| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 LAccepted-AOC | 1 | Accepted-AOC This authority has resolved to issue the Work Order to L1 bidder. | |
| 2 | 2₹4.6 L+₹18,981.86 (4.26%)Rejected-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | 2 | Rejected-Finance Higher rate offered than L1 Bidder. | |
| 3 | 3₹4.6 L+₹19,165.71 (4.30%)Rejected-Finance 22 LASKARDIGHI WEST DIST PURBA BARDHAMAN | PURBA BARDHAMAN | WEST BENGAL | 3 | Rejected-Finance Higher rate offered than L1 Bidder. |
Tender Value
Refer Docs
EMD Value
₹9,195
Closing Date
15 Jan 2026, 4:55 pmClosed
Administrator, Haldia Municipality
City Center, Debhog, Haldia, Purba Medinipur, 721657
Tally Pilling work of pond of Subhas Maity at Bhabanipur under Ward No. 16 within Haldia Municipality.
2025_MAD_979395_1
WBMAD/ULB/HM/6505/NIT-2469
Open Tender
CIVIL WORKS
Percentage
30 days
Haldia Municipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,195
24 Jul 2026
24 Dec 2025
16 Jan 2026
24 Dec 2025
15 Jan 2026
24 Dec 2025
Page No. -4/8 Pumping out water from ponds or tanks
Page No. - 1/2 (a) Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Page No. - 1/3 Earth work in filling in foundation trenches or plinth with good earth. in layers not exceeding 150 mm. including watering and raming etc. layer by layer complete. ( Payment to be made on basis of measurement of fiinished quantity of work ) a) With earth obtained from excavation of foundation.
P - 4/9 Extra over the corresponding item of earth work for removing semi liquid mud or slushy earth by iron pans, buckets etc.
Page No. - 2/4 (a) (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
Page No. - 14/1 Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Analysis rate Supplying & laying tile vertically laid ( 275 mm ) Raniganj pattern tiles along the sides of pond. Jointing adjuscent tile with semi liquid mud, complete in all respect including the cost of all materials, labours & other incidental charges as per direction of E-I-C.
Item No. 7 / Page No. - 26/10 (i ) ( Analysis rate ) Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Page No. - 42/36 Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fittings, fixing and striking out after completion of works. ( upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height. shall be taken as 4 m and extra for woks beyond the initial 4 m. ht. shall be allowed under 12(e) for every 4 m or part thereof. ) f) 25 mm to 30 mm shuttering without staging in foundation.
Page No. - 2/5 Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. ( Payment will be made on profile measurement before and after the work ) (a) With earth obtained by fresh excavation upto 1800 mm. depth (including the cost of excavation from land arranged by the Deptt. within a lead of 100 m.)
Page No. - 43/40 (ii) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. SHYAM / SRMB
GST Item (Effect from 18.07.2022) 18 % GST on Estimated Cost of Sl No- 1 to 11
Labour Welfare Cess Item (Effect from 01.11.2017) 1% Labour Welfare Cess on Estmated Cost of Sl No -1 to 12
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_2387179.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .