Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.4 L+₹5,940.81 (4.59%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.4 L+₹13,289.93 (10.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-PANCARD NOT UPLOADED |
Tender Value
₹1.6 L
EMD Value
₹4,860
Closing Date
21 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O TILE PATH FROM LP SCHOOL TO NIZAMUDIN MIR WARD NO 4/DRAIN FROM GULL MOHD PALA TO LATE GH MOHD ZAGOO WARD NO. 6 BLOCK BRENG
2026_RDPR_315915_120
ENIT63of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹4,860
23 Jul 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
21 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Dismantling of existing drain and dresssing of sides by the way of engagement of labours | 4 | NO | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using mix. (1:4:8) and by using 40 mm down aggregates. | - | Cum | - | - |
| 0.0 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction with thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | - | sqm | 1 | - |
| 0.0 | P/L of PCC of M 10 grade in side blocks using rich mix of concrete excluding cost of centring and shuttring. | - | cum | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | SQM | - | - |
| 0.0 | carriage of materials by M.T | - | - | - | - |
| 0.0 | Sand / aggregateLead 30 kms by MT | - | cum | - | - |
| 0.0 | Carriage of cement 5 kms and by shuttering and tiles | 3 | Trip | - | - |
| 0.0 | Provision for signboard & photographs , | 1 | job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1028419.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .