Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.0 LAccepted-AOC JAIGAON MANGLANBARI | JALPAIGURI | WEST BENGAL | 734001 | L1 | Accepted-AOC STANDS LOWEST L1 | |
| 2 | L2₹46.0 L+₹4,471.32 (0.10%)Rejected-Finance BIRBHUM SANTINIKETAN | SANTINIKETAN | BIRBHUM | WEST BENGAL | L2 | Rejected-Finance HIGHER THAN L1 | |
| 3 | L3₹46.1 L+₹8,495.50 (0.18%)Rejected-Finance SANTI NAGAR BOW BAZAR DABGRAM II SILIGURI DIST JALPAIGURI 734 004 WEST BENGAL | SILIGURI | JALPAIGURI | WEST BENGAL | 734004 | L3 | Rejected-Finance HIGHER THAN L1 and L2 |
Tender Value
₹46.1 L
EMD Value
₹92,109
Closing Date
8 Apr 2026, 5:00 pmClosed
EXCUTIVE ENGINEER NMD-II PHE DTE
MAYA TALKIES ROAD ,BABUPARA ,ALIPURDUAR 736121
Operation AND guarding of pumping machinery at pump House No. I ,II , III, IV, V,VI ,Zone-I P/H -I and II ENCLAVE, Zone-II P/H -III along with arrear wages under KUCHLIBARI W/S Scheme, in the dist. of Coochbehar.
2026_PHED_1018619_150
WBPHED/EE/NMD-II/NIeT- 30 OF 2025-26
Open Tender
MECHANICAL
Percentage
276 days
KUCHLIBARI
Pre Qualification forms
6 documents required · 6 mandatory
₹92,109
19 May 2026
14 Mar 2026
10 Apr 2026
15 Mar 2026
8 Apr 2026
15 Mar 2026
Part A-1 Arrear Wages to be paid to the operating personnel for operation of pumping machinery of pump house by MANUAL Panel including operation of valves, disinfection arrangement, internal/external illuminations as per specification and round the clock guarding of the whole installtion with all accessoreis. (EPF & ESIC contribution of the employers @13% and @3.25% are included for establishment having 20 employees or more) Period from: 01.2.2026 to 30.04.2026
For P/H NO.I
For P/H NO.II
For P/H NO.III
For P/H NO.IV
For P/H NO.V
For P/H NO.VI
Part A-1 Arrear Wages to be paid to the operating personnel for operation of pumping machinery of pump house by AUTOMATIC Panel including operation of valves, disinfection arrangement, internal/external illuminations as per specification and round the clock guarding of the whole installtion with all accessoreis. (EPF & ESIC contribution of the employers @13% and @3.25% are included for establishment having 20 employees or more) Period from: 01.2.2026 to 30.04.2026
For Z-I P/H NO.I (ENCLAVE)
For Z-I P/H NO.II (ENCLAVE)
For Z-II P/H NO.III
Part-A/1 Labour charges for 2 (Two) Nos. operating personnel for operation of pumping machinery of each pump house by Manual Panel including operation of valve, disinfection arrangement, internal / external illuminations as per specification and round the clock guarding of the whole installation with all accessories. (ESIC and EPF Contribution of Employers for @ 3.25% and @ 13% are include for establishment having 20 Employers or more.) Period From :- 01.05.2026 to 31.01.2027 Rates has been inclusive @1% CESS
For P/H NO.I
For P/H NO.II
For P/H NO.III
For P/H NO.IV
For P/H NO.V
For P/H NO.VI
Part-A/2 Labour charges for 1 (One) No. operating personnel for operation of pumping machinery of each pump house by Automatic Panel including operation of valve, disinfection arrangement, internal / external illuminations as per specification and round the clock guarding of the whole installation with all accessories. (ESIC and EPF Contribution of Employers for @ 3.25% and @ 13% are include for establishment having 20 Employers or more.) Period From :- 01.05.2026 to 31.01.2027 Rates has been inclusive @1% CESS
For Z-I P/H NO.I (ENCLAVE)
For Z-I P/H NO.II (ENCLAVE)
For Z-II P/H NO.III
Part - B Supervision charges for electrical installation within the pump house by Licensed Electrician as per IE Rules, 1956 read with latest amendments Overhead expenditure as per specification & direction of the EIC. Period From :- 01.05.2026 to 31.01.2027 Rates has been inclusive @1% CESS
For P/H NO.I
For P/H NO.II
For P/H NO.III
For P/H NO.IV
For P/H NO.V
For P/H NO.VI
For Z-I P/H NO.I (ENCLAVE)
For Z-I P/H NO.II (ENCLAVE)
For Z-II P/H NO.III
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
Tendernotice_2.pdf
PDF • 0.09 MB
Tendernotice_3.pdf
PDF • 1.23 MB
Tendernotice_4.pdf
PDF • 0.92 MB
BOQ_2512007.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .