
2.00 THAKUR INFRAPROJECTSPVT LTD(GSTN-27AACCT6451F1ZC) 82608958.180 -8.930 75231978.215 Seven Crore Fifty Two Lakh Thirty One Thousand Nine Hundred and Seventy Eight
3.00 Ajwani Infrastructure Pvt. Ltd.(GSTN-27AAACG7651C1ZT) 82608958.180 -11.230 73331972.176 Seven Crore Thirty Three Lakh Thirty One Thousand Nine Hundred and Seventy Two
4.00 Zenith Construction Company(GSTN-27AAAFZ2770N1ZN) 82608958.180 -21.790 64608466.193 Six Crore Fourty Six Lakh Eight Thousand Four Hundred and Sixty Six
Lowest Amount Quoted BY: Zenith Construction Company(64608466.193)
BOQ Summary Details Tender Title: Balance integrated development work of sector 19 at kharghar, Navi Mumbai Tender ID: 2023_CIDCO_884183_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Zenith Construction Company 64608466.193 L1
2 Ajwani Infrastructure Pvt. Ltd. 73331972.176 L2
3 J M Mhatre Infra Pvt Ltd 73860669.509 L3
4 THAKUR INFRAPROJECTSPVT LTD 75231978.215 L4
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .