| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC 205 IIND PHASE INDUSTRIAL AREA BARMER 344001 | BARMER | BARMER | RAJASTHAN | 344001 | ₹14.8 L Quoted ₹15.8 L | L1 | Accepted-AOC AOC |
| 2 | L2₹15.8 L+₹6,050 (0.38%)Rejected-Finance MAHAVEER NAGAR BARMER RAJASTHAN 344001 MAHAVEER NAGAR BARMER RAJASTHAN 344001 | BARMER | RAJASTHAN | 344001 | ₹15.8 L+₹6,050 (0.38%) | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹16.0 L+₹16,825 (1.07%)Rejected-Finance 2 EVEREST VIHAR PT T N MISHRA MARG NIRMAN NAGAR JAIPUR 302019 | JAIPUR | RAJASTHAN | 302019 | ₹16.0 L+₹16,825 (1.07%) | L3 | Rejected-Finance Other than lowest |
| 4 | L4₹16.3 L+₹46,445 (2.94%)Rejected-Finance NEAR RAILWAY STATION UTARLAI BARMER RAJASTHAN PIN 344001 | BARMER | RAJASTHAN | 344001 | ₹16.3 L+₹46,445 (2.94%) | L4 | Rejected-Finance Other than lowest |
| 5 | L5₹17.3 L+₹1.5 L (9.61%)Rejected-Finance | ₹17.3 L+₹1.5 L (9.61%) | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | KRISHNA CONSTRUCTION COMPANY L7 | M.D. CONSTRUCTION CO. L5 | Rasam Engg Co. L3 | M/s Sati Jasnath Enterprises L2 | National Rewinding Works L1 | Devi Engineeing L6 | M/S TANUSHREE CONSTRUCTION COMPANY L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for attending daily day to day complain regarding no water supply,leakage and break down of pipe line of GI upto 80 mm including necessary excavation with dewatering the water accumulated at site and solve the complain using required fittings or clamping arrangements, including testing for the leakages pipes complete all as specified and directed by Engineer-in-Charge.
Note:-Supply and fixing of pipe will be measured separately. | 300 | Each Job | 300 ₹90,000 | 250 ₹75,000 | 500 ₹1,50,000 | 400 ₹1,20,000 | 600 ₹1,80,000 | 725 ₹2,17,500 | 88 ₹26,400 Lowest |
| 2.00 | Excavation in trenches, not exc 1.5 m wide and n. exc 1.5 m depth, or n exc 10 Sqm on plan and n exc 1.5 m in depth for foundations, shafts, wells, cesspits, manholes, pier holes, for foundations of poles, struts, stays etc. or laying underground cable and water supply pipe lines etc. in soft/loose soil, & getting out including taking out old brick or precast cable cover complete all as specified and directed by Engineer-in-Charge. | 215 | Cubic Metre | 200 ₹43,000 | 200 ₹43,000 | 150 ₹32,250 | 150 ₹32,250 | 120 ₹25,800 Lowest | 195 ₹41,925 | 195 ₹41,925 |
| 3.00 | Returning, filling in, including spreading, leveling watering and well ramming in layers n.exc 25 cm in soft/loose soil complete all as specified and directed by Engineer-in-charge. | 205 | Cubic Metre | 60 ₹12,300 | 60 ₹12,300 | 75 ₹15,375 | 50 ₹10,250 Lowest | 50 ₹10,250 Lowest | 70 ₹14,350 | 70 ₹14,350 |
| 4.00 | Removal of excavated soil material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed by Engineer-in-charge. | 10 | Cubic Metre | 65 ₹650 | 120 ₹1,200 | 75 ₹750 | 40 ₹400 Lowest | 50 ₹500 | 85 ₹850 | 60 ₹600 |
| 5.00 | Taking up or down 20 mm bore galvanised steel water tubing including connections, fixed in walls, ceiling or laid under floor or laid in trenches etc complete all as specified and directed by Engineer-in-charge.
Note :-Excavation and earthwork shall be measured and paid for separately. | 150 | RM | 30 ₹4,500 | 20 ₹3,000 | 20 ₹3,000 | 10 ₹1,500 Lowest | 10 ₹1,500 Lowest | 10 ₹1,500 Lowest | 11 ₹1,650 |
| 6.00 | All as per Srl item No 5 above but 25 mm dia bore. | 250 | RM | 30 ₹7,500 | 25 ₹6,250 | 25 ₹6,250 | 20 ₹5,000 | 10 ₹2,500 Lowest | 15 ₹3,750 | 12 ₹3,000 |
| 7.00 | All as per Srl item No 5 above but 40 mm dia bore. | 350 | RM | 30 ₹10,500 | 30 ₹10,500 | 35 ₹12,250 | 30 ₹10,500 | 10 ₹3,500 Lowest | 18 ₹6,300 | 15 ₹5,250 |
| 8.00 | All as per Srl item No 5 above but 50 mm dia bore. | 650 | RM | 35 ₹22,750 | 35 ₹22,750 | 50 ₹32,500 | 40 ₹26,000 | 15 ₹9,750 Lowest | 20 ₹13,000 | 20 ₹13,000 |
| 9.00 | All as per Srl item No 5 above but 80 mm dia bore. | 300 | RM | 35 ₹10,500 | 40 ₹12,000 | 60 ₹18,000 | 50 ₹15,000 | 20 ₹6,000 Lowest | 30 ₹9,000 | 30 ₹9,000 |
| 10.00 | Taking up or down 100 mm bore GI/CI/DI including connections, fixed in walls, ceiling or laid under floor or laid in trenches etc complete all as specified and directed by Engineer-in-charge. | 110 | RM | 50 ₹5,500 | 50 ₹5,500 | 95 ₹10,450 | 80 ₹8,800 | 50 ₹5,500 | 55 ₹6,050 | 40 ₹4,400 Lowest |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
1 Aug 2026, 6:00 pmClosed
GE (AF) UTARLAI
GE (AF) UTARLAI PB No. 11 Barmer 344001 (Raj)
MAINT/ REPLACEMENT OF WATR PIPELINES, VALVES AND UG SUMP CLEANING AT TECH AREA OF AF STN UTARLAI
2026_MES_773993_1
8126/E8
Open Tender
Civil Works
Item Rate
180 days
Utarlai
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) UTARLAI
₹40,000
Yes
9 Sept 2026
22 Jun 2026
3 Aug 2026
22 Jun 2026
1 Aug 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for attending daily day to day complain regarding no water supply,leakage and break down of pipe line of GI upto 80 mm including necessary excavation with dewatering the water accumulated at site and solve the complain using required fittings or clamping arrangements, including testing for the leakages pipes complete all as specified and directed by Engineer-in-Charge.
Note:-Supply and fixing of pipe will be measured separately. | 300 | Each Job | 10 | ₹3,000 |
| 2 | Excavation in trenches, not exc 1.5 m wide and n. exc 1.5 m depth, or n exc 10 Sqm on plan and n exc 1.5 m in depth for foundations, shafts, wells, cesspits, manholes, pier holes, for foundations of poles, struts, stays etc. or laying underground cable and water supply pipe lines etc. in soft/loose soil, & getting out including taking out old brick or precast cable cover complete all as specified and directed by Engineer-in-Charge. | 215 | Cubic Metre | 10 | ₹2,150 |
| 3 | Returning, filling in, including spreading, leveling watering and well ramming in layers n.exc 25 cm in soft/loose soil/\ complete all as specified and directed by Engineer-in-charge. | 205 | Cubic Metre | 10 | ₹2,050 |
| 4 | Removal of excavated soil material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed by Engineer-in-charge. | 10 | Cubic Metre | 10 | ₹100 |
| 5 | Taking up or down 20 mm bore galvanised steel water tubing including connections, fixed in walls, ceiling or laid under floor or laid in trenches etc complete all as specified and directed by Engineer-in-charge.
Note :-Excavation and earthwork shall be measured and paid for separately. | 150 | RM | 10 | ₹1,500 |
| 6 | All as per Srl item No 4 above but 25 mm dia bore. | 250 | RM | 10 | ₹2,500 |
| 7 | All as per Srl item No 4 above but 40 mm dia bore. | 350 | RM | 10 | ₹3,500 |
| 8 | All as per Srl item No 4 above but 50 mm dia bore. | 650 | RM | 10 | ₹6,500 |
| 9 | All as per Srl item No 4 above but 80 mm dia bore. | 300 | RM | 10 | ₹3,000 |
| 10 | Taking up or down 100 mm bore GI/CI/DI including connections, fixed in walls, ceiling or laid under floor or laid in trenches etc complete all as specified and directed by Engineer-in-charge. | 110 | RM | 10 | ₹1,100 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tenderdocument.pdf
Tender Documents • 0.60 MB
BOQ_866671.xls
BOQ • 0.82 MB
AMD02.pdf
PDF • 0.57 MB
AMD8126.pdf
PDF • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .