| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.6 LAccepted-AOC RZ 50D GALI NO 13 VASHISHT PARK PANKHA ROAD NEW DELHI 110046 | NEW DELHI | DELHI | 110046 | L1 | Accepted-AOC AOC | |
| 2 | L2₹32.0 L+₹2.0 L (6.58%)Rejected-AOC | L2 | Rejected-AOC REJECTED | |
| 3 | L3₹32.2 L+₹2.2 L (7.30%)Rejected-AOC 1170 BENGALI MOHALLA NEAR PRABHAKAR HOSPITAL AMBALA CANTT 133001 | AMBALA | HARYANA | 133001 | L3 | Rejected-AOC REJECTED | |
| 4 | L4₹32.2 L+₹2.2 L (7.46%)Rejected-AOC WZ 576 577 NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L4 | Rejected-AOC REJECTED | |
| 5 | L5₹32.4 L+₹2.4 L (8.17%)Rejected-AOC | L5 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | M/s Navansh Engineers & Consultants L8 | R K Enterprises L2 | Parveen Builders L9 | H.B. Traders L7 | M/S Anand Enterprises L6 | D P ENTERPRISES L15 | A B K Enterprises L14 | PAWAN KUMAR L13 | Shiv Enterprises L4 | Saini Enterprises L12 | J.P. Enterprises L11 | PARAS ENTERPRISES L5 | SHAMMI ENTERPRISES L10 | The Rahul Vig L3 | M/S PARKASH ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Schedule-A | ||||||||||||||||||
| 1.01 | Excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for foundation, shafts, man holes,for under ground cable / erection of poles, stays, locating fault of LT cable and stay assembly etc not exceeding 10 square metre on plan and getting out in any type of soil including dressing/trimming of sides and leveling, grading and ramming of bottom of excavation complete all as specified and as directed. | 370 | Cum | 150 ₹55,500 | 120 ₹44,400 | 150 ₹55,500 | 145 ₹53,650 | 110 ₹40,700 Lowest | 160 ₹59,200 | 145 ₹53,650 | 170 ₹62,900 | 120 ₹44,400 | 170 ₹62,900 | 150 ₹55,500 | 150 ₹55,500 | 150 ₹55,500 | 200 ₹74,000 | 120 ₹44,400 |
| 2.00 | All as per Ser item No 1.00 here in before but depth exceeding 1.5 metre and not exceeding 3.0 metre. | 1 | Cum | 200 ₹200 | 1,000 ₹1,000 | 200 ₹200 | 149 ₹149 Lowest | 250 ₹250 | 250 ₹250 | 195 ₹195 | 220 ₹220 | 200 ₹200 | 220 ₹220 | 200 ₹200 | 150 ₹150 | 225 ₹225 | 200 ₹200 | 1,000 ₹1,000 |
| 3.00 | Returning, filling in, in soil, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each layer complete all as specified and directed. | 211 | Cum | 40 ₹8,440 | 20 ₹4,220 Lowest | 50 ₹10,550 | 148 ₹31,228 | 250 ₹52,750 | 50 ₹10,550 | 55 ₹11,605 | 60 ₹12,660 | 20 ₹4,220 Lowest | 50 ₹10,550 | 40 ₹8,440 | 150 ₹31,650 | 114 ₹24,054 | 200 ₹42,200 | 20 ₹4,220 Lowest |
| 4.00 | Removing excavated material/soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed. | 160 | Cum | 40 ₹6,400 | 20 ₹3,200 Lowest | 100 ₹16,000 | 148 ₹23,680 | 25 ₹4,000 | 50 ₹8,000 | 55 ₹8,800 | 60 ₹9,600 | 20 ₹3,200 Lowest | 50 ₹8,000 | 40 ₹6,400 | 150 ₹24,000 | 200 ₹32,000 | 200 ₹32,000 | 20 ₹3,200 Lowest |
| 5.00 | Material and labour sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable) complete all as specified and as directed. | 108 | CUM | 390 ₹42,120 | 500 ₹54,000 | 400 ₹43,200 | 245 ₹26,460 | 600 ₹64,800 | 900 ₹97,200 | 655 ₹70,740 | 600 ₹64,800 | 500 ₹54,000 | 650 ₹70,200 | 700 ₹75,600 | 250 ₹27,000 | 400 ₹43,200 | 500 ₹54,000 | 225 ₹24,300 Lowest |
| 6.00 | Supply and lay bricks, common burnt clay, sub class "B', old size, laid in vertical direction to cable as cable protection complete all as specified and as directed. | 6 | Per 1000 | 5,000 ₹30,000 | 6,500 ₹39,000 | 4,000 ₹24,000 | 6,200 ₹37,200 | 6 ₹36 Lowest | 7,450 ₹44,700 | 7,350 ₹44,100 | 7,300 ₹43,800 | 7,000 ₹42,000 | 7,100 ₹42,600 | 7,000 ₹42,000 | 6,000 ₹36,000 | 3,885 ₹23,310 | 8,000 ₹48,000 | 4,500 ₹27,000 |
| 7.00 | All as per Ser Item No 6.00 here in before but except bricks, all as specified and directed.
