| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.9 LAdmitted-Finance 70 GANESH VATIKA BEHIND HDEC BANK VIJAYPURA ROAD JAIPUR | JAIPUR | RAJASTHAN | 302001 | -25.99% | ₹21.9 L | L1 | Admitted-Finance |
| 2 | L2₹22.7 L+₹85,476.51 (3.90%)Admitted-Finance 45 GANPATI NAGAR SHIPRA PATH MANSAROVAR JAIPUR RAJASTHAN 302020 | JAIPUR | RAJASTHAN | 302020 | -23.10% | ₹22.7 L+₹85,476.51 (3.90%) | L2 | Admitted-Finance |
| 3 | L3₹23.6 L+₹1.7 L (7.77%)Admitted-Finance H NO 1A NEAR TEEJA JI KA MANDIR MAIN SODALA JAIPUR RAJASTHAN 302019 | JAIPUR | RAJASTHAN | 302019 | -20.24% | ₹23.6 L+₹1.7 L (7.77%) | L3 | Admitted-Finance |
Tender Value
₹29.6 L
EMD Value
₹59,160
Closing Date
18 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER SANGANER ZONE
JAIPUR NAGAR NIGAM PANDIT DEENDAYAL UPPADHYAY BHAWAN LALKOTHI TONK ROAD JAIPUR
Construction work of CC road from Sitapura village and Prakash Gurjar Mahaveer Colony house to Govardhan Nagar chuaraha (Dev Narayan Temple) in ward no. 54 of Sanganer zone.
2026_DLB_583248_1
23 EXECUTIVE ENGINEER SANGANER ZONE
Open Tender
Civil Works - Roads
Percentage
120 days
JAIPUR
As Per Bid Documents
3 documents required · 3 mandatory
₹590
ONLINE PAY IN JAIPURMC WEBSITE
₹59,160
Yes
1 Sept 2026
7 Aug 2026
19 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffoldingwherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer | - | - | - | - |
| 2 | Lime Concrete, cement concrete grade M-10 (1:5:10) and below | 100 | CUM | 393.5 | ₹39,350 |
| 3 | Cement Concrete Grade M-15 and above and PCC blocks | 150 | CUM | 678 | ₹1,01,700 |
| 4 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil | 420 | CUM | 235.5 | ₹98,910 |
| 5 | Carriage of Materials by mechanical transport including loading,unloading and stacking ::Stone,boulders,gravelly material Beyond 5Km upto 10Km.per Km. | 670 | CUM | 335.38 | ₹2,24,704.6 |
| 6 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manualy,compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material,labour, machinery, lighting, guarding and maintenance of diversion. | 200 | cum | 2,955 | ₹5,91,000 |
| 7 | Providing and laying un-reinforced, dowel jointed, plain cement concrete mix in pavement over a prepared sub base with 43 grade
cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. PCC M-20 | 300 | CUM | 6,340 | ₹19,02,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
eproc23xensnz.pdf
Tender Documents • 4.51 MB
BOQ_1036279.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .