Loading…
Loading…
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
21 Jul 2026, 6:00 pm
GE (AF) UTARLAI
GE (AF) UTARLAI PB No. 11 Barmer 344001 (Raj)
MAINT/ REPLACEMENT OF WATR PIPELINES, VALVES AND UG SUMP CLEANING AT TECH AREA OF AF STN UTARLAI
2026_MES_773993_1
8126/E8
Open Tender
Civil Works
180 days
Utarlai
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) UTARLAI
₹40,000
Yes
21 Jul 2026
22 Jun 2026
23 Jul 2026
22 Jun 2026
21 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for attending daily day to day complain regarding no water supply,leakage and break down of pipe line of GI upto 80 mm including necessary excavation with dewatering the water accumulated at site and solve the complain using required fittings or clamping arrangements, including testing for the leakages pipes complete all as specified and directed by Engineer-in-Charge.
Note:-Supply and fixing of pipe will be measured separately. | 300 | Each Job | 10 | ₹3,000 |
| 2 | Excavation in trenches, not exc 1.5 m wide and n. exc 1.5 m depth, or n exc 10 Sqm on plan and n exc 1.5 m in depth for foundations, shafts, wells, cesspits, manholes, pier holes, for foundations of poles, struts, stays etc. or laying underground cable and water supply pipe lines etc. in soft/loose soil, & getting out including taking out old brick or precast cable cover complete all as specified and directed by Engineer-in-Charge. | 215 | Cubic Metre | 10 | ₹2,150 |
| 3 | Returning, filling in, including spreading, leveling watering and well ramming in layers n.exc 25 cm in soft/loose soil/\ complete all as specified and directed by Engineer-in-charge. | 205 | Cubic Metre | 10 | ₹2,050 |
| 4 | Removal of excavated soil material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed by Engineer-in-charge. | 10 | Cubic Metre | 10 | ₹100 |
| 5 | Taking up or down 20 mm bore galvanised steel water tubing including connections, fixed in walls, ceiling or laid under floor or laid in trenches etc complete all as specified and directed by Engineer-in-charge.
Note :-Excavation and earthwork shall be measured and paid for separately. | 150 | RM | 10 | ₹1,500 |
| 6 | All as per Srl item No 4 above but 25 mm dia bore. | 250 | RM | 10 | ₹2,500 |
| 7 | All as per Srl item No 4 above but 40 mm dia bore. | 350 | RM | 10 | ₹3,500 |
| 8 | All as per Srl item No 4 above but 50 mm dia bore. | 650 | RM | 10 | ₹6,500 |
| 9 | All as per Srl item No 4 above but 80 mm dia bore. | 300 | RM | 10 | ₹3,000 |
| 10 | Taking up or down 100 mm bore GI/CI/DI including connections, fixed in walls, ceiling or laid under floor or laid in trenches etc complete all as specified and directed by Engineer-in-charge. | 110 | RM | 10 | ₹1,100 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tenderdocument.pdf
Tender Documents • 0.60 MB
BOQ_866671.xls
BOQ • 0.82 MB
AMD8126.pdf
PDF • 0.57 MB
Download all tender documents and submit your bid