Note:- Old bricks retrieved from Ser Item No 11 to 13 here in after shall be re-used. | 4,500 | Each | 1 ₹4,500 Lowest | 2 ₹9,000 | 2 ₹9,000 | 2 ₹9,000 | 2 ₹9,000 | 2.5 ₹11,250 | 3 ₹13,500 | 3 ₹13,500 | 2 ₹9,000 | 3 ₹13,500 | 2 ₹9,000 | 3 ₹13,500 | 10 ₹45,000 | 1 ₹4,500 Lowest | 1 ₹4,500 Lowest |
| 8.00 | Material & labour for cement concrete in foundations, filling and mass concrete PCC as foundation to poles, type D2, 1:4:8 using 40 mm graded stone agregate as foundations to poles all as specified. | 1 | Cum | 3,500 ₹3,500 | 5,000 ₹5,000 | 2,000 ₹2,000 Lowest | 2,200 ₹2,200 | 2,500 ₹2,500 | 5,500 ₹5,500 | 4,690 ₹4,690 | 4,000 ₹4,000 | 4,000 ₹4,000 | 4,500 ₹4,500 | 4,000 ₹4,000 | 2,200 ₹2,200 | 3,900 ₹3,900 | 2,000 ₹2,000 Lowest | 5,000 ₹5,000 |
| 9.00 | Material & labour for Cement concrete, filling and mass concrete, PCC type C2, 1:3:6 using 20 mm graded aggregate all as specified. | 5 | Cum | 3,500 ₹17,500 | 3,000 ₹15,000 | 3,000 ₹15,000 | 2,189 ₹10,945 | 2,500 ₹12,500 | 5,500 ₹27,500 | 4,690 ₹23,450 | 4,500 ₹22,500 | 2,000 ₹10,000 Lowest | 5,000 ₹25,000 | 4,000 ₹20,000 | 2,400 ₹12,000 | 4,500 ₹22,500 | 2,000 ₹10,000 Lowest | 3,000 ₹15,000 |
Tender Value
₹44 L
EMD Value
₹88,000
Closing Date
30 Jun 2026, 6:00 pmClosed
GE (AF) Gurgaon No 1
GE (AF) Gurgaon No 1 Near Atul Kataria Chowk Gurgaon-122005
CA NO. GE AF NO.1 / GUR-49 / 2026-27 REPAIR/MAINTENANCE OF STREET LIGHTS, PERIMETER SECURITY LIGHTS, HIGH MAST LIGHTS, SOLAR LIGHTS AND INCL ALLIED WORKS AT X AREA AND REPAIR/MAINT OF INTERNAL POINT WIRING FITTINGS/ FIXTURES, CEILING FAN 54 asp
2026_MES_770903_1
GE(AF) No 1/GUR-49/2026-27
Open Tender
Miscellaneous Works
Item Rate
180 days
GE (AF) Gurgaon No 1
ALL AS PER NIT
10 documents required · 10 mandatory
₹500
GE (AF) Gurgaon No 1
₹88,000
Yes
17 Aug 2026
10 Jun 2026
2 Jul 2026
10 Jun 2026
30 Jun 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule-A | |||||
| 1.01 | Excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for foundation, shafts, man holes,for under ground cable / erection of poles, stays, locating fault of LT cable and stay assembly etc not exceeding 10 square metre on plan and getting out in any type of soil including dressing/trimming of sides and leveling, grading and ramming of bottom of excavation complete all as specified and as directed. | 370 | Cum | - | - |
| 2 | All as per Ser item No 1.00 here in before but depth exceeding 1.5 metre and not exceeding 3.0 metre. | 1 | Cum | - | - |
| 3 | Returning, filling in, in soil, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each layer complete all as specified and directed. | 211 | Cum | - | - |
| 4 | Removing excavated material/soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed. | 160 | Cum | - | - |
| 5 | Material and labour sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and 15 cms deep after laying the cable (punned down to 18 cms depth after laying and stretching of cable) complete all as specified and as directed. | 108 | CUM | - | - |
| 6 | Supply and lay bricks, common burnt clay, sub class "B', old size, laid in vertical direction to cable as cable protection complete all as specified and as directed. | 6 | Per 1000 | - | - |
| 7 | All as per Ser Item No 6.00 here in before but except bricks, all as specified and directed.
Note:- Old bricks retrieved from Ser Item No 11 to 13 here in after shall be re-used. | 4,500 | Each | - | - |
| 8 | Material & labour for cement concrete in foundations, filling and mass concrete PCC as foundation to poles, type D2, 1:4:8 using 40 mm graded stone agregate as foundations to poles all as specified. | 1 | Cum | - | - |
| 9 | Material & labour for Cement concrete, filling and mass concrete, PCC type C2, 1:3:6 using 20 mm graded aggregate all as specified. | 5 | Cum | - | - |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_863302.xls
BOQ • 1.23 MB
TenderDocument49.pdf
Tender Documents • 1.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .