Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹8.0 Cr Replacement of existing chiller plant with latest VRV / VRF unit along with comprehensive Maintenance of VRV / VRF Units for 5 years at NABARD, BKC, Bandra East, Mumbai. | Replacement of existing chiller plant with latest VRV / VRF unit along with comprehensive Maintenance of VRV / VRF Units for 5 years at NABARD, BKC, Bandra East, Mumbai. | ₹8.0 Cr | L1 |
| 2 | L2₹8.9 Cr+₹85.2 L (10.6%) Replacement of existing chiller plant with latest VRV / VRF unit along with comprehensive Maintenance of VRV / VRF Units for 5 years at NABARD, BKC, Bandra East, Mumbai. | Replacement of existing chiller plant with latest VRV / VRF unit along with comprehensive Maintenance of VRV / VRF Units for 5 years at NABARD, BKC, Bandra East, Mumbai. | ₹8.9 Cr+₹85.2 L (10.6%) | L2 |
| 3 | L3₹9.7 Cr+₹1.7 Cr (21.7%) Replacement of existing chiller plant with latest VRV / VRF unit along with comprehensive Maintenance of VRV / VRF Units for 5 years at NABARD, BKC, Bandra East, Mumbai. | Replacement of existing chiller plant with latest VRV / VRF unit along with comprehensive Maintenance of VRV / VRF Units for 5 years at NABARD, BKC, Bandra East, Mumbai. | ₹9.7 Cr+₹1.7 Cr (21.7%) | L3 |
| 4 | L4₹10.3 Cr+₹2.3 Cr (29.1%) Replacement of existing chiller plant with latest VRV / VRF unit along with comprehensive Maintenance of VRV / VRF Units for 5 years at NABARD, BKC, Bandra East, Mumbai. | Replacement of existing chiller plant with latest VRV / VRF unit along with comprehensive Maintenance of VRV / VRF Units for 5 years at NABARD, BKC, Bandra East, Mumbai. | ₹10.3 Cr+₹2.3 Cr (29.1%) | L4 |
| 5 | - | - | - |
| Sl No | Description | Qty | Unit | AIR FAB ENGINEERS I PVT LTD L2 | UTILITY SERVICES L1 | VIGHNESHWARAIRCONDITIONING PVT LTD L4 | K D BUILDING SOLUTIONS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|
| 1 | Electrical work | - | - | -18.18 ₹8,85,59,825.95 | -26.05 ₹8,00,41,543.99 Lowest | -4.52 ₹10,33,45,052.33 | -10 ₹9,74,13,643.8 |
Tender Value
₹10.8 Cr
EMD Value
₹20.8 L
Closing Date
19 Apr 2024, 3:00 pmClosed
EE(E)Mumbai-III
Ashok Pal
EE(E).MUMBAI 3, SECTOR 7, ANTOP HILLS,MUMBAI 37
Replacement of existing chiller plant with latest VRV / VRF unit along with comprehensive Maintenance of VRV / VRF Units for 5 years at NABARD, BKC, Bandra East, Mumbai.
72193
09/CE/MUMBAI-II/2023-24
OPEN
Electrical and Maintenance Works
NCB
8 months
Mumbai, Maharashtra
13 documents required · 13 mandatory
₹20.8 L
At Chief Engineer Mumbai II, 4th Floor, New CGO Bldg., , Nishtha Bhawan, Mumbai 20
19 Apr 2024
16 Mar 2024
19 Apr 2024
19 Apr 2024
23 Mar 2024
27 Mar 2024
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
NIT09combined.pdf
document • 2.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .