Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC Low Level Quoted | |
| 2 | L2₹10.1 L+₹24,889.59 (2.52%)Rejected-Finance | L2 | Rejected-Finance High Level Quoted |
Tender Value
Refer Docs
EMD Value
₹9,980
Closing Date
10 Jun 2025, 4:00 pmClosed
Block Development Officer,Uthiramerur
Block Development Office,Uthiramerur
Construction of RCC Slab Culvert with Cement Road Kavanipakkam Mettu Colony 60m At Arumbuliyur Panchayat
2025_RDTN_565347_1
DRDAKPM 3091784/2024/A10 Dt 02.04.2025
Open Tender
Civil Works
Lump-sum
Uthiramerur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,980
24 Jul 2025
5 Jun 2025
10 Jun 2025
5 Jun 2025
10 Jun 2025
5 Jun 2025
Amount
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B
Supply and filling foundation and basement with filling sand in layer not more than 15cm,thick well ramed,watered and compacted complete complying with standard specification
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Reinforced Cement Concrete 1: 1 1/2: 3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification
Earth work Excavation for Foundation in all soils and Sub Soil to full depth sides of foundation.As per Ss 20A
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
Supply and erecting centering for sides and soffits including cost and conveyance and all other labour chargesetc.complete.
C.C. 1:2:4. Mix using 20MM HBG metal including cost and conveyance and all other labour charges & centering for the side surfaces etc.complete.
Supplying and fixing of Bitumen pad for expansion joints
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PRABHU (BID ID -1361282)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_675035.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .