Loading…
Loading…
Tender Value
₹3.1 L
EMD Value
₹3,900
Closing Date
18 Sept 2026, 11:00 am6d left
Amit Kumar, Dy. Manager(CP), SawangWashery, Kathar
Office of the Project Officer, Sawang Washery
Repairing. Overhauling, Precision Machining, Repairing of M.S. Channel Gear Box Base Frame, Build-up Welding, Assembly, Alignment, Testing and Commissioning of Gear Boxes installed at Bucket Elevator, BC 03, BC05, BC 06 and BC 09 of Sawang Washery.
2026_CCL_365139_1
SGW/KTA/ENM/E-Tender/26-27/24 Date 08.09.2026
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
Office of the Project Officer, Sawang Washery
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,900
8 Sept 2026
8 Sept 2026
19 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
9 Sept 2026 - 15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling, cleaning, inspection & shifting | 1 | Job | - | - |
| 1.02 | Repair of M.S. channel base frame, build-up welding, crack repair, bore & shaft restoration | 1 | Job | - | - |
| 1.03 | Precision machining, keyway restoration, dimensional restoration & alignment | 1 | Job | - | - |
| 1.04 | Final assembly, erection, bearing & oil seal fitment. alignment, testing & commissioning | 1 | Job | - | - |
| 2 | Total impact of GST for the purpose of CTC | 1 | No. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.39 MB
BOQ_378061.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .