Tender Value
₹45.2 L
EMD Value
₹90,472
Closing Date
21 Sept 2026, 11:00 amClosed
Executive Engineer, C.P. Division No.4, Chandigarh
Executive Engineer, C.P. Division No.4, Chandigarh
Miscellaneous Works in Govt. Model Sr. Sec. School, RC-1, Maloya Chandigarh
2026_CHD_95250_1
CP4/2026/3093791
Open Tender
Civil Works
Percentage
90 days
Miscellaneous Works in Govt. Model Sr. Sec. School
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹90,472
21 Sept 2026
8 Sept 2026
21 Sept 2026
8 Sept 2026
21 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): Flush / Ruled/ Struck or weathered pointing (As per DSR 13.31.1) | 4,844.5 | /sqm | 250.4 | ₹12,13,062.8 |
| 2 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) (As per DSR 13.46.1) | 4,844.5 | /sqm | 156.26 | ₹7,57,001.57 |
| 3 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) (As per DSR 13.1.1) | 1,696.14 | /sqm | 337.68 | ₹5,72,752.56 |
| 4 | 6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand) (As per DSR 13.16.1) | 726.87 | /sqm | 292.34 | ₹2,12,493.18 |
| 5 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. (As per DSR 13.80) | 2,423.01 | /sqm | 151.84 | ₹3,67,909.84 |
| 6 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gram/litre, of approved manufacturer and of required shade and colour all complete to achieve even shade and colour : New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 gram/litre (As per DSR 13.41.1) | 2,423.01 | /sqm | 180.64 | ₹4,37,692.53 |
| 7 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC (Volatile Organic Compound ) content less than 50 gram/ litre, of approved brand and manufacturer including applying additional coats wherever required to achieve even shade and colour Old work (one or more coats) (As per DSR 13.81.1) | 2,247.86 | /sqm | 61.01 | ₹1,37,141.94 |
| 8 | Providing and applying cement based putty (Birla, Jk or equivalent) to the required finish complete in all respect and to the entire satisfaction of Engineer-in-charge. (N.S.) | 1,123.93 | /sqm | 27.8 | ₹31,245.25 |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work (As per DSR 13.99.1) | 465.32 | /sqm | 100.02 | ₹46,541.31 |
| 10 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. (As per DSR 14.72) | 905.94 | /sqm | 329.12 | ₹2,98,162.97 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_116986.xls
BOQ • 0.29 MB
corri.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .