Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.6 LAccepted-Finance 13 48 RAJA MANINDRA ROAD CAL 37 700037 | KOLKATA | WEST BENGAL | 700037 | 1 | Accepted-Finance L1 | |
| 2 | 2₹2.7 L+₹4,893 (1.87%)Rejected-Finance VILL PO GIDHAGRAM DIST PURBA BARDHAMAN | PURBA BARDHAMAN | WEST BENGAL | 712134 | 2 | Rejected-Finance L2 | |
| 3 | 3₹2.7 L+₹11,094 (4.24%)Rejected-Finance | 3 | Rejected-Finance L3 |
Tender Value
₹2.6 L
EMD Value
₹6,000
Closing Date
14 Nov 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E. (C), BR-I
KOLKATA
REPAIRING OF ASPHALTUM ROAD AT KHELAT BABU LANE, OLAI CHANDI ROAD, RAJ KUMAR CHATTERJEE ROAD AND OTHER SURROUNDING AREAS IN WARD NO 005
2026_KMC_1047211_1
KMC/EEC/I/005/15/2026-2027
Open Tender
CIVIL WORKS
Percentage
21 days
KOLKATA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
22 Nov 2026
30 Oct 2026
17 Nov 2026
30 Oct 2026
14 Nov 2026
30 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post work | 55.83 | CUBIC METER | 79.9 | ₹4,460.42 |
| 2 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) | 38.06 | CUBIC METER | 2,596.83 | ₹98,841.84 |
| 3 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) For Construction of Sub Base by consolidating Brick Bats / Laterite (90 mm to 45 mm) | 38.06 | CUBIC METER | 1,944.9 | ₹74,027.76 |
| 4 | Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, | 24 | EACH | 1,758.9 | ₹42,213.6 |
| 131 | Estimated amount | - | - | - | - |
| 132 | Add: 9%SGST | 1 | LS | 13,091.41 | ₹13,091.41 |
| 133 | Add: 9%CGST | 1 | LS | 13,091.41 | ₹13,091.41 |
| 134 | 1% LWC | 1 | LS | 2,443.73 | ₹2,443.73 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.17 MB
SOQ1.pdf
Additional Documents • 0.81 MB
BOQ_2565382.xls
BOQ • 0.29 MB
TF.pdf
Tender Documents • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .