Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-AOC 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.8 L+₹5,012.66 (0.43%)Rejected-Finance ALIGARH | UTTAR PRADESH | 202001 | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.9 L+₹20,110.06 (1.72%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹12.4 L+₹64,410.37 (5.50%)Rejected-Finance B 3 P L O C COLONY NARBAI GATE KASGANJ | KASGANJ | KASGANJ | UTTAR PRADESH | L4 | Rejected-Finance L4 | |
| 5 | L5₹12.8 L+₹1.1 L (9.20%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S Harish Kumar Contractor L1 | SURESH CHANDRA CONTRACTOR L5 | M/S PRADEEP ASSOCIATES L8 | M/s Balaji Construction & Suppliyer L4 | SHREE RAMESHWAR SINGH L3 | Rajesh Kumar Sharma L9 | MAHIPAL SINGH THEKEDAR L6 | M/S SANWALIYA CONSTRUCTION L7 | M/S SANTOSH KUMAR YADAV L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | EARTH WORK IN FOUNDATION IN DRY SOIL INCLUDING LEFT UP TO 1.50 AND LEAD UP TO 30M INCLUDING BACK FILLING WATERING AND RAMING OF EXCVATED EARTH IN TO THE STRUCTURE AND THE SIDES OF FOUNDATION TRENCHES OR INTO THE PLINGTH WITH REMOVAL AND DISPOSAL OF SURPLUS EARTH AS DIRECTED BY ENGINEER IN CHARGE UP TO 30 METER LEAD FROM THE FOUNDATION | 28.33 | CUM | 70.88 ₹2,008.03 | 50 ₹1,416.5 | 80 ₹2,266.4 | 60 ₹1,699.8 | 40 ₹1,133.2 | 50 ₹1,416.5 | 39 ₹1,104.87 Lowest | 39 ₹1,104.87 Lowest | 60 ₹1,699.8 |
| 2.00 | UPROOTTING JHUNDS AND MOONJ DISPOSAL AWAY FROM SITE | 1,886 | SQM | 24.81 ₹46,791.66 | 20 ₹37,720 | 20 ₹37,720 | 28 ₹52,808 | 3 ₹5,658 Lowest | 20 ₹37,720 | 9 ₹16,974 | 9 ₹16,974 | 10 ₹18,860 |
| 3.00 | CLEANING THIKS BUSHES AND THORNY JUNGLE WITHOUT UPROOTING | 3,772 | SQM | 3.12 ₹11,768.64 | 2 ₹7,544 | 3 ₹11,316 | 3 ₹11,316 | 3 ₹11,316 | 12 ₹45,264 | 9 ₹33,948 | 9 ₹33,948 | 1.2 ₹4,526.4 Lowest |
| 4.00 | PROVIDING AND LAYING C C 1 3 6 IN FOUNDATION AND FLOOR INLUDING COST OF MATERIAL LABOUR T AND P ETC | 0.6 | CUM | 4,890.72 ₹2,934.43 | 5,000 ₹3,000 | 5,000 ₹3,000 | 6,100 ₹3,660 | 500 ₹300 Lowest | 5,500 ₹3,300 | 3,900 ₹2,340 | 3,900 ₹2,340 | 4,861 ₹2,916.6 |
| 5.00 | RCC PRECAST BOUNDARY COMPOUND WALL SUB PRESTRESSED PRECAST BOUNDARY WALL INDTALLATION M 25 GRADE CONCRETE COMPOND WALL PILLAR SIZE 150MM X 150MM WITH 7 NOS 3MM HTC WIRE AND M 25 GRADE CONCRETE PANEL SIZE 300mm X 45mm X 2100 mm WITH 4 Nos 3mm HTC WIRE AND 2 SIDE SAME FINISHING M 25 GRADE CONCRET INCLUDING ALL MATERIAL LABOUR TRANSPORTTION ETC | 1,097.6 | SQM | 815.12 ₹8,94,675.71 Lowest | 910 ₹9,98,816 | 1,000 ₹10,97,600 | 850 ₹9,32,960 | 900 ₹9,87,840 | 870 ₹9,54,912 | 999 ₹10,96,502.4 | 999 ₹10,96,502.4 | 850 ₹9,32,960 |
| 6.00 | CENTERING AND SHUTTERING FOR R C C WORKWORK INCLUDING ALL COST OF MATERIAL LABOUR AND T AND P | 19.79 | SQM | 570.58 ₹11,291.78 | 300 ₹5,937 | 500 ₹9,895 | 599 ₹11,854.21 | 700 ₹13,853 | 250 ₹4,947.5 | 49 ₹969.71 Lowest | 49 ₹969.71 Lowest | 500 ₹9,895 |
| 7.00 | STEEL REINFOCEMENT INCLUDING BENDING BINDING CUTTING PLACEING OF REINFORCEMENT MATERIAL LABOUR T AND P | 0.29 | MT | 57,942.98 ₹16,803.46 Lowest | 75,000 ₹21,750 | 65,000 ₹18,850 | 75,600 ₹21,924 | 76,000 ₹22,040 | 80,000 ₹23,200 | 60,000 ₹17,400 | 60,000 ₹17,400 | 65,000 ₹18,850 |
| 8.00 | RCC 1 1.5 3 IN SALB AND ABUTMENT INCLUGDING ALL MATERIAL LABOUR AND T AND P ETC COMPLETE | 2.43 | CUM | 5,381.84 ₹13,077.87 Lowest | 6,000 ₹14,580 | 6,000 ₹14,580 | 7,950 ₹19,318.5 | 6,000 ₹14,580 | 6,500 ₹15,795 | 5,900 ₹14,337 | 5,900 ₹14,337 | 6,500 ₹15,795 |
| 9.00 | FINISHING WALLS TWO COATS WITH WATER PROOFING CEMENT PAINT OF APPROVED MAKE AND QUALITY ON NEW WOOD WITH TWO COAT TO GIVE AN EVEN SHADE INCLUDING SUPPLY OF ALL MATERIAL LABOUR TOOLS AND PLANTS ETC REUIRED FOR PROPER COMPLETION OF THE WORK | 1,960 | SQM | 51.6 ₹1,01,136 | 50 ₹98,000 | 55 ₹1,07,800 | 46 ₹90,160 Lowest | 60.5 ₹1,18,580 | 170 ₹3,33,200 | 49 ₹96,040 | 49 ₹96,040 | 50 ₹98,000 |
| 10.00 | SUPPLYING AND FIXING MAIN STEEL GATE OF 4.00 X 2.00 AND SLIDE GATE OF 1.50 X 2.00 ON RECTANGULAR HOLLOW SEWCTION PIPE WITH ONE COAT OF RED OXIDE PRIMER AND PAINTING WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND MANUFACTURE TO GIVE AN EVEN SHADE IB=NCLUDING COST OF ALL MATERIAL LABOUFR AND T AND P ETC | 1 | NO | 66,958.56 ₹66,958.56 | 85,000 ₹85,000 | 80,000 ₹80,000 | 86,500 ₹86,500 | 10,000 ₹10,000 | 35,000 ₹35,000 | 6,000 ₹6,000 Lowest | 6,100 ₹6,100 | 70,000 ₹70,000 |
Tender Value
₹16.5 L
EMD Value
₹33,040
Closing Date
10 Sept 2025, 2:00 pmClosed
EE ADGC ALIGARH
EE ADGC ALIGARH
CONSTRUCTION OF BOUNDRY WALL THE SECURITY OF NAVABPUR INPECTION HOUSE SITUATED ON ANUPSHAHR BRANCH
2025_UPIDC_1070366_7
3542 dt 23.08.2025
Open Tender
Civil Works
Item Rate
90 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹33,040
19 Nov 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